The drainage district includes forty-two tracts of forty acres each, and the report of the engineer adopted by the board of supervisors, recommended the laying of tile throughout; the main tile to begin at the center of the northwest quarter of section 1, in township 82 N., of range 31, extend along a natural channel in a westerly direction to the west side of the road between sections 2 and 3, and thence south along the west side of the highway to a point fifteen rods south of the quarter section corner, and thence diagonally across the road into Greenbriar Creek, the end to be protected with a concrete wall, apron, and bulk head. The specifications called for twenty-two-inch tile in the last six thousand two hundred and sixteen feet; sixteen-inch tile in the next nine hundred [*217] feet; fifteen-inch, tile in 'the next one thousand five hundred and forty-four feet; fourteen-inch tile in the next six hundred feet; twelve-inch tile in the next two thousand four hundred feet; and ten-inch tile in the next eight hundred feet. From the main tile Branch A was to extend to the center line of section 34, in township 83 N., of range 31, in a natural draw, with fifteen-inch tile in three thousand two hundred feet; fourteen-inch tile in one thousand five hundred feet; twelve-inch tile in one thousand feet; ten-inch tile in one thousand feet; eight-inch tile in one thousand feet. From this branch another was to extend to a point on the east line of the east half of the northwest quarter of said section 34 about one hundred feet south of the center of said line, half with ten-inch tile and the other half with eight-inch tile. The lást-described land is that on which the assessments are alleged to have been excessive. Four other branches were recommended; three of which to extend into section 35, and the other into section 36, in said township 83, in which the tile was to be six, seven and eight inches in diameter. The lands included in the district and assessed are the southeast quarter of the southeast quarter of section 27, the east half and the east half of the west half of section 34, the south half, the south half of the northwest quarter, and the southwest quarter of the northeast quarter ' of section 35, and the southwest quarter of the southwest quarter of section 36, in township 83 N., of range 31, and the north half of the northeast quarter, southeast quarter.of the northeast quarter, and northeast quarter of the southeast-quarter of section 3, the north half and the northwest quarter of the southwest quarter of section 2, and the northwest quarter of section 1, in township 82, north, of range 31. The estimated cost of the improvement was $8,300, or $7.28 per acre 'on the one thousand one hundred and forty acres which it was thought would be benefited.
Nothing in the record, aside from the siiie of the tile recommended and the situation of the water courses, in [*218] dicates the character of the land's other than those immediately adjoining the premises of plaintiff, so that any inquiry as to whether the costs and expenses of the improvement was justly and equitably apportioned against the several , tracts according to the benefits to accrue is impossible.
The plaintiff did object, however, to the assessments on the ground that these exceeded the benefits which would result to the respective tracts of land, and this issue was fairly presented by the evidence. It will be noted that none of the tile was to be laid on plaintiff’s land, and no claim-is made that the eight-inch branch, extending to a point one hundred feet below the center of the east line, alone will drain any portion of it. The benefit, if any, to be derived therefrom, lies in its future use as an outlet through which to drain the premises. The assessment against the north forty acres was $107.75, and against the south forty acres was $247.37, or $355.12 in all. Five of the witnesses called by plaintiff estimated the benefits to accrue from the improvement at $100 or less and another at $150. One of the witnesses for the defendant, who also was one of the appraisers, estimated the benefits to the land from the outlet at from $100 to $150, and explained that in fixing the assessments the appraisers proceeded on the theory that plaintiff might drain the south nineteen acres .of . the south quarter southeasterly. through .a . drain [*219] to be constructed by her in the lands of blears and Henderson to connect with the tile drain some fifty to seventy-five rods away. No provision therefor appears in the specifications, and for all that appears this outlet would not be available save by condemnation of. a right of way under the recent amendment to the Constitution. All these witnesses had been familiar with the lands for many years. Another appraiser testified that he could not state the value in dollars and cents, but thought that if it was his land the improvement would add $5 per acre to it.
From what has been said, it is manifest that the decided weight of the evidence is to the effect that the assessments were largely in excess of the benefits, and this conclusion is confirmed by the proof concerning the character of the land. The north forty, except where occupied by the buildings, had been cultivated since 1815. The ridge forming the rim of the watershed, constituting the drainage district, is near the west side, and considerable land drains to the west and north. The top of the ridge is about twenty-five feet above the point on the east line touched by the tile drain, the land gradually sloping therefrom to the southeast and east far beyond the east line. [*221] The fall of the land to the east of that line is a foot for every ten rods for eighty rods. The engineer who made the preliminary survey testified that “so far as the surface water of the north forty is concerned, there was no necessity for artificial drainage,” but several/witnesses were of opinion that tiling would enhance somewhat the value of seven or eight acres for crop purposes, though no water stood on it or ever had. About nineteen acres of the south forty acres drain to the south and southeast. The land is high at the southwest corner, with - two little depressions or ponds in it, and from about one-third the way across it slopes to the south and southeast, the drainage being in a southeasterly direction through the southwest quarter and the south half of the southeast quarter of section 35. To reach the tile outlet in draining about nineteen acres would require a cut of seven feet, and the engineer who niade the preliminary survey was of opinion that it would be impractical to draw the surface water from the southeast corner over to the proposed outlet. The remaining' or north twenty-one acres appear to slope to the east and to drain toward the outlet. Near the outlet is a pond of about one-third acre, and this is surrounded by about five acres of hay land, from which there is a depression or swale extending toward the west where the slope becomes more abrupt. The evidence warrants the conclusion that there are six or eight acres in the north part of the south forty, and possibly several more, which would be enhanced in value above the cost of laying the tile therein to connect with the outlet. The record has satisfied us that the assessments considerably exceed the benefits to be conferred, to say nothing of the probable excess due to the peculiar method which appears to have been adopted in apportioning the costs and expenses to the several tracts by additions because of distance from the outlet, amounting to about one-third of the assessment against plaintiff’s land. In harmony with the clear preponderance of the evidence, the [*222] assessment against the north forty acres will be reduced to $50, and the south forty acres will be reduced to $100. The cause will be remanded -for decree in harmony with this conclusion.