v.
WESTERN MORTGAGE & WARRANTY TITLE CO.
delivered the opinion of the court.
In this case the plaintiff had verdict and judgment. The defendants have appealed from the judgment and order denying their motion for a new trial.
The plaintiff owns a lot, with a building thereon, situate on the east side of Main Street in the city of Helena, and described as No. 113 North Main Street. The defendant Western Mortgage & Warranty Title Company owns a lot, with a building thereon six stories high, situate on the west side of the street opposite the property of the plaintiff, and known as the Granite Block. After reciting the foregoing, the complaint alleges: “That on or about the 6th day of December, 1912, the defendants did wrongfully and negligently cause and permit a large piece of galvanized iron, to wit, a piece of galvanized iron 28 inches wide and- inches long, to be placed upon the roof of said Granite Block building without fastening or securing said piece of galvanized iron to said building in any manner, and negligently and carelessly allowed the same to thus remain at a great height above the said street and surrounding buildings, including the property of this plaintiff above referred to, notwithstanding the fact that the said defendants well knew, or in the exercise of ordinary care should have known, that the said piece of galvanized iron was likely to be blown and to fall to the said street below and upon and against the property and building of this plaintiff aforesaid; so that, and by reason of said negligence, said piece of galvanized iron did, on or about the 7th day of December, 1912, fall from the roof of said Granite Block building into said Main Street and against the aforesaid building, the property of this plaintiff, breaking and destroying the plate glass of a window therein to the damage of [*96] plaintiff in the sum of $450.” Judgment is demanded for $450 and costs. Before the trial the action was dismissed as to the defendant Groseclose. The joint answer of the other defendants, admitting that the window was broken at the time stated, denies all the allegations imputing negligence to them or Cither of them, and alleges that the window was broken by an act of God, viz., an extraordinary windstorm. There was issue by reply.
The contentions made by the defendants are that the court erred in denying their motion for a nonsuit, and in submitting certain instructions to the jury.
There is no substantial conflict in the evidence, except as to the extraordinary character of the wind which occurred at the time of the accident. That introduced by the plaintiff may be epitomized as follows: Defendant Kleinschmidt was the manager of the defendant corporation and in personal charge of the Granite Block. The roof of the building is flat, with a slope toward the rear sufficient for drainage purposes. There is no substantial barrier to prevent a free sweep of the wind over the entire surface. About the middle of the roof and elevated above its surface is a skylight oblong in shape. Its roof pitches at an angle of forty-five degrees both at the side and ends. It had originally been covered with roofing glass. Some of the panes having been broken out by a previous storm, they had been replaced by pieces of galvanized sheet iron. The pieces of iron were of different sizes and weights. One of them, which the evidence shows was blown against the plaintiff’s window, was twenty-four inches in width, between five and six feet in length, and weighed about six pounds. On December 5, 1912, two days before the accident, under a contract let to him by Kleinsehmidt, Groseclose, one of the original defendants, a roofing contractor, began to repair the skylight by replacing the sheets of iron with glass. The contract was that Kleinschmidt should furnish the glass and Groseclose should install it for a lump sum of $35. Groseclose was not required by the terms of the contract to remove the debris when the repairs were completed. [*97] The removal would involve additional labor and expense. By 2 o’clock on the afternoon of December 6, the work had been completed, except some of the small triangular spaces along the hips of the roof and at their juncture with the ridge. The workmen had experienced difficulty in cutting the glass to fit into these spaces without cracking it. They covered them temporarily with uncut pieces and left them until they could ascertain from Kleinschmidt, who was then away from the building, whether they should attempt to fit glass into them or cover these spaces with tin. The pieces of iron taken out they left lying-loose upon the roof of the building. The edges of them had been folded in order to fit them into the frames of the skylight, with the result that they did not lie flat on the roof, and for that reason could readily be caught up and carried away by the wind. A day or two later the workmen returned and completed the work. The building is ninety-six feet high. Main Street is sixty feet wide and extends from the north to the south. The repairs were contracted for, and were undertaken at the season of the year when high winds are frequent, the testimony showing that during the month of December for twenty years winds of a velocity of forty miles an hour and higher had not been unusual, and that the general direction of them had been from west to east. The damage necessitating repairs upon the skylight had been caused by a windstorm which had attained a velocity of seventy miles per hour. For the two hours between 1 and 3 o’clock on the morning of December 7, during which the plaintiff’s window was broken, the wind attained a velocity of thirty-seven miles. The debris left upon the roof, including the sheet iron, had value, and belonged to the defendant corporation. No precaution was taken to prevent it from being blown off. Kleinschmidt, being heavy and somewhat -advanced in years, did not go upon the roof during-the progress -of the repairs, but depended upon one Teeters, employed as janitor of the building, to see that the work was properly done. Teeters was there frequently, and upon his rep. [*98] resentation to Kleinschmidt that the repairs had been completed according to the contract Kleinschmidt paid the contract price.
Counsel for defendants contends that the evidence does not show that Teeters was the agent of the defendant corporation, or had any authority to represent it for any purpose. We cannot perceive the pertinency of this contention. It does not aid in any way the solution of the question whether the corporation and Kleinschmidt, its manager and admittedly responsible agent, were guilty of culpable negligence as charged in the complant. It is not controverted that they were unless the evidence justifies the conclusion that the accident was caused exclusively by the negligence of Groseelose, who, it is insisted, was an independent contractor and solely responsible, or was attributable to an unusually high wind, the occurrence of which could not reasonably have been anticipated. In view of this concession it is wholly immaterial to inquire what the relation of Teeters to the corporation was, or to consider what was the scope of his authority.
The contention that Groseelose was solely responsible upon the
It is argued that the breaking of the window was caused by
Several of the assignments allege error in particular instructions; but beyond a general statement in counsel’s brief that they cast too great a burden upon the defendants, none of them are discussed. "We have made such examination of them, in connection with the others submitted, as we have been able without the aid of argument, and are of the opinion' that the charge as a whole fully covers the case as made by the pleadings and the evidence, and that it was as fair to defendants as they could demand. Under the circumstances we do not deem it incumbent upon us to take up the particular paragraphs seriatim and examine them.
The judgment and order are affirmed.
Affirmed.