Florida Statutes

Fla. Stat. § 311.106 (2025)

Seaport stormwater permitting and mitigation.

✓ 2025 Florida Statutes — current through the 2025 Regular Session
Find cases: SyfertCases citing this section FL-LEGleg.state.fl.us JustiaFla. Statutes CornellLII Search CasesGoogle Scholar
311.106 Seaport stormwater permitting and mitigation.A seaport listed in s. 403.021(9)(b) is authorized to provide for onsite or offsite stormwater treatment for water quality impacts caused by a proposed port activity that requires a permit and that causes or contributes to pollution from stormwater runoff. Offsite stormwater treatment may occur outside of the established boundaries of the port, but must be within the same drainage basin in which the port activity occurs. A port offsite stormwater treatment project must be constructed and maintained by the seaport or by the seaport in conjunction with an adjacent local government. In order to limit stormwater treatment from individual parcels within a port, a seaport may provide for a regional stormwater treatment facility that must be constructed and maintained by the seaport or by the seaport in conjunction with an adjacent local government.
History.s. 13, ch. 2012-174.

This Florida statute resource is curated by this site's author, a Jacksonville, Florida personal injury and workers' compensation attorney (Florida Bar No. 39104). For legal consultation, call 904-383-7448.