Michigan Compiled Laws homeSearch Michigan
Mich. Comp. LawsMichigan Compiled LawsChapter 570Act 497 of 1980

Mich. Comp. Laws § 570.1109 (2026)

Subcontractor, supplier, or laborer contracting to provide improvement to real property; service of notice of furnishing; form of notice; effect of failure by lien claimant to provide notice within time specified; failure of laborer to provide notice of furnishing; authorization of agent by laborers to prepare and serve notice.

Edition and currency
laws through the 2026 session (checked Aug. 2026). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTlaws through the 2026 session (checked Aug. 2026) cited 1982–2024 21citing cases
At a glance

Courts have cited this section in 21 opinions since 1982, 3 of them in the last five years. The most litigated part is subsection (6) (8 cases).

CONSTRUCTION LIEN ACT


Act 497 of 1980


570.1109 Subcontractor, supplier, or laborer contracting to provide improvement to real property; service of notice of furnishing; form of notice; effect of failure by lien claimant to provide notice within time specified; failure of laborer to provide notice of furnishing; authorization of agent by laborers to prepare and serve notice.

Sec. 109.

    (1) Except as otherwise provided in sections 108 and 108a, a subcontractor or supplier that contracts to provide an improvement to real property shall provide a notice of furnishing to the designee and the general contractor, if any, as named in the notice of commencement at the address shown in the notice of commencement, either personally or by certified mail, within 20 days after furnishing the first labor or material. If a designee has not been named in the notice of commencement, or if the designee has died, service must be made on the owner or lessee named in the notice of commencement. If service of the notice of furnishing is made by certified mail, service is complete on mailing. A contractor is not required to provide a notice of furnishing to preserve lien rights arising from his or her contract directly with an owner or lessee.

    (2) Except as otherwise provided in sections 108 and 108a, a laborer who contracts to provide an improvement to real property shall provide a notice of furnishing to the designee and the general contractor, if any, as named in the notice of commencement at the address shown in the notice of commencement, either personally or by mail, within 30 days after wages were contractually due but were not paid. If a designee has not been named in the notice of commencement, or if the designee has died, service must be made on the owner or lessee named in the notice of commencement. If service of the notice of furnishing is made by mail, service is complete on mailing by first class mail with postage prepaid.

    (3) Except as otherwise provided in sections 108 and 108a, a laborer who provides an improvement to real property shall provide a notice of furnishing to the designee and the general contractor, if any, named in the notice of commencement at the address shown in the notice of commencement, either personally or by certified mail, by the fifth day of the second month following the month in which fringe benefits or withholdings from wages were contractually due but were not paid. If a designee has not been named in the notice of commencement, or if the designee has died, service must be made on the owner or lessee named in the notice of commencement. If service of the notice of furnishing is made by certified mail, service is complete on mailing.

    (4) A notice of furnishing, if not given on the form attached to the notice of commencement, must be in substantially the following form:

    

    NOTICE OF FURNISHING

    To: ...............................................................

    (name of designee (or owner or lessee) from notice of commencement)

    

    ...............................................................

    (address from notice of commencement)

    Please take notice that the undersigned is furnishing to ..........

    ...................................................................

    (name and address of other contracting party)

    certain labor or material for ....................................,

    

    (describe type of work)

    in connection with the improvements to the real property described

    in the notice of commencement recorded in liber .............., on

    page ........., ......................................... records,

    (name of county)

    ...................................................................

    or (a copy of which is attached to this notice)

    WARNING TO OWNER: THIS NOTICE IS REQUIRED BY THE MICHIGAN CONSTRUCTION LIEN ACT. IF YOU HAVE QUESTIONS ABOUT YOUR RIGHTS AND DUTIES UNDER THIS ACT, YOU SHOULD CONTACT AN ATTORNEY TO PROTECT YOU FROM THE POSSIBILITY OF PAYING TWICE FOR THE IMPROVEMENTS TO YOUR PROPERTY.

    

    ....................................

    

    (name and address of lien claimant)

     

    by .................................

    

    (name and capacity of party signing for lien claimant)

    

    ....................................

    

    (address of party signing)

    Date:....................... .

    (5) The failure of a lien claimant to provide a notice of furnishing within the time specified in this section does not defeat the lien claimant's right to a construction lien for work performed or materials furnished by the lien claimant after the service of the notice of furnishing.

    (6) The failure of a lien claimant to provide a notice of furnishing within the time specified in this section does not defeat the lien claimant's right to a construction lien for work performed or materials furnished by the lien claimant before the service of the notice of furnishing except to the extent that payments were made by or on behalf of the owner or lessee to the contractor pursuant to either a contractor's sworn statement or a waiver of lien in accordance with this act for work performed or material delivered by the lien claimant. This subsection does not apply to a laborer.

    (7) The failure of a laborer to provide a notice of furnishing to the designee as required by subsection (2) defeats the laborer's lien for the wages for which the notice of furnishing is required.

    (8) The failure of a laborer to provide a notice of furnishing to the designee as required by subsection (3) defeats the laborer's lien for the fringe benefits and withholdings for which the notice of furnishing is required.

    (9) The failure of a laborer to provide a notice of furnishing to the general contractor within the time specified in subsection (2) or (3) does not defeat the laborer's right to a construction lien, but the laborer is liable for any actual damages sustained by the general contractor as a result of the failure.

    (10) One or more laborers may authorize an agent to prepare and serve a notice of furnishing in the manner provided in this section. Notice of furnishing under this section may contain the notice of furnishing of more than 1 laborer and must contain the information required by subsection (4) as to each laborer for whom it is prepared. A court shall consider the notice of furnishing of each lien claimant under this subsection on its own merits.

    

History: 1980, Act 497, Eff. Jan. 1, 1982 ;-- Am. 1981, Act 191, Eff. Jan. 1, 1982 ;-- Am. 1982, Act 17, Eff. Mar. 1, 1982 ;-- Am. 2018, Act 367, Imd. Eff. Dec. 12, 2018

The 20 cases that cite Mich. Comp. Laws § 570.1109 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENVugterveen Sys., Inc. v. Olde Millpond Corp., 560 N.W.2d 43 (Mich. 1997).
cites § 570.1109 7×subsections: (5) 2× (6) 2× (1) (4)cited by 22 cases
Where it cites § 570.1109
“MCL 570.1109; MSA 26.316(109). McAlpine & Keating, supra, §§ 4.”
The case’s holding
An owner's defense under the construction lien act regarding contract price limits applies only to payments made on the specific contract between the owner and the contracting party.
Later courts cite it for
“was intended to protect the interests of contractors, workers, and suppliers through construction liens, while protecting owners from excessive costs.” · 7 citing courts
2
GREENFischer-Flack, Inc v. Churchfield, 447 N.W.2d 813 (Mich. Ct. App. 1989).
cites § 570.1109 8×subsections: (1) 8×cited by 9 cases
Where it cites § 570.1109
“On September 23, 1985, plaintiff purportedly provided a "notice of furnishing" by certified mail to the owner, his designee, and the general contractor, pursuant to § 109 of the Construction Lien Act, MCL 570.1109(1); MSA 26.316(109)(1). Plaintiff furnished its first supplies to…”
3
GREENSchuster Constr. Servs., Inc. v. Painia Dev. Corp., 651 N.W.2d 749 (Mich. Ct. App. 2002).
cites § 570.1109 9×subsections: (6) 4× (1) 2× (5)cited by 4 cases
Where it cites § 570.1109
“See MCL 570.1109. Plaintiff does not claim to have otherwise notified defendant of its interest before defendant paid Roper in full.”
4
GREENCent. Ceiling & Parttiton, Inc v. Dep't of Com., 642 N.W.2d 397 (Mich. Ct. App. 2002).
cites § 570.1109 6×cited by 7 cases
Where it cites § 570.1109
“1109], the right of a contractor, subcontractor, laborer, or supplier to a construction lien created by this act shall cease to exist unless, within 90 days after the lien claimant's last furnishing of labor or material for the improvement, pursuant to the lien claimant's…”
5
GREENAlan Custom Homes, Inc v. Krol, 667 N.W.2d 379 (Mich. Ct. App. 2003).
cites § 570.1109 1×cited by 166 cases
Where it cites § 570.1109
“1111(1), the Supreme Court noted that application of the “substantial compliance” provision was well suited to notice provisions where the purpose of the requirement is to ensure that notice was received, citing Vugterveen’s application of the “substantial compliance” provision…”
The case’s holding
Providing unverified statements to a title company and a verified statement to an owner constitutes substantial compliance with the notice requirements of the Construction Lien Act.
Later courts cite it for
“the party asserting a breach of contract has the burden of proving its damages with reasonable certainty, and may recover only those damages that are the direct, natural, and proximate result of the breach.” · 49 citing courts
6
GREENBig L Corp. v. Courtland Const. Co., 757 N.W.2d 852 (Mich. 2008).
cites § 570.1109 9×subsections: (4)cited by 2 cases
Where it cites § 570.1109
“It provides a sample "sworn statement" and creates penalties for making false sworn statements with intent to defraud.”
cites § 570.1109 2×cited by 35 cases
Where it cites § 570.1109
“Such provisions are not as well suited to a “substantial compliance” application as, for example, provisions requiring that certain information be filed with, or that certain showings be made before, public authorities or property owners.”
The case’s holding
The substantial compliance provision of the Construction Lien Act does not apply to the strict ninety-day deadline for recording a construction lien.
Later courts cite it for
“it is a cardinal rule of statutory construction that a clear and unambiguous statute warrants no further interpretation and requires full compliance with its provisions, as written.” · 3 citing courts
8
GREENC D Barnes Assocs. Inc. v. Star Heaven, LLC, 834 N.W.2d 878 (Mich. Ct. App. 2013).
cites § 570.1109 1×cited by 56 cases
Where it cites § 570.1109
“bcontractor) to represent to the owner or lessee of the property and his or her agents that the property is free from claims of construction liens, or the possibility of construction liens, except as specifically set forth in this statement and except for claims of construction…”
The case’s holding
Attorney fees awarded to a prevailing construction lien claimant must be entered as a separate judgment and cannot be added to the construction lien amount.
Later courts cite it for
“an issue becomes moot when an event occurs that renders it impossible for the reviewing court to grant relief.” · 7 citing courts
9
GREENPi-Con, Inc. v. a J Anderson Constr. Co., 458 N.W.2d 639 (Mich. 1990).
cites § 570.1109 2×cited by 17 cases
Where it cites § 570.1109
“[MCL 570.1109; MSA 26.316(109). Emphasis added.”
The case’s holding
A claimant may recover on a public works payment bond despite ordinary-mail notice if it proves by a preponderance of the evidence that the contractor actually received timely, written, compliant notice.
10
NEUTRALHorton v. Verhelle, 588 N.W.2d 144 (Mich. Ct. App. 1998).
cites § 570.1109 10×subsections: (6) 6× (1) 2× (5) 2×cited by 11 cases
Where it cites § 570.1109
“MCL 570.1109(1); MSA 26.316(109)(1). Plaintiff and RBK et al.”
11
REDBig L Corp. v. Courtland Constr. Co., 750 N.W.2d 628 (Mich. Ct. App. 2008).
cites § 570.1109 3×subsections: (6) 2× (1)cited by 2 cases
Vacated in part by Big L Corp. v. Courtland Const. Co. (2008): the Michigan Supreme Court's own opinion in this case ("Order On order of the Court, the application for leave to appeal the April 1, 2008 judgment of the Court of Ap…
Where it cites § 570.1109
“1108(1); MCL 570.1109(1); Vugterveen, supra at 122 .”
12
GREENMPC Cashway Lumber Co. v. Hull, 606 N.W.2d 392 (Mich. Ct. App. 2000).
cites § 570.1109 2×subsections: (6)cited by 2 cases
Where it cites § 570.1109
“316(109), provides in pertinent part: *445 (1) Except as otherwise provided in sections 108, 108a, and 301, a subcontractor or supplier who contracts to provide an improvement to real property shall provide a notice of furnishing to the designee and the general contractor, if…”
13
REDVugterveen Sys., Inc. v. Olde Millpond Corp., 533 N.W.2d 320 (Mich. Ct. App. 1995).
cites § 570.1109 2×subsections: (1) (6)cited by 7 cases
Vacated in part by Vugterveen Systems, Inc. v. Olde Millpond Corp. (1997): the Michigan Supreme Court's own opinion in this case ("Thus, the decision of the Court of Appeals is affirmed in part and vacated in part, and the case i…
Where it cites § 570.1109
“However, failure to provide a notice of furnishing within the time specified does not defeat the lien claimant’s right to a construction lien for work performed or materials furnished by the lien claimant before the service of the notice of furnishing except to the extent that…”
14
NEUTRALSteelcon, Inc. v. Bennett & Wright Grp., Inc., 257 F. Supp. 2d 895 (E.D. Mich. 2003).
cites § 570.1109 5×subsections: (6) 2×cited by 1 case
Where it cites § 570.1109
“Mich. Comp. Laws Ann. § 570.1109 . 3 . Since filing these motions, Steelcon and Blue Circle settled their dispute.”
15
NEUTRALStock Bldg. Supply, LLC v. Parsley Homes of Mazuchet Harbor, LLC, 804 N.W.2d 898 (Mich. Ct. App. 2011).
cites § 570.1109 1×cited by 5 cases
Where it cites § 570.1109
“, provides: [Notwithstanding [MCL 570.1109], the right of a contractor, subcontractor, laborer, or supplier to a construction lien created by this act shall cease to exist unless, within 90 days after the lien claimant’s last furnishing of labor or material for the improvement,…”
Later courts cite it for
“questions regarding the interpretation and application of statutes, including the construction lien act, are reviewed de novo on appeal.” · 2 citing courts
16
NEUTRALJ & I Serv. Station, Inc v. Wash Wagon of Michigan, Inc, 327 N.W.2d 518 (Mich. Ct. App. 1982).
cites § 570.1109 1×cited by 3 cases
Where it cites § 570.1109
“See MCL 570.1109; MSA 26.316(109). 4 Notice of intention to claim a lien is unnecessary when the proposed lienor deals directly with the property owner.”
17
NO FLAGCarol Dubuc v. Copeland Paving Inc, No. 325228 (Mich. Ct. App. Mar. 29, 2016).
cites § 570.1109 1×subsections: (6)cited by 0 casesunpublished
Where it cites § 570.1109
“Accordingly, Copeland’s voluntary act of conceding the existence of the down payment when recording its lien, long after the time the payment was actually made and a sworn statement should have issued, has no legal effect on Ajax’s right to file a lien for the amount owed to it.”
18
NO FLAGWest Lansing Retail Dev. LLC v. Kris Krstovski, No. 365181 (Mich. Ct. App. Nov. 9, 2023).
cites § 570.1109 1×cited by 0 casesunpublished
Where it cites § 570.1109
“1108a, or MCL 570.1109] and who performs the covenants contained in the land contract or lease within 30 days after receiving actual notice of the forfeiture, surrender, or termination is subrogated to -3- the rights of the contracting vendee or lessee as those rights existed…”
19
NO FLAGD West Lansing Retail Dev. LLC v. Kris Krstovski, No. 365181 (Mich. Ct. App. Nov. 9, 2023).
cites § 570.1109 1×cited by 0 casesunpublished
Where it cites § 570.1109
“1108a, or MCL 570.1109] and who performs the covenants contained in the land contract or lease within 30 days after receiving actual notice of the forfeiture, surrender, or termination is subrogated to the rights of the contracting vendee or lessee as those rights existed…”
20
NO FLAGPlumbers Local 98 Defined Benefit Pension Fund v. Oakland Contracting Co., No. 2:19-cv-12610 (E.D. Mich. Oct. 9, 2019).
cites § 570.1109 1×subsections: (3)cited by 0 casesunknown
Where it cites § 570.1109
“§ 570.1109(3) as an example of the need for urgency.”

Show all 21 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
198220032024

One bar per year. Tallest: 2 cases in 2002. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Mich. Ct. App.15Mich.4E.D. Mich.2
By subsection
(1)6 cases
Fischer-Flack, Inc v. Churchfield, 447 N.W.2d 813 (Mich. Ct. App. 1989).“On September 23, 1985, plaintiff purportedly provided a "notice of furnishing" by certified mail to the owner, his designee, and the general contractor, pursuant to § 109 of the Construction Lien Act, MCL 570.1109(1); MSA 26.316(109)(1). Plaintiff furnished its first supplies to…”
Schuster Constr. Servs., Inc. v. Painia Dev. Corp., 651 N.W.2d 749 (Mich. Ct. App. 2002).“See MCL 570.1109. Plaintiff does not claim to have otherwise notified defendant of its interest before defendant paid Roper in full.”
Vugterveen Sys., Inc. v. Olde Millpond Corp., 560 N.W.2d 43 (Mich. 1997).“MCL 570.1109; MSA 26.316(109). McAlpine & Keating, supra, §§ 4.”
Horton v. Verhelle, 588 N.W.2d 144 (Mich. Ct. App. 1998).“MCL 570.1109(1); MSA 26.316(109)(1). Plaintiff and RBK et al.”
Big L Corp. v. Courtland Constr. Co., 750 N.W.2d 628 (Mich. Ct. App. 2008).“1108(1); MCL 570.1109(1); Vugterveen, supra at 122 .”
Showing the top 5 of 6. More in the list view →
(3)1 case
Plumbers Local 98 Defined Benefit Pension Fund v. Oakland Contracting Co., No. 2:19-cv-12610 (E.D. Mich. Oct. 9, 2019).“§ 570.1109(3) as an example of the need for urgency.”
(4)2 cases
Big L Corp. v. Courtland Const. Co., 757 N.W.2d 852 (Mich. 2008).“It provides a sample "sworn statement" and creates penalties for making false sworn statements with intent to defraud.”
(5)3 cases
Schuster Constr. Servs., Inc. v. Painia Dev. Corp., 651 N.W.2d 749 (Mich. Ct. App. 2002).
Horton v. Verhelle, 588 N.W.2d 144 (Mich. Ct. App. 1998).
(6)8 cases
Schuster Constr. Servs., Inc. v. Painia Dev. Corp., 651 N.W.2d 749 (Mich. Ct. App. 2002).
Horton v. Verhelle, 588 N.W.2d 144 (Mich. Ct. App. 1998).
Big L Corp. v. Courtland Constr. Co., 750 N.W.2d 628 (Mich. Ct. App. 2008).
MPC Cashway Lumber Co. v. Hull, 606 N.W.2d 392 (Mich. Ct. App. 2000).“316(109), provides in pertinent part: *445 (1) Except as otherwise provided in sections 108, 108a, and 301, a subcontractor or supplier who contracts to provide an improvement to real property shall provide a notice of furnishing to the designee and the general contractor, if…”
Showing the top 5 of 8. More in the list view →

Show all 21 citing cases (list view) →

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.