City of Macon v. Macrive Constr., Inc., 525 S.E.2d 418 (Ga. Ct. App. 1999). · Go Syfert
City of Macon v. Macrive Constr., Inc., 525 S.E.2d 418 (Ga. Ct. App. 1999). Cases Citing This Book View Copy Cite
25 citation events (25 in the last 25 years) across 1 distinct court.
Strongest positive: Randall Klingensmith v. Long County, Georgia (gactapp, 2019-10-04)
Treatment trajectory · 2001 → 2026 · click a year to view as-of
2001 2013 2026
Top citers, strongest first. 1 distinct citer. How cited ↗
discussed Cited as authority (rule) Randall Klingensmith v. Long County, Georgia
Ga. Ct. App. · 2019 · confidence medium
See Kleber, supra, 285 Ga. at 417 (1); City of Macon v. Macrive Constr., 241 Ga. App. 396, 397 ( 525 SE2d 418 ) (1999) (no continuing nuisance shown where allegedly inadequate drainage system was complete more than four years prior to the filing of the nuisance suit, and no evidence showed that the city took any action after installation that increased the flooding problem).
Retrieving the full opinion text from the archive…
CITY OF MACON Et Al.
v.
MACRIVE CONSTRUCTION, INC. Et Al.
A99A1348.
Court of Appeals of Georgia.
Nov 17, 1999.
525 S.E.2d 418
James P. Langstaff, Charles L. Ruffin, for appellants., Hall, Bloch, Garland & Meyer, John F. Kennedy, John E. Hall IV, for appellees.
Miller, Pope, Smith.
Cited by 6 opinions  |  Published
Miller, Judge.

Homeowners Gaughfs and Rubins sued Macrive Construction, Inc., Rivers Construction Company, and related parties for nuisance created by an inadequate pipe in a drainage ditch located on the homeowners’ property which caused flooding during heavy rains. The City of Macon reconstructed the drainage ditch and jointly sued to recover the cost of repair. At the close of evidence at trial, the appel-lees successfully moved for a directed verdict on the grounds that nuisance is not the proper cause of action and that even if it were a nuisance, the statute of limitation had run. The City of Macon and the homeowners appeal. Because the statute of limitation had run, we affirm.

A directed verdict can be upheld only where all the evidence demands that verdict, which requires a de novo review. [1] Construed in favor of the appellants, the evidence showed that Macrive Construction installed a drainage pipe too small to handle the drainage of the two lots on which it was installed. The Rubins purchased one of the lots in 1984, and another family purchased the neighboring lot that same year. In the winter of 1985-1986 and several times each winter thereafter, flooding occurred after heavy rains and caused damage to both lots. The Gaughfs bought the neighboring lot from the other family in 1987.

After complaining to appellees to no avail, the homeowners sought help from the City of Macon, which reconstructed the drain[*397] age pipe to allow adequate flow and prevent further flooding. The City of Macon, the Rubins, and the Gaughfs filed suit in November 1990.

Decided November 17, 1999 Reconsideration denied December 10, 1999. James P. Langstaff, Charles L. Ruffin, for appellants. Hall, Bloch, Garland & Meyer, John F. Kennedy, John E. Hall IV, for appellees.

Assuming for the sake of argument that this was a nuisance, the action was barred by the four-year statute of limitation. [2] The parties brought suit in November 1990, more than four years after the flooding began. Macko v. City of Lawrenceville 3 held under nearly identical facts that the four-year statute of limitation on any alleged nuisance caused by installing inadequate drainage pipes began to run the year the property first flooded. Because no evidence showed that the developer-defendant took any action, subsequent to the year of the first flooding, that increased the flooding problem, Macko rejected the argument that repeated flooding caused the situation to be a continuing nuisance.

Similarly, here the installation of the drainage system was completed prior to the winter of 1985-1986, the time of the first flooding. “As such, any nuisance created by the allegedly inadequate system was complete and apparent [by the spring of 1986], more than four years prior to the filing of this suit.” [4] Since no evidence showed the appellees took any action subsequent to 1985 that increased the flooding problem, no continuing nuisance was shown.

The court did not err in granting the directed verdict in favor of the appellees.

Judgment affirmed.

Pope, P. J., and Smith, J., concur.
1

Carden v. Burckhalter, 214 Ga. App. 487, 488-489 (1) (b) (448 SE2d 251) (1994).

4

Id.