40 C.F.R. § 264.54

Amendment of contingency plan

Read at: eCFRecfr.gov CornellLII GovInfogovinfo.gov CasesGoogle Scholar

The contingency plan must be reviewed, and immediately amended, if necessary, whenever:

(a) The facility permit is revised;

(b) The plan fails in an emergency;

(c) The facility changes—in its design, construction, operation, maintenance, or other circumstances—in a way that materially increases the potential for fires, explosions, or releases of hazardous waste or hazardous waste constituents, or changes the response necessary in an emergency;

(d) The list of emergency coordinators changes; or

(e) The list of emergency equipment changes.

[45 FR 33221, May 19, 1980, as amended at 50 FR 4514, Jan. 31, 1985; 53 FR 37935, Sept. 28, 1988]
Notes of Decisions
Cited in 1 case, 1983–1983 · leading case: Opinion No. (1983) (Mo. Att'y Gen. 1983).
Opinion No. (1983) (Mo. Att'y Gen. 1983). “011 (5)(E), (5)(G)2, and (5)(G)7, the state regulations require certain things be done promptly, whereas 40 CFR 264.54 , 264.56 (b) and 264.56 (g) require those same things to be done immediately.”
Annotations are extracted automatically from the opinions in the Syfert caselaw corpus and ranked by authority, recency, and treatment. Dots show Syfertize treatment of the citing case itself.