49 C.F.R. § 568.6
Requirements for final-stage manufacturers
Each final-stage manufacturer shall complete the vehicle in such a manner that it conforms to the applicable standards in effect on the date selected by the final-stage manufacturer, including the date of manufacture of the incomplete vehicle, the date of final completion, or a date between those two dates. This requirement shall, however, be superseded by any conflicting provisions of a standard that applies by its terms to vehicles manufactured in two or more stages.
Notes of Decisions
Cited in 3
cases (1 in the last 5 years), 1973–2023 · leading case: Rex Chainbelt, Inc. v. Volpe, 486 F.2d 757 (7th Cir. 1973).
Boyle v. Ford Motor Co. (E.D. Mich. 2023). “” 49 C.F.R. § 568.6 . Plaintiff, a Florida resident, purchased a recreational vehicle from General RV in Dover, Florida.”
Rex Chainbelt, Inc. v. Claude S. Brinegar, Sec'y, Dep't of Transp., 511 F.2d 1215 (7th Cir. 1975). “Regulation 49 C.F.R. § 568.6 (b) required Rex, as the final stage manufacturer ( 49 C.”
Rex Chainbelt, Inc. v. Volpe, 486 F.2d 757 (7th Cir. 1973). “49 CFR § 568.6 (a). Federal safety standards currently cover such things as transmission shift levers, windshield defrosting, washing, and wiping, hood latches, brake fluids, door locks, seats, seat belts, and *759 crash protection.”
Annotations are extracted automatically from the opinions in the
Syfert caselaw corpus and ranked by authority, recency, and
treatment. Dots show Syfertize treatment of the citing case itself.