16 U.S.C. § 837e (2026)

Transmission lines for other electric energy; rates

Edition and currency
U.S. Code current through Pub. L. 119-102 (OLRC release point). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTU.S. Code current through Pub. L. 119-102 (OLRC release point) cited 1985–1997 3citing cases
At a glance

Courts have cited this section in 3 opinions since 1985.

Any capacity in Federal transmission lines connecting, either by themselves or with non-Federal lines, a generating plant in the Pacific Northwest or Canada with the other area or with any other area outside the Pacific Northwest, which is not required for the transmission of Federal energy or the energy described in section 837h of this title, shall be made available as a carrier for transmission of other electric energy between such areas. The transmission of other electric energy shall be at equitable rates determined by the Secretary, but such rates shall be subject to equitable adjustment at appropriate intervals not less frequently than once in every five years as agreed to by the parties. No contract for the transmission of non-Federal energy on a firm basis shall be affected by any increase, subsequent to the execution of such contract, in the requirements for transmission of Federal energy, the energy described in section 837h of this title, or other electric energy.

(Pub. L. 88–552, § 6, Aug. 31, 1964, 78 Stat. 758.)
The 3 cases that cite 16 U.S.C. § 837e most heavily, weighted by court and treatment. RelevanceNewestTreatment
cites § 837e 6×cited by 38 cases
Where it cites § 837e
“16 U.S.C. § 837e. Any capacity in the Intertie “which is not required for the transmission of Federal energy .”
The case’s holding
An agency's interpretation of its enabling statutes is valid if it is reasonable, even if it is not the only possible interpretation.
Later courts cite it for
“bpa is required to allocate use of federally-owned transmission facilities in a manner which accords preference first to transmission of federal power and then to transmission of other northwest-generated power.” · 2 citing courts
cites § 837e 7×cited by 2 cases
Where it cites § 837e
“16 U.S.C. § 837e. Any capacity in the Intertie “which is not required for the transmission of Federal energy .”
3
cites § 837e 1×cited by 3 cases
Where it cites § 837e
“16 U.S.C. § 837e. The Preference Act did not forbid allocating transmission capacity to the DSIs, even though the Project Act discussed the DSIs at length.”
The case’s holding
An agency may formulate a proposal or identify a preferred course of action before completing an environmental impact statement.
Later courts cite it for
“to operate with a business-oriented philosophy.” · 8 citing courts

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
198519911997

One bar per year. Tallest: 1 case in 1985. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Enactment and amendments
(Pub. L. 88–552, § 6, Aug. 31, 1964, 78 Stat. 758.)