Wyoming Statutes
Wyo. Stat. § 21-15-118 (2026)
Building and facility construction and
✓ current as of May 2026
Find cases:
SyfertCases citing this section
WY-LEGwyoleg.gov
JustiaTitle on Justia
CornellLII Search
CasesGoogle Scholar
renovation projects.
(a) Upon determination by the commission following review
under W.S. 21-15-117, and appropriation by the legislature in
accordance with W.S. 21-15-119, the department shall proceed
with projects as follows:
(i) Repealed By Laws 2008, Ch. 93, § 2.
(ii) If a capital outlay remedy:
(A) With the assistance of the involved school
district, develop and approve the necessary schematic design
documents;
(B) Conduct a value engineering analysis of the
project;
(C) Perform an energy efficiency assessment of
the project;
(D) Conduct a safety and security assessment of
the project;
(E) Enforce the requirements under subparagraphs
(a)(ii)(B) through (D) of this section and may waive any of
these requirements if determined not necessary or if provided
within any one (1) of the other requirements specified under
this paragraph.
(b) If required, the department shall provide for
temporary space for any scheduled building remedy by means of
portable buildings creating capacity or by other means available
to the department.
(c) The projects shall be managed and all necessary
contracts related to the projects shall proceed in accordance
with rules adopted pursuant to W.S. 9-2-3004(c)(ii) and
commission rules and regulations promulgated and adopted
pursuant to W.S. 21-15-114(a)(xv).Notes of Decisions
Cited in 1
case, 2008–2008 · leading case: Campbell Cnty. Sch. Dist. v. State, 2008 WY 2 (Wyo. 2008).
Campbell Cnty. Sch. Dist. v. State, 2008 WY 2 (Wyo. 2008). “Section 21-15-118, in relevant part, directs that the SFC "[with the assistance of the involved school district, develop and approve the necessary schematic design documents as well as cooperate on several other aspects of the construction process.”
Annotations are extracted automatically from the opinions in the
Syfert caselaw corpus and ranked by authority, recency, and
treatment. Dots show Syfertize treatment of the citing case itself.