33 U.S.C. § 1314
Information and guidelines
The Administrator, after consultation, with appropriate Federal and State agencies and other interested persons, shall issue to the States and appropriate water pollution control agencies within 270 days after
The Administrator, after consultation with appropriate Federal and State agencies and other interested persons, may publish regulations, supplemental to any effluent limitations specified under subsections (b) and (c) of this section for a class or category of point sources, for any specific pollutant which the Administrator is charged with a duty to regulate as a toxic or hazardous pollutant under section 1317(a)(1) or 1321 of this title, to control plant site runoff, spillage or leaks, sludge or waste disposal, and drainage from raw material storage which the Administrator determines are associated with or ancillary to the industrial manufacturing or treatment process within such class or category of point sources and may contribute significant amounts of such pollutants to navigable waters. Any applicable controls established under this subsection shall be included as a requirement for the purposes of section 1311, 1312, 1316, 1317, or 1343 of this title, as the case may be, in any permit issued to a point source pursuant to section 1342 of this title.
The Administrator shall, within one hundred and eighty days from
The Administrator shall, within 1 year after
Not later than 120 days after the last day of the 2-year period referred to in paragraph (1), the Administrator shall approve or disapprove the control strategies submitted under paragraph (1) by any State.
If a State fails to submit control strategies in accordance with paragraph (1) or the Administrator does not approve the control strategies submitted by such State in accordance with paragraph (1), then, not later than 1 year after the last day of the period referred to in paragraph (2), the Administrator, in cooperation with such State and after notice and opportunity for public comment, shall implement the requirements of paragraph (1) in such State. In the implementation of such requirements, the Administrator shall, at a minimum, consider for listing under this subsection any navigable waters for which any person submits a petition to the Administrator for listing not later than 120 days after such last day.
The Administrator shall provide for public review and comment on the plan prior to final publication.
Pub. L. 95–217, § 50,
2000—Subsec. (a)(9). Pub. L. 106–284 added par. (9).
1987—Subsec. (a)(7), (8). Pub. L. 100–4, § 308(c), added pars. (7) and (8).
Subsec. (j). Pub. L. 100–4, § 315(c), amended subsec. (j) generally. Prior to amendment, subsec. (j) read as follows: “The Administrator shall issue information biennially on methods, procedures, and processes as may be appropriate to restore and enhance the quality of the Nation’s publicly owned freshwater lakes.”
Subsec. (k)(1). Pub. L. 100–4, § 316(e), inserted “and nonpoint source pollution management programs approved under section 1329 of this title” before period at end.
Subsec. (k)(3). Pub. L. 100–4, § 101(f), inserted “and such sums as may be necessary for fiscal years 1984 through 1990” after “1983”.
Subsec. (l). Pub. L. 100–4, § 308(a), added subsec. (l).
Subsec. (m). Pub. L. 100–4, § 308(f), added subsec. (m).
1981—Subsec. (d)(4). Pub. L. 97–117 added par. (4).
1977—Subsec. (a)(4) to (6). Pub. L. 95–217, § 48(a), added pars. (4) to (6).
Subsec. (b)(4). Pub. L. 95–217, § 48(b), added par. (4).
Subsec. (d)(3). Pub. L. 95–217, § 49, added par. (3).
Subsecs. (e) to (i). Pub. L. 95–217, § 50, added subsec. (e) and redesignated former subsecs. (e) to (h) as (f) to (i), respectively. Former subsec. (i) redesignated (j).
Subsec. (j). Pub. L. 95–217, §§ 50, 62(b), redesignated former subsec. (i) as (j) and substituted “shall issue information biennially on methods” for “shall, within 270 days after
Subsec. (k). Pub. L. 95–217, §§ 50, 51, redesignated former subsec. (j) as (k), substituted “The Administrator shall enter into agreements with the Secretary of Agriculture, the Secretary of the Army, and the Secretary of the Interior, and the heads of such other departments, agencies, and instrumentalities of the United States as the Administrator determines, to provide the maximum utilization of other Federal laws and programs” for “The Administrator shall, within six months from
Pub. L. 95–217, § 73,
Enforcement functions of Secretary or other official in Department of Agriculture, insofar as they involve lands and programs under jurisdiction of that Department, relating to compliance with this chapter with respect to pre-construction, construction, and initial operation of transportation system for Canadian and Alaskan natural gas were transferred to the Federal Inspector, Office of Federal Inspector for the Alaska Natural Gas Transportation System, until the first anniversary of the date of initial operation of the Alaska Natural Gas Transportation System, see Reorg. Plan No. 1 of 1979, §§ 102(f), 203(a), 44 F.R. 33663, 33666, 93 Stat. 1373, 1376, effective
For extension of contiguous zone of United States, see Proc. No. 7219, set out as a note under section 1331 of Title 43, Public Lands.