Skip to main content
U.S. CodeTitle 33Chapter 26— Water Pollution Prevention and ControlSubchapter III— Standards and Enforcement

33 U.S.C. § 1316 (2026)

National standards of performance

Edition and currency
U.S. Code current through Pub. L. 119-102 (OLRC release point). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTU.S. Code current through Pub. L. 119-102 (OLRC release point) cited 1975–2025 90citing cases
At a glance

Courts have cited this section in 90 opinions since 1975, 5 of them in the last five years.

(a) DefinitionsFor purposes of this section:(1) The term “standard of performance” means a standard for the control of the discharge of pollutants which reflects the greatest degree of effluent reduction which the Administrator determines to be achievable through application of the best available demonstrated control technology, processes, operating methods, or other alternatives, including, where practicable, a standard permitting no discharge of pollutants.(2) The term “new source” means any source, the construction of which is commenced after the publication of proposed regulations prescribing a standard of performance under this section which will be applicable to such source, if such standard is thereafter promulgated in accordance with this section.(3) The term “source” means any building, structure, facility, or installation from which there is or may be the discharge of pollutants.(4) The term “owner or operator” means any person who owns, leases, operates, controls, or supervises a source.(5) The term “construction” means any placement, assembly, or installation of facilities or equipment (including contractual obligations to purchase such facilities or equipment) at the premises where such equipment will be used, including preparation work at such premises.(b) Categories of sources; Federal standards of performance for new sources(1)(A) The Administrator shall, within ninety days after October 18, 1972, publish (and from time to time thereafter shall revise) a list of categories of sources, which shall, at the minimum, include:

pulp and paper mills;

paperboard, builders paper and board mills;

meat product and rendering processing;

dairy product processing;

grain mills;

canned and preserved fruits and vegetables processing;

canned and preserved seafood processing;

sugar processing;

textile mills;

cement manufacturing;

feedlots;

electroplating;

organic chemicals manufacturing;

inorganic chemicals manufacturing;

plastic and synthetic materials manufacturing;

soap and detergent manufacturing;

fertilizer manufacturing;

petroleum refining;

iron and steel manufacturing;

nonferrous metals manufacturing;

phosphate manufacturing;

steam electric powerplants;

ferroalloy manufacturing;

leather tanning and finishing;

glass and asbestos manufacturing;

rubber processing; and

timber products processing.

(B) As soon as practicable, but in no case more than one year, after a category of sources is included in a list under subparagraph (A) of this paragraph, the Administrator shall propose and publish regulations establishing Federal standards of performance for new sources within such category. The Administrator shall afford interested persons an opportunity for written comment on such proposed regulations. After considering such comments, he shall promulgate, within one hundred and twenty days after publication of such proposed regulations, such standards with such adjustments as he deems appropriate. The Administrator shall, from time to time, as technology and alternatives change, revise such standards following the procedure required by this subsection for promulgation of such standards. Standards of performance, or revisions thereof, shall become effective upon promulgation. In establishing or revising Federal standards of performance for new sources under this section, the Administrator shall take into consideration the cost of achieving such effluent reduction, and any non-water quality, environmental impact and energy requirements.
(2) The Administrator may distinguish among classes, types, and sizes within categories of new sources for the purpose of establishing such standards and shall consider the type of process employed (including whether batch or continuous).(3) The provisions of this section shall apply to any new source owned or operated by the United States.
(c) State enforcement of standards of performance

Each State may develop and submit to the Administrator a procedure under State law for applying and enforcing standards of performance for new sources located in such State. If the Administrator finds that the procedure and the law of any State require the application and enforcement of standards of performance to at least the same extent as required by this section, such State is authorized to apply and enforce such standards of performance (except with respect to new sources owned or operated by the United States).

(d) Protection from more stringent standards

Notwithstanding any other provision of this chapter, any point source the construction of which is commenced after October 18, 1972, and which is so constructed as to meet all applicable standards of performance shall not be subject to any more stringent standard of performance during a ten-year period beginning on the date of completion of such construction or during the period of depreciation or amortization of such facility for the purposes of section 167 or 169 (or both) of title 26 whichever period ends first.

(e) Illegality of operation of new sources in violation of applicable standards of performance

After the effective date of standards of performance promulgated under this section, it shall be unlawful for any owner or operator of any new source to operate such source in violation of any standard of performance applicable to such source.

(June 30, 1948, ch. 758, title III, § 306, as added Pub. L. 92–500, § 2, Oct. 18, 1972, 86 Stat. 854.)Statutory Notes and Related SubsidiariesDischarges From Point Sources in United States Virgin Islands Attributable to Manufacture of Rum; Exemption; Conditions

Discharges from point sources in the United States Virgin Islands in existence on Aug. 5, 1983, attributable to the manufacture of rum not to be subject to the requirements of this section under certain conditions, see section 214(g) of Pub. L. 98–67, set out as a note under section 1311 of this title.

The 20 cases that cite 33 U.S.C. § 1316 most heavily, weighted by court and treatment. RelevanceNewestTreatment
cites § 1316 21×cited by 108 cases
Where it cites § 1316
“SEACC argues that the permit from the Corps is unlaw ful because the discharge of slurry would violate an EPA regulation promulgated under §306(b) of the CWA, 33 U. S. C. §1316 (b). The EPA regulation, which is called a “new source performance standard,” forbids mines like Coeur…”
The case’s holding
Courts defer to an agency's interpretation of its own ambiguous regulations.
Later courts cite it for
“look first to the agency regulations, which are entitled to deference if they resolve the ambiguity in a reasonable manner.” · 8 citing courts
cites § 1316 4×cited by 72 cases
The case’s holding
An agency does not violate notice-and-comment requirements when it updates a data source in response to comments if the change is a logical outgrowth of the proposed rule.
Later courts cite it for
“did not supplant its economic-impact study, or replace its original data with completely new and different data, but, in response to industry criticisms, updated and expanded one of several data sources.” · 2 citing courts
cites § 1316 2×cited by 407 cases
Where it cites § 1316
“[8] Sources subject to new source performance standards (NSPS) under the Act are those who begin construction after the publication of proposed new source standards, 33 U. S. C. § 1316 , and they are ineligible for FDF variances.”
The case’s holding
Courts must defer to an agency's reasonable interpretation of an ambiguous statute under Chevron deference, even if other permissible constructions exist.
Later courts cite it for
“the view of the agency charged with administering the statute is entitled to considerable deference; and to sustain it, we need not find that it is the only permissible construction that the agency might have adopted but only that the agency's understanding of this very 'complex statute' is a sufficiently rational one to preclude a court from substituting its judgment for that of the agency.” · 14 citing courts
4
GREENDep't of Fin. v. Comm'n on State Mandates, 1 Cal. 5th 749 (2016).
cites § 1316 2×cited by 27 cases
Where it cites § 1316
“§§ 1312 , 1317); or (3) established national standards of performance (see 33 U.S.C. § 1316 ). ( 33 U.S.C. § 1311 (a).”
The case’s holding
Requirements are state mandates rather than federal mandates if a state agency exercises discretion to determine the manner of implementing a federal program.
Later courts cite it for
“it is simply not the case that, because a condition was in the permit, it was, ipso facto, required by federal law.” · 2 citing courts
5
GREENAm. Paper Inst. v. Train, 543 F.2d 328 (D.C. Cir. 1976).
cites § 1316 5×cited by 27 cases
Where it cites § 1316
“33 U.S.C. § 1316 . Unlike Sections 301 and 304 which pertain to effluent standards required for existing sources, Section 306 governs the standard for new sources of pollution discharge.”
The case’s holding
Effluent limitation guidelines promulgated under the Federal Water Pollution Control Act are subject to exclusive judicial review in the courts of appeals.
Later courts cite it for
“(b)ecause section 509 makes no mention of judicial review of section 304 guidelines, section 509 will not apply and review is not lodged exclusively in this court unless we determine that the regulations published by epa are effluent limitations guidelines under sections 301 and 304” · 2 citing courts
6
GREENChesapeake Bay Found., Inc. v. Severstal Sparrows Point, LLC, 794 F. Supp. 2d 602 (D. Md. 2011).
cites § 1316 1×cited by 398 cases
Where it cites § 1316
“standard of performance under section 306 of this Act [ 33 U.S.C. § 1316 ]; 4. prohibition, effluent standard or pretreatment standards under section 307 of this Act [ 33 U.”
The case’s holding
A document is integral to a complaint if its very existence, rather than the information it contains, gives rise to the legal rights asserted.
Later courts cite it for
“as examples, 'courts have found integral the allegedly fraudulent document in a fraud action, the allegedly libelous magazine article in a libel action, and the documents that constitute the core of the parties' contractual relationship in a breach of contract dispute.” · 15 citing courts
7
GREENCPC Int'l, Inc. v. Russell E. Train, 540 F.2d 1329 (8th Cir. 1976).
cites § 1316 5×cited by 18 cases
Where it cites § 1316
“33 U.S.C. § 1316 . The new plant standards are before us for the second time.”
8
GREENEntergy Corp. v. Riverkeeper, Inc., 556 U.S. 208 (2009).
cites § 1316 1×cited by 182 cases
The case’s holding
An agency's reasonable interpretation of a statute prevails even if it is not the only possible or most reasonable interpretation.
Later courts cite it for
“governs if it is a reasonable interpretation of the statute - not necessarily the only possible interpretation, nor even the interpretation deemed most reasonable by the courts.” · 37 citing courts
9
GREENSw. Elec. Power Co. v. U.S. E.P.A., 920 F.3d 999 (5th Cir. 2019).
cites § 1316 1×cited by 37 cases
Where it cites § 1316
“" 33 U.S.C. § 1316 (a)(1). Additional standards of varying strictness are laid out for other potential pollution sources, such as "pretreatment standards for existing sources" ("PSES").”
The case’s holding
An agency action is arbitrary and capricious if the agency fails to examine relevant data or articulate a satisfactory explanation for its decision.
10
cites § 1316 1×cited by 110 cases
Where it cites § 1316
“§ 1317 (Count 3); discharge of pollutants, in violation of national standards of performance for offshore drilling operations under CWA, 33 U.S.C. § 1316 (Count 4); gross negligence or willful misconduct pursuant to CWA, 33 U.”
The case’s holding
Mootness applies when intervening circumstances render a court incapable of providing meaningful relief to a plaintiff.
Later courts cite it for
“mootness applies when intervening circumstances render the court no longer capable of providing meaningful relief to the plaintiff.” · 15 citing courts
cites § 1316 1×cited by 372 cases
Where it cites § 1316
“Section 306 of the Senate bill, which corresponds to 33 U. S. C. § 1316 (1970 ed., Supp. IV), required that the EPA Administrator establish “standards of performance” with respect to the discharge of pollutants from specified categories of sources, to be revised from time to…”
The case’s holding
An unambiguous statute must be given effect according to its plain and obvious meaning.
Later courts cite it for
“and statutory interpretation in the” · 3 citing courts
cites § 1316 5×cited by 9 cases
Where it cites § 1316
“33 U.S.C. § 1316 . The rendering industry converts inedible animal raw materials into salable by-products for commercial use.”
13
GREENE. I. Du Pont De Nemours & Co. v. Train, 430 U.S. 112 (1977).
cites § 1316 1×cited by 297 cases
Where it cites § 1316
“854 , 33 U. S. C. § 1316 (1970 ed., Supp. V), are as follows: “(a) For purposes of this section: “(1) The term 'standard of performance' means a standard for the control of the discharge of pollutants which reflects the greatest degree of effluent reduction which the…”
The case’s holding
Courts must defer to agency expertise regarding the technical complexities of environmental regulation and the implementation of statutory pollutant discharge limitations.
Later courts cite it for
“so long as some allowance is made for variations in individual plants, as epa has done by including a variance clause in its 1977 limitations.” · 5 citing courts
14
GREENBethlehem Steel Corp. v. Env't Prot. Agency, 538 F.2d 513 (2d Cir. 1976).
cites § 1316 2×cited by 40 cases
Where it cites § 1316
“§ 1311 (d); when he proposes to revise standards based on new technology under § 306(b)(1)(B), 33 U.S.C. § 1316 (b)(1)(B), and then after public comment decides not to; and when a proposed water quality related effluent limitation under § 302, 33 U.”
The case’s holding
The courts of appeals lack jurisdiction to review agency approval of state water quality standards because such actions are not among the specific reviewable actions enumerated in the statute.
Later courts cite it for
“it was .... dissatisfaction with water quality standards as a method of pollution control that led to the proposal that they be replaced or supplemented with 'effluent limitations.” · 3 citing courts
cites § 1316 1×cited by 210 cases
Where it cites § 1316
“§§ 1311 (b) & 1312, or by an applicable standard of performance under CWA Sections 306 and 307, 33 U.S.C. §§ 1316 & 1317. Dubois Brief at 27; see 33 U.”
The case’s holding
An agency must consider all relevant factors and articulate a rational connection between the facts found and the choice made to satisfy judicial review.
Later courts cite it for
“lacks article iii standing to bring a matter before the court, the court lacks subject matter jurisdiction to decide the merits of the underlying case.” · 8 citing courts
cites § 1316 7×cited by 9 cases
Reversed by the U.S. Supreme Court in this case: Coeur Alaska, Inc. v. Southeast Alaska Conservation Council (2009).
Where it cites § 1316
“7 33 U.S.C. § 1316 (b). To carry out § 306’s directive, EPA must promulgate a list of categories of sources and, for new sources within each category, establish a national standard of performance (also referred to as a New Source Performance Standard).”
Later courts cite it for
“both of the regulations appear to apply in this case, yet they are at odds.” · 1 citing court
cites § 1316 2×cited by 13 cases
Where it cites § 1316
“See 33 U.S.C. § 1316 . The complaint made no mention of any violation of the permit that regulated Fleetwood mine.”
Later courts cite it for
“a court should . . . avoid interpreting a provision in a way that would render other provisions of the statute superfluous.” · 2 citing courts
18
GREENUnited States v. Earth Sciences, Inc., 599 F.2d 368 (10th Cir. 1979).
cites § 1316 1×cited by 148 cases
Where it cites § 1316
“Because the FWPCA encourages use of approved state enforcement procedures, 33 U.S.C. §§ 1316 (c) and 1319(a)(1), the Environmental Protection Agency (EPA) requested the Colorado Department of Health to act to prevent further discharges.”
The case’s holding
The escape of liquid from a confined system due to construction flaws or inadequate size constitutes a discharge from a point source.
Later courts cite it for
“it is clear from the legislative history that congress would have regulated so-called nonpoint sources if a workable method could have been derived.” · 4 citing courts
cites § 1316 1×cited by 37 cases
The case’s holding
Plaintiffs may sue in district court to compel the EPA to promulgate required guidelines without challenging existing regulations, and members' diminished waterway use establishes injury in fact.
Later courts cite it for
“members' statements that their use of specific waterways has been diminished due to their concerns about discharge from a particular source (here, the construction sites) are sufficient to establish injury in fact.” · 2 citing courts
20
GREENAiello v. Town of Brookhaven, 136 F. Supp. 2d 81 (E.D.N.Y. 2001).
cites § 1316 1×cited by 35 cases
Where it cites § 1316
“See 33 U.S.C. § 1316 . As for § 1317, the court held in Dague that it “imposes obligations only on the EPA administrator, not the defendant city.”
The case’s holding
The Clean Water Act does not authorize a citizen suit against a past polluter for the ongoing migration of residual leachate from a former landfill; RCRA addresses such liability.
Later courts cite it for
“it is rcra, rather than the cwa, that appropriately addresses liability for ongoing contamination by past polluters.” · 1 citing court

Show all 90 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
197520002025

One bar per year. Tallest: 14 cases in 1976. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
9th Cir.92d Cir.76th Cir.74th Cir.6D.C. Cir.6SCOTUS67th Cir.511th Cir.4

The 8 courts with the most citing cases, of 33 courts in all.

By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Show all 90 citing cases (list view) →

Enactment and amendments
(June 30, 1948, ch. 758, title III, § 306, as added Pub. L. 92–500, § 2, Oct. 18, 1972, 86 Stat. 854.)
Versions

Edition shown: U.S. Code current through Pub. L. 119-102 (OLRC release point). Syfert holds no earlier or later version of this section.