40 C.F.R. § 258.26

Run-on/run-off control systems

Read at: eCFRecfr.gov CornellLII GovInfogovinfo.gov CasesGoogle Scholar

(a) Owners or operators of all MSWLF units must design, construct, and maintain:

(1) A run-on control system to prevent flow onto the active portion of the landfill during the peak discharge from a 25-year storm;

(2) A run-off control system from the active portion of the landfill to collect and control at least the water volume resulting from a 24-hour, 25-year storm.

(b) Run-off from the active portion of the landfill unit must be handled in accordance with § 258.27(a) of this part.

[56 FR 51016, Oct. 9, 1991; 57 FR 28627, June 26, 1992]
Notes of Decisions
Cited in 1 case, 2005–2005 · leading case: Grassroots Recycling Network, Inc. v. United States Env't Prot. Agency, 429 F.3d 1109 (D.C. Cir. 2005).
Grassroots Recycling Network, Inc. v. United States Env't Prot. Agency, 429 F.3d 1109 (D.C. Cir. 2005). “Under those regulations a municipal solid waste landfill (MSWLF) must maintain a certain level of run-on control, 40 C.F.R. § 258.26 (a)(1), and “install a final cover system that is designed *1111 to minimize infiltration and erosion,” id.”
Annotations are extracted automatically from the opinions in the Syfert caselaw corpus and ranked by authority, recency, and treatment. Dots show Syfertize treatment of the citing case itself.