42 U.S.C. § 9607 (2026)
Liability
Edition and currency
Other sources
Courts have cited this section in 2,567 opinions since 1982, 225 of them in the last five years. The most litigated part is subsection (a) (21 cases).
Except as provided in paragraph (2), no person shall be liable under this subchapter for costs or damages as a result of actions taken or omitted in the course of rendering care, assistance, or advice in accordance with the National Contingency Plan (“NCP”) or at the direction of an onscene coordinator appointed under such plan, with respect to an incident creating a danger to public health or welfare or the environment as a result of any releases of a hazardous substance or the threat thereof. This paragraph shall not preclude liability for costs or damages as the result of negligence on the part of such person.
No State or local government shall be liable under this subchapter for costs or damages as a result of actions taken in response to an emergency created by the release or threatened release of a hazardous substance generated by or from a facility owned by another person. This paragraph shall not preclude liability for costs or damages as a result of gross negligence or intentional misconduct by the State or local government. For the purpose of the preceding sentence, reckless, willful, or wanton misconduct shall constitute gross negligence.
This subsection shall not alter the liability of any person covered by the provisions of paragraph (1), (2), (3), or (4) of subsection (a) of this section with respect to the release or threatened release concerned.
In the case of an injury to, destruction of, or loss of natural resources under subparagraph (C) of subsection (a) liability shall be to the United States Government and to any State for natural resources within the State or belonging to, managed by, controlled by, or appertaining to such State and to any Indian tribe for natural resources belonging to, managed by, controlled by, or appertaining to such tribe, or held in trust for the benefit of such tribe, or belonging to a member of such tribe if such resources are subject to a trust restriction on alienation: Provided, however, That no liability to the United States or State or Indian tribe shall be imposed under subparagraph (C) of subsection (a), where the party sought to be charged has demonstrated that the damages to natural resources complained of were specifically identified as an irreversible and irretrievable commitment of natural resources in an environmental impact statement, or other comparable environment analysis, and the decision to grant a permit or license authorizes such commitment of natural resources, and the facility or project was otherwise operating within the terms of its permit or license, so long as, in the case of damages to an Indian tribe occurring pursuant to a Federal permit or license, the issuance of that permit or license was not inconsistent with the fiduciary duty of the United States with respect to such Indian tribe. The President, or the authorized representative of any State, shall act on behalf of the public as trustee of such natural resources to recover for such damages. Sums recovered by the United States Government as trustee under this subsection shall be retained by the trustee, without further appropriation, for use only to restore, replace, or acquire the equivalent of such natural resources. Sums recovered by a State as trustee under this subsection shall be available for use only to restore, replace, or acquire the equivalent of such natural resources by the State. The measure of damages in any action under subparagraph (C) of subsection (a) shall not be limited by the sums which can be used to restore or replace such resources. There shall be no double recovery under this chapter for natural resource damages, including the costs of damage assessment or restoration, rehabilitation, or acquisition for the same release and natural resource. There shall be no recovery under the authority of subparagraph (C) of subsection (a) where such damages and the release of a hazardous substance from which such damages resulted have occurred wholly before
The President shall designate in the National Contingency Plan published under section 9605 of this title the Federal officials who shall act on behalf of the public as trustees for natural resources under this chapter and section 1321 of title 33. Such officials shall assess damages for injury to, destruction of, or loss of natural resources for purposes of this chapter and such section 1321 of title 33 for those resources under their trusteeship and may, upon request of and reimbursement from a State and at the Federal officials’ discretion, assess damages for those natural resources under the State’s trusteeship.
The Governor of each State shall designate State officials who may act on behalf of the public as trustees for natural resources under this chapter and section 1321 of title 33 and shall notify the President of such designations. Such State officials shall assess damages to natural resources for the purposes of this chapter and such section 1321 of title 33 for those natural resources under their trusteeship.
Any determination or assessment of damages to natural resources for the purposes of this chapter and section 1321 of title 33 made by a Federal or State trustee in accordance with the regulations promulgated under section 9651(c) of this title shall have the force and effect of a rebuttable presumption on behalf of the trustee in any administrative or judicial proceeding under this chapter or section 1321 of title 33.
For provisions relating to Federal agencies, see section 9620 of this title.
The owner or operator of a vessel shall be liable in accordance with this section, under maritime tort law, and as provided under section 9614 of this title notwithstanding any provision of the Act of
No person (including the United States or any State or Indian tribe) may recover under the authority of this section for any response costs or damages resulting from the application of a pesticide product registered under the Federal Insecticide, Fungicide, and Rodenticide Act [7 U.S.C. 136 et seq.]. Nothing in this paragraph shall affect or modify in any way the obligations or liability of any person under any other provision of State or Federal law, including common law, for damages, injury, or loss resulting from a release of any hazardous substance or for removal or remedial action or the costs of removal or remedial action of such hazardous substance.
Recovery by any person (including the United States or any State or Indian tribe) for response costs or damages resulting from a federally permitted release shall be pursuant to existing law in lieu of this section. Nothing in this paragraph shall affect or modify in any way the obligations or liability of any person under any other provision of State or Federal law, including common law, for damages, injury, or loss resulting from a release of any hazardous substance or for removal or remedial action or the costs of removal or remedial action of such hazardous substance. In addition, costs of response incurred by the Federal Government in connection with a discharge specified in section 9601(10)(B) or (C) of this title shall be recoverable in an action brought under section 1319(b) of title 33.
The lien imposed by this subsection shall be subject to the rights of any purchaser, holder of a security interest, or judgment lien creditor whose interest is perfected under applicable State law before notice of the lien has been filed in the appropriate office within the State (or county or other governmental subdivision), as designated by State law, in which the real property subject to the lien is located. Any such purchaser, holder of a security interest, or judgment lien creditor shall be afforded the same protections against the lien imposed by this subsection as are afforded under State law against a judgment lien which arises out of an unsecured obligation and which arises as of the time of the filing of the notice of the lien imposed by this subsection. If the State has not by law designated one office for the receipt of such notices of liens, the notice shall be filed in the office of the clerk of the United States district court for the district in which the real property is located. For purposes of this subsection, the terms “purchaser” and “security interest” shall have the definitions provided under section 6323(h) of title 26.
The costs constituting the lien may be recovered in an action in rem in the United States district court for the district in which the removal or remedial action is occurring or has occurred. Nothing in this subsection shall affect the right of the United States to bring an action against any person to recover all costs and damages for which such person is liable under subsection (a) of this section.
All costs and damages for which the owner or operator of a vessel is liable under subsection (a)(1) with respect to a release or threatened release from such vessel shall constitute a maritime lien in favor of the United States on such vessel. Such costs may be recovered in an action in rem in the district court of the United States for the district in which the vessel may be found. Nothing in this subsection shall affect the right of the United States to bring an action against the owner or operator of such vessel in any court of competent jurisdiction to recover such costs.
The liability of a fiduciary under any provision of this chapter for the release or threatened release of a hazardous substance at, from, or in connection with a vessel or facility held in a fiduciary capacity shall not exceed the assets held in the fiduciary capacity.
Paragraph (1) does not apply to the extent that a person is liable under this chapter independently of the person’s ownership of a vessel or facility as a fiduciary or actions taken in a fiduciary capacity.
Paragraphs (1) and (4) do not limit the liability pertaining to a release or threatened release of a hazardous substance if negligence of a fiduciary causes or contributes to the release or threatened release.
The term “fiduciary capacity” means the capacity of a person in holding title to a vessel or facility, or otherwise having control of or an interest in the vessel or facility, pursuant to the exercise of the responsibilities of the person as a fiduciary.
A determination by the President under paragraph (2)(A) shall not be subject to judicial review.
In the case of a contribution action, with respect to response costs at a facility on the National Priorities List, brought by a party, other than a Federal, State, or local government, under this chapter, the burden of proof shall be on the party bringing the action to demonstrate that the conditions described in paragraph (1)(A) and (B) of this subsection are not met.
A determination by the President under paragraph (2) shall not be subject to judicial review.
Examples of municipal solid waste under subparagraph (A) include food and yard waste, paper, clothing, appliances, consumer product packaging, disposable diapers, office supplies, cosmetics, glass and metal food containers, elementary or secondary school science laboratory waste, and household hazardous waste.
No contribution action may be brought by a party, other than a Federal, State, or local government, under this chapter with respect to circumstances described in paragraph (1)(A).
A nongovernmental entity that commences, after
To qualify as a person described in subparagraph (A), a person must establish by a preponderance of the evidence that the conditions in clauses (i) through (viii) of subparagraph (A) have been met.
Any person that does not qualify as a person described in this paragraph because the person had, or had reason to have, knowledge specified in subparagraph (A)(viii) at the time of acquisition of the real property may qualify as a bona fide prospective purchaser under section 9601(40) of this title if the person is otherwise described in that section.
With respect to a hazardous substance from one or more sources that are not on the property of a person that is a contiguous property owner that enters ground water beneath the property of the person solely as a result of subsurface migration in an aquifer, subparagraph (A)(iii) shall not require the person to conduct ground water investigations or to install ground water remediation systems, except in accordance with the policy of the Environmental Protection Agency concerning owners of property containing contaminated aquifers, dated
Notwithstanding subsection (a)(1), a bona fide prospective purchaser whose potential liability for a release or threatened release is based solely on the bona fide prospective purchaser being considered to be an owner or operator of a facility shall not be liable as long as the bona fide prospective purchaser does not impede the performance of a response action or natural resource restoration.
If there are unrecovered response costs incurred by the United States at a facility for which an owner of the facility is not liable by reason of paragraph (1), and if each of the conditions described in paragraph (3) is met, the United States shall have a lien on the facility, or may by agreement with the owner, obtain from the owner a lien on any other property or other assurance of payment satisfactory to the Administrator, for the unrecovered response costs.
A response action for which there are unrecovered costs of the United States is carried out at the facility.
The response action increases the fair market value of the facility above the fair market value of the facility that existed before the response action was initiated.
This chapter, referred to in text, was in the original “this Act”, meaning Pub. L. 96–510,
Such amendments, referred to in the last sentence of subsec. (a), probably means the amendments made by Pub. L. 99–499,
Act of
The Federal Insecticide, Fungicide, and Rodenticide Act, referred to in subsec. (i), is act June 25, 1947, ch. 125, as amended generally by Pub. L. 92–516,
The Solid Waste Disposal Act, referred to in subsec. (k)(1), (3), (6)(E)(i), is title II of Pub. L. 89–272,
Section 9641 of this title, referred to in subsec. (k), was repealed by Pub. L. 99–499, title V, § 514(b),
Subchapter II of this chapter, referred to in subsec. (k)(4)(A), (C), was in the original “title II of this Act”, meaning title II of Pub. L. 96–510,
The Hazardous and Solid Waste Amendments of 1984, referred to in subsec. (k)(6)(A), (E), is Pub. L. 98–616,
The Small Business Act, referred to in subsec. (p)(1), is Pub. L. 85–536, § 2(1 et seq.),
2018—Subsec. (r)(1). Pub. L. 115–141 substituted “bona fide prospective purchaser being considered” for “purchaser’s being considered”.
2002—Subsecs. (o), (p). Pub. L. 107–118, § 102(a), added subsecs. (o) and (p).
Subsec. (q). Pub. L. 107–118, § 221, added subsec. (q).
Subsec. (r). Pub. L. 107–118, § 222(b), added subsec. (r).
1996—Subsec. (c)(1)(C). Pub. L. 104–287 substituted “section 60101(a) of title 49” for “the Hazardous Liquid Pipeline Safety Act of 1979”.
Subsec. (n). Pub. L. 104–208 added subsec. (n).
1994—Subsec. (c)(1)(C). Pub. L. 103–429 substituted “hazardous liquid pipeline facility” for “pipeline”.
1986—Subsec. (a). Pub. L. 99–514, in penultimate sentence, substituted “Internal Revenue Code of 1986” for “Internal Revenue Code of 1954”, which for purposes of codification was translated as “title 26” thus requiring no change in text.
Pub. L. 99–499, § 107(b), inserted concluding provisions relating to accrual and rate of interest on amounts recoverable under this section.
Subsec. (a)(1). Pub. L. 99–499, § 107(a), struck out “(otherwise subject to the jurisdiction of the United States)” after “vessel”.
Subsec. (a)(3). Pub. L. 99–499, § 127(b)(1), inserted “or incineration vessel” after “facility”.
Subsec. (a)(4). Pub. L. 99–499, §§ 107(b), 127(b)(2), 207(c)(1), in introductory provisions, inserted “, incineration vessels” after “vessels”, in subpar. (A), inserted “or an Indian tribe” after “State”, and added subpar. (D).
Subsec. (c)(1)(A). Pub. L. 99–499, § 127(b)(3), inserted “, other than an incineration vessel,” after “vessel”.
Subsec. (c)(1)(B). Pub. L. 99–499, § 127(b)(4), inserted “other than an incineration vessel,” after “other vessel,”.
Subsec. (c)(1)(D). Pub. L. 99–499, § 127(b)(5), inserted “any incineration vessel or” before “any facility”.
Subsec. (d). Pub. L. 99–499, § 107(c), amended subsec. (d) generally. Prior to amendment, subsec. (d) read as follows: “No person shall be liable under this subchapter for damages as a result of actions taken or omitted in the course of rendering care, assistance, or advice in accordance with the national contingency plan or at the direction of an onscene coordinator appointed under such plan, with respect to an incident creating a danger to public health or welfare or the environment as a result of any release of a hazardous substance or the threat thereof. This subsection shall not preclude liability for damages as the result of gross negligence or intentional misconduct on the part of such person. For the purposes of the preceding sentence, reckless, willful, or wanton misconduct shall constitute gross negligence.”
Subsec. (f)(1). Pub. L. 99–499, § 107(d)(1), designated existing provisions as par. (1) and added heading.
Pub. L. 99–499, § 207(c)(2)(A), inserted “and to any Indian tribe for natural resources belonging to, managed by, controlled by, or appertaining to such tribe, or held in trust for the benefit of such tribe, or belonging to a member of such tribe if such resources are subject to a trust restriction on alienation” after third reference to “State”.
Pub. L. 99–499, § 207(c)(2)(B), inserted “or Indian tribe” after fourth reference to “State”.
Pub. L. 99–499, § 207(c)(2)(C), inserted in first sentence “, so long as, in the case of damages to an Indian tribe occurring pursuant to a Federal permit or license, the issuance of that permit or license was not inconsistent with the fiduciary duty of the United States with respect to such Indian tribe”.
Pub. L. 99–499, § 107(d)(2), substituted “Sums recovered by the United States Government as trustee under this subsection shall be retained by the trustee, without further appropriation, for use only to restore, replace, or acquire the equivalent of such natural resources. Sums recovered by a State as trustee under this subsection shall be available for use only to restore, replace, or acquire the equivalent of such natural resources by the State. The measure of damages in any action under subparagraph (C) of subsection (a) shall not be limited by the sums which can be used to restore or replace such resources. There shall be no double recovery under this chapter for natural resource damages, including the costs of damage assessment or restoration, rehabilitation, or acquisition for the same release and natural resource” for “Sums recovered shall be available for use to restore, rehabilitate, or acquire the equivalent of such natural resources by the appropriate agencies of the Federal Government or the State government, but the measure of such damages shall not be limited by the sums which can be used to restore or replace such resources”.
Pub. L. 99–499, § 207(c)(2)(D), which directed the insertion of “or the Indian tribe” after “State government”, could not be executed because the prior amendment by section 107(d)(2) of Pub. L. 99–499, struck out third sentence referring to “State government”.
Subsec. (f)(2). Pub. L. 99–499, § 107(d)(1), added par. (2).
Subsec. (g). Pub. L. 99–499, § 107(e), amended subsec. (g) generally. Prior to amendment, subsec. (g) read as follows: “Each department, agency, or instrumentality of the executive, legislative, and judicial branches of the Federal Government shall be subject to, and comply with, this chapter in the same manner and to the same extent, both procedurally and substantively, as any nongovernmental entity, including liability under this section.”
Subsec. (h). Pub. L. 99–499, § 127(e), inserted “, under maritime tort law,” after “with this section” and inserted “or the absence of any physical damage to the proprietary interest of the claimant” before the period at end.
Subsec. (i). Pub. L. 99–499, § 207(c)(3), inserted “or Indian tribe” after “State”.
Subsec. (j). Pub. L. 99–499, § 207(c)(4), inserted “or Indian tribe” after first reference to “State”.
Subsec. (k)(5), (6). Pub. L. 99–499, § 201, added pars. (5) and (6).
Subsec. (l). Pub. L. 99–499, § 107(f), added subsec. (l).
Subsec. (l)(3). Pub. L. 99–514 substituted “Internal Revenue Code of 1986” for “Internal Revenue Code of 1954”, which for purposes of codification was translated as “title 26” thus requiring no change in text.
Subsec. (m). Pub. L. 99–499, § 107(f), added subsec. (m).
Amendment by Pub. L. 104–208 applicable with respect to any claim that has not been finally adjudicated as of
Pub. L. 107–118, title I, § 103,
Pub. L. 110–161, div. F, title I,
Similar provisions were contained in the following prior appropriation acts:
Pub. L. 109–54, title I,
Pub. L. 108–447, div. E, title I,
Pub. L. 108–108, title I, § 310,
Pub. L. 108–7, div. F, title I,
Pub. L. 107–63, title I,
Pub. L. 106–291, title I,
Pub. L. 106–113, div. B, § 1000(a)(3) [title I],
Pub. L. 105–277, div. A, § 101(e) [title I],
Pub. L. 105–83, title I,
Pub. L. 104–208, div. A, title I, § 101(d) [title I],
Pub. L. 104–134, title I, § 101(c) [title I],
Pub. L. 103–332, title I,
Pub. L. 104–303, title II, § 209,
Any provision of titles I to IV of Pub. L. 99–499, imposing any tax, premium, or fee; establishing any trust fund; or authorizing expenditures from any trust fund, to have no force or effect, see section 531 of Pub. L. 99–499, set out as a note under section 1 of Title 26, Internal Revenue Code.
- Where it cites § 9607
- “" ( 42 U.S.C. § 9607 (a).) A liable person is responsible for, among other things, "all costs of removal or remedial action incurred by the United States Government or a State or an Indian tribe not inconsistent with the national contingency plan;" "any other necessary costs of…”
- The case’s holding
- A plaintiff in a private cost recovery action must establish that the site on which hazardous substances are contained is a threatened contamination or pollution site.
- Later courts cite it for
- “a person who has incurred response or corrective action costs in accordance with this chapter, chapter 6.5 (commencing with section 25100), or the federal act may seek contribution or indemnity from any person who is liable pursuant to this chapter.” · 3 citing courts
- Where it cites § 9607
- “128, 136 (2007); 42 U.S.C. §§ 9607 (a)(1)–(4). CERCLA liability is also joint and several, “meaning that a responsible party may be held liable for the entire cost of cleanup even where other parties contributed to the contamination.”
- The case’s holding
- An insurer lacks standing to bring a subrogated cost-recovery action under CERCLA section 107(a) because it did not itself incur the response costs.
- Later courts cite it for
- “must accept all material allegations in the complaint as true, and construe them in the light most favorable to the non-moving party.” · 12 citing courts
- Where it cites § 9607
- “and CCCI to contest the amount of those response costs at trial by attempting to meet their burden under 42 U.S.C. § 9607 (a) of establishing that those costs claimed are inconsistent with the National Contingency Plan; (2) The plaintiff’s claim that an imminent and substantial…”
- The case’s holding
- Courts must resolve ambiguities in the endangerment standard in favor of protecting public health, welfare, and the environment.
- Later courts cite it for
- “simply put, the term 'facility' includes every place where hazardous substances come to be located.” · 4 citing courts
- Where it cites § 9607
- “5 Litigation was ultimately trifurcated into three phases to sequentially determine: (1) whether Teck is liable as a potentially responsible party (“PRP”); (2) Teck’s liability for response costs; and (3) Teck’s liability for natural resource damages.”
- The case’s holding
- A defendant seeking a divisibility defense must provide a reasonable factual basis for apportioning liability and demonstrate that the environmental harm is theoretically capable of apportionment.
- Later courts cite it for
- “this is a complex case that has been ongoing for fourteen years, and the entry of partial judgment . . . would help ensure that a responsible party promptly pays for the contamination . . . advancing cercla's goals and easing the tribes' burden of financing the litigation effort.” · 4 citing courts
- Where it cites § 9607
- “42 U.S.C. § 9607 (a) (1982). The State of North Carolina subsequently intervened as a party plaintiff seeking restitution for the expenses it incurred in cleaning up these same spills.”
- The case’s holding
- A corporate officer who arranges for the disposal of hazardous substances is strictly liable for response costs under CERCLA regardless of whether they selected the specific disposal site.
- Later courts cite it for
- “the definition of facility is broad enough to encompass ... virtually any place at which hazardous wastes have been dumped or otherwise disposed of.” · 2 citing courts
- Where it cites § 9607
- “42 U.S.C. § 9607 (a)(4)(A). Pursuant to the action by EPA, the policyholders have paid and will continue to pay environmental response costs relating to the Western Processing hazardous waste facility.”
- The case’s holding
- The term damages in a commercial general liability policy includes costs incurred to comply with equitable relief or consent decrees (response costs).
- Later courts cite it for
- “to determine the ordinary meaning of an undefined term, our courts look to standard english language dictionaries.” · 10 citing courts
- Where it cites § 9607
- “2 million for response costs that it incurred before the settlements in a cost recovery claim under CERCLA § 107(a)(4)(B), 42 U. S. C. § 9607 (a)(4)(B). The $1.2 million included attorney's fees for three types of legal services: (1) the identification of other potentially…”
- The case’s holding
- The patent and trademark acts provide similar and somewhat overlapping remedies for contribution actions under sections 107 and 113.
- Later courts cite it for
- “grants the president broad power to command government agencies and private parties to clean up hazardous waste sites.” · 36 citing courts
- Where it cites § 9607
- “§ 9601 (9) ; (2) a "release" or "threatened release" of any "hazardous substance" from the facility has occurred, 42 U.S.C. § 9607 (a)(4) ; (3) such "release" or "threatened release" has caused the plaintiff to incur response costs that were "necessary" and "consistent with the…”
- The case’s holding
- A plaintiff may seek statutory indemnity for response costs under the Hazardous Substance Account Act without demonstrating joint liability for the contamination.
- Later courts cite it for
- “the trial court's failure to adopt grounds for summary judgment or summary adjudication urged by the respondent does not constitute an error from an appellant's point of view,” · 4 citing courts
- Where it cites § 9607
- “Artesian brought this lawsuit pursuant to section 107(a) of CERCLA, 42 U.S.C. § 9607 (a), seeking a monetary recovery from the County of over $10 million.”
- The case’s holding
- Recovery under CERCLA section 107(a) is limited to monitoring and evaluation expenses rather than economic losses such as lost well capacity or alternative water supply costs.
- Later courts cite it for
- “the cases firmly establish that the incurrence of response costs is an essential element of a prima facie case under section 107(a).” · 3 citing courts
- The case’s holding
- An asset acquirer assumes a predecessor's liabilities if state contract law and extrinsic evidence demonstrate an intent to assume those liabilities through express or implied agreement.
- Later courts cite it for
- “a corporation that acquires assets of another corporation typically does not acquire its liabilities, unless '(1) the successor expressly or impliedly agrees to assume the liabilities of the predecessor; (2) the transaction may be considered a de facto merger; (3) the successor may be considered a 'mere continuation' of the predecessor; or (4) the transaction is fraudulent.” · 2 citing courts
- Where it cites § 9607
- “This is an action brought by General Electric (“GE”) pursuant to the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) of 1980, § 107(a), 42 U.S.C. § 9607 (a) (1988). The District Court 1 ordered Litton to pay GE for certain cleanup costs incurred by…”
- The case’s holding
- Private parties may recover attorney fees and expenses in CERCLA cost-recovery actions, and a plaintiff's motive for cleanup does not bar recovery under the statute.
- Later courts cite it for
- “prompt cleanup of hazardous waste sites and imposition of all cleanup costs on the responsible party” · 9 citing courts
- Where it cites § 9607
- “The Edgerton opinion points to 42 U.S.C. § 9607 (a), paragraphs (A) and (C), to justify its conclusion that response costs are not damages, asserting that response costs "are, by definition, considered to be equitable relief and reflect a congressional intent to differentiate…”
- The case’s holding
- Costs incurred for environmental remediation constitute covered damages, and a potentially responsible party letter triggers an insurer's duty to defend.
- Later courts cite it for
- “we do more damage to the rule of law by obstinately refusing to admit errors, thereby perpetuating injustice, than by overturning an erroneous decision.” · 14 citing courts
- Where it cites § 9607
- “See 42 U.S.C. § 9607 (1). The Reardons sued to have the notice of lien removed, arguing that they were not liable for the cleanup costs, that the lien was overextensive in that it covered parcels not involved in the clean-up, and that the filing of the lien notice without a…”
- The case’s holding
- A federal statute authorizing the filing of a lien on property without a pre-deprivation hearing violates the Due Process Clause of the Fifth Amendment.
- Later courts cite it for
- “merits of any particular removal or remedial action” · 2 citing courts
- The case’s holding
- A state agency may settle a party's federal CERCLA liability without express EPA authorization, and such a settlement qualifies as an administrative settlement for contribution purposes.
- Later courts cite it for
- “when determining cercla liability, there is nothing objectionable in basing findings solely on circumstantial evidence, especially where the passage of time has made direct evidence difficult or impossible to obtain.” · 10 citing courts
- Where it cites § 9607
- “Seeking financial contributions for the clean-up, Chevron filed suit against the United States asking for a declaration that the government is also strictly liable as a PRP—both as an “owner” of portions of the Questa Site and as an “arranger” of hazardous substance disposal,…”
- The case’s holding
- Under CERCLA, the canon against surplusage requires courts to give effect to every statutory phrase so that none is inoperative or superfluous; each phrase must have distinct meaning.
- Later courts cite it for
- “the canon against surplusage indicates that courts generally must give effect to all statutory provisions, so that no part will be inoperative or superfluous- each phrase must have distinct meaning.” · 4 citing courts
- Where it cites § 9607
- “§ 9606 , and for cost recovery under section 107, 42 U.S.C. § 9607 . The Court bifurcated the trial in Hard-age I to consider Mr.”
- The case’s holding
- Costs incurred primarily to support a litigation position are not necessary response costs consistent with the National Contingency Plan under CERCLA.
- Later courts cite it for
- “borne primarily to support the hsc's litigation position are not 'necessary costs of response ... consistent with the ncp.” · 2 citing courts
- Where it cites § 9607
- “at 608−09 (citing 42 U.S.C. § 9607 (a)). Under CERCLA, PRPs are: (1) current owners and operators of the “facility” at which the contamination occurred; (2) persons who were owners or operators of the facility “at the time of disposal of any hazardous substance”; (3) persons who…”
- The case’s holding
- Courts may equitably allocate cleanup and removal costs among liable parties using appropriate factors.
- Later courts cite it for
- “allocate the costs of cleanup and removal among liable parties using such equitable factors as the court determines are appropriate.” · 3 citing courts
- Where it cites § 9607
- “First, plaintiffs submit that defendants were “operators” of the AMW facility at the time the hazardous materials at issue were released and, therefore, are liable for cleanup costs under 42 U.S.C. § 9607 (a). Second, plaintiffs assert that emergency response actions pursuant to…”
- Holding on this section
- Section 9607(d)(2) provides an affirmative defense to Section 9607(a) claims for government emergency responses to hazardous substance releases.
- Later courts cite it for
- “a district court may grant a new trial pursuant to rule 59 even when there is evidence to support the jury's verdict, so long as the court determines that, in its independent judgment, the jury has reached a seriously erroneous result or its verdict is a miscarriage of justice.” · 7 citing courts
- Where it cites § 9607
- “On September 26, 2005, this lawsuit was filed under CERCLA § 107 ( 42 U.S.C. § 9607 ) by one of the Site’s current owners, Ashley II of Charleston, LLC (“Ashley”), against PCS Nitrogen, Inc.”
- Where it cites § 9607
- “§ 9631 ; and the Post-Closure Liability Fund, sections 107(k), lll(j) and 232, 42 U.S.C. §§ 9607 (k), 96110) and 9641. After noting the specific inadequacies of RCRA, Congress stated, “It is the intent of the Committee in [CERCLA] .”
- The case’s holding
- A corporation with a forfeited charter remains subject to suit as it is not completely dead for all legal purposes.
- Later courts cite it for
- “a corporation with a forfeited charter is not completely dead for all purposes, but merely in 'a state of coma,' during which it is still subject to suit, even if the suit is brought more than three years after the charter forfeiture.” · 3 citing courts
Show all 2,567 citing cases (list view) →
The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.
One bar per year. Tallest: 145 cases in 1994. 2026 is a partial year. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.
The 8 courts with the most citing cases, of 185 courts in all.
(a)21 cases
(a)(2)2 cases
(a)(3)3 cases
(a)(4)2 cases
(a)(4)(A)2 cases
(a)(4)(B)2 cases
(b)1 case
(b)(3)3 cases
(e)(1)1 case
(f)(1)1 case
(f)(2)(C)1 case
(l)1 case
Amendment years (notes): 2018, 2002, 1996, 1994, 1986
Edition shown: U.S. Code current through Pub. L. 119-102 (OLRC release point). Syfert holds no earlier or later version of this section.