42 U.S.C. § 9612 (2026)

Claims procedure

Edition and currency
U.S. Code current through Pub. L. 119-102 (OLRC release point). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTU.S. Code current through Pub. L. 119-102 (OLRC release point) cited 1982–2021 77citing cases
At a glance

Courts have cited this section in 77 opinions since 1982, 1 of them in the last five years. The most litigated part is subsection (c) (1 case).

(a) Claims against Fund for response costs

No claim may be asserted against the Fund pursuant to section 9611(a) of this title unless such claim is presented in the first instance to the owner, operator, or guarantor of the vessel or facility from which a hazardous substance has been released, if known to the claimant, and to any other person known to the claimant who may be liable under section 9607 of this title. In any case where the claim has not been satisfied within 60 days of presentation in accordance with this subsection, the claimant may present the claim to the Fund for payment. No claim against the Fund may be approved or certified during the pendency of an action by the claimant in court to recover costs which are the subject of the claim.

(b) Forms and procedures applicable(1) Prescribing forms and procedures

The President shall prescribe appropriate forms and procedures for claims filed hereunder, which shall include a provision requiring the claimant to make a sworn verification of the claim to the best of his knowledge. Any person who knowingly gives or causes to be given any false information as a part of any such claim shall, upon conviction, be fined in accordance with the applicable provisions of title 18 or imprisoned for not more than 3 years (or not more than 5 years in the case of a second or subsequent conviction), or both.

(2) Payment or request for hearing

The President may, if satisfied that the information developed during the processing of the claim warrants it, make and pay an award of the claim, except that no claim may be awarded to the extent that a judicial judgment has been made on the costs that are the subject of the claim. If the President declines to pay all or part of the claim, the claimant may, within 30 days after receiving notice of the President’s decision, request an administrative hearing.

(3) Burden of proof

In any proceeding under this subsection, the claimant shall bear the burden of proving his claim.

(4) Decisions

All administrative decisions made hereunder shall be in writing, with notification to all appropriate parties, and shall be rendered within 90 days of submission of a claim to an administrative law judge, unless all the parties to the claim agree in writing to an extension or unless the President, in his discretion, extends the time limit for a period not to exceed sixty days.

(5) Finality and appeal

All administrative decisions hereunder shall be final, and any party to the proceeding may appeal a decision within 30 days of notification of the award or decision. Any such appeal shall be made to the Federal district court for the district where the release or threat of release took place. In any such appeal, the decision shall be considered binding and conclusive, and shall not be overturned except for arbitrary or capricious abuse of discretion.

(6) Payment

Within 20 days after the expiration of the appeal period for any administrative decision concerning an award, or within 20 days after the final judicial determination of any appeal taken pursuant to this subsection, the President shall pay any such award from the Fund. The President shall determine the method, terms, and time of payment.

(c) Subrogation rights; actions maintainable(1) Payment of any claim by the Fund under this section shall be subject to the United States Government acquiring by subrogation the rights of the claimant to recover those costs of removal or damages for which it has compensated the claimant from the person responsible or liable for such release.(2) Any person, including the Fund, who pays compensation pursuant to this chapter to any claimant for damages or costs resulting from a release of a hazardous substance shall be subrogated to all rights, claims, and causes of action for such damages and costs of removal that the claimant has under this chapter or any other law.(3) Upon request of the President, the Attorney General shall commence an action on behalf of the Fund to recover any compensation paid by the Fund to any claimant pursuant to this subchapter, and, without regard to any limitation of liability, all interest, administrative and adjudicative costs, and attorney’s fees incurred by the Fund by reason of the claim. Such an action may be commenced against any owner, operator, or guarantor, or against any other person who is liable, pursuant to any law, to the compensated claimant or to the Fund, for the damages or costs for which compensation was paid.(d) Statute of limitations(1) Claims for recovery of costs

No claim may be presented under this section for recovery of the costs referred to in section 9607(a) of this title after the date 6 years after the date of completion of all response action.

(2) Claims for recovery of damagesNo claim may be presented under this section for recovery of the damages referred to in section 9607(a) of this title unless the claim is presented within 3 years after the later of the following:(A) The date of the discovery of the loss and its connection with the release in question.(B) The date on which final regulations are promulgated under section 9651(c) of this title.(3) Minors and incompetentsThe time limitations contained herein shall not begin to run—(A) against a minor until the earlier of the date when such minor reaches 18 years of age or the date on which a legal representative is duly appointed for the minor, or(B) against an incompetent person until the earlier of the date on which such person’s incompetency ends or the date on which a legal representative is duly appointed for such incompetent person.
(e) Other statutory or common law claims not waived, etc.

Regardless of any State statutory or common law to the contrary, no person who asserts a claim against the Fund pursuant to this subchapter shall be deemed or held to have waived any other claim not covered or assertable against the Fund under this subchapter arising from the same incident, transaction, or set of circumstances, nor to have split a cause of action. Further, no person asserting a claim against the Fund pursuant to this subchapter shall as a result of any determination of a question of fact or law made in connection with that claim be deemed or held to be collaterally estopped from raising such question in connection with any other claim not covered or assertable against the Fund under this subchapter arising from the same incident, transaction, or set of circumstances.

(f) Double recovery prohibited

Where the President has paid out of the Fund for any response costs or any costs specified under section 9611(c)(1) or (2) of this title, no other claim may be paid out of the Fund for the same costs.

(Pub. L. 96–510, title I, § 112, Dec. 11, 1980, 94 Stat. 2792; Pub. L. 99–499, title I, §§ 109(a)(3), 112, Oct. 17, 1986, 100 Stat. 1633, 1646.)Editorial NotesReferences in Text

This chapter, referred to in subsec. (c)(2), was in the original “this Act”, meaning Pub. L. 96–510, Dec. 11, 1980, 94 Stat. 2767, known as the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, which is classified principally to this chapter. For complete classification of this Act to the Code, see Short Title note set out under section 9601 of this title and Tables.

Amendments

1986—Subsec. (a). Pub. L. 99–499, § 112(a), amended subsec. (a) generally. Prior to amendment, subsec. (a) read as follows: “All claims which may be asserted against the Fund pursuant to section 9611 of this title shall be presented in the first instance to the owner, operator, or guarantor of the vessel or facility from which a hazardous substance has been released, if known to the claimant, and to any other person known to the claimant who may be liable under section 9607 of this title. In any case where the claim has not been satisfied within sixty days of presentation in accordance with this subsection, the claimant may elect to commence an action in court against such owner, operator, guarantor, or other person or to present the claim to the Fund for payment.”

Subsec. (b)(1). Pub. L. 99–499, § 112(b), added heading.

Pub. L. 99–499, § 109(a)(3), substituted “in accordance with the applicable provisions of title 18 or imprisoned for not more than 3 years (or not more than 5 years in the case of a second or subsequent conviction), or both” for “up to $5,000 or imprisoned for not more than one year, or both”.

Subsec. (b)(2) to (6). Pub. L. 99–499, § 112(b), added pars. (2) to (6) and struck out former pars. (2) to (4) which related to the settlement and arbitration of claims against liable persons and against the Fund.

Subsec. (d). Pub. L. 99–499, § 112(c), amended subsec. (d) generally. Prior to amendment, subsec. (d) read as follows: “No claim may be presented, nor may an action be commenced for damages under this subchapter, unless that claim is presented or action commenced within three years from the date of the discovery of the loss or December 11, 1980, whichever is later: Provided, however, That the time limitations contained herein shall not begin to run against a minor until he reaches eighteen years of age or a legal representative is duly appointed for him, nor against an incompetent person until his incompetency ends or a legal representative is duly appointed for him.”

Subsec. (f). Pub. L. 99–499, § 112(d), added subsec. (f).

Statutory Notes and Related SubsidiariesCoordination of Titles I to IV of Pub. L. 99–499

Any provision of titles I to IV of Pub. L. 99–499, imposing any tax, premium, or fee; establishing any trust fund; or authorizing expenditures from any trust fund, to have no force or effect, see section 531 of Pub. L. 99–499, set out as a note under section 1 of Title 26, Internal Revenue Code.

The 20 cases that cite 42 U.S.C. § 9612 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENChubb Custom Ins. Co. v. Space Sys./ Loral, Inc., 710 F.3d 946 (9th Cir. 2013).
cites § 9612 12×cited by 148 cases
Where it cites § 9612
“” 42 U.S.C. § 9612 (c)(2). Chubb challenges both rulings, arguing that it may bring a section 107(a) claim in subrogation and that the insured need not be a claimant, as defined by CERCLA, for the insurer to bring a subrogated CHUBB CUSTOM INS.”
The case’s holding
An insurer lacks standing to bring a subrogated cost-recovery action under CERCLA section 107(a) because it did not itself incur the response costs.
Later courts cite it for
“must accept all material allegations in the complaint as true, and construe them in the light most favorable to the non-moving party.” · 12 citing courts
2
GREENDedham Water Co. v. Cumberland Farms Dairy, Inc., 805 F.2d 1074 (1st Cir. 1986).
cites § 9612 10×cited by 174 cases
Where it cites § 9612
“§ 9607 , must comply with the 60-day waiting period prescribed in CERCLA section 112(a), 42 U.S.C. § 9612 (a). 1 Also contested as part of this appeal is whether the amended version of section 7002 of the Resource Conservation and Recovery Act (“RCRA”), 42 U.”
The case’s holding
Amendments to the Resource Conservation and Recovery Act that expand judicial jurisdiction to fill statutory gaps apply retroactively to pending cases.
Later courts cite it for
“cercla is essentially a remedial statute designed by congress to protect and preserve public health and the environment. courts are therefore obligated to construe its provisions liberally to avoid frustration of the beneficial legislative purposes.” · 6 citing courts
3
GREENTRW Inc. v. Andrews, 534 U.S. 19 (2001).
cites § 9612 2×cited by 1,343 cases
Where it cites § 9612
“V); [4] 42 U. S. C. § 9612 (d)(2) (1994 ed.). [5] To apply a new background rule to previously enacted legislation would reverse prior congressional judgments; and to display uncertainty regarding the current background rule makes all unspecifying new legislation a roll of the…”
The case’s holding
A statute of limitations that explicitly enumerates certain exceptions to a general prohibition does not include implied additional exceptions unless there is evidence of contrary legislative intent.
Later courts cite it for
“to promote efficiency in the nation's banking system and to protect consumer privacy.” · 12 citing courts
4
GREENState of NY v. Gen. Elec. Co., 592 F. Supp. 291 (N.D.N.Y. 1984).
cites § 9612 6×cited by 101 cases
Where it cites § 9612
“On November 30, 1983, pursuant to section 112(a) of CERCLA, 42 U.S.C. § 9612 (a), the state presented its claim to defendant for damages to the natural resources and “for the costs of removal, remediation and response with respect to the identification, definition, monitoring,…”
The case’s holding
A waste generator cannot avoid liability under CERCLA by characterizing its disposal arrangements as sales or by alleging the contamination was caused by a third party.
Later courts cite it for
“persons cannot escape liability by 'contracting away' their responsibility or by alleging that an incident was caused by the act or omission of a third party,” · 7 citing courts
5
GREENArtesian Water Co. v. Gov't of New Castle Cnty., 659 F. Supp. 1269 (D. Del. 1987).
cites § 9612 5×cited by 127 cases
Where it cites § 9612
“CERCLA § 112(a), 42 U.S.C. § 9612 (a). Based on the second sentence of section 112(a), the County argues that Artesian has made a binding election to pursue its remedy through the Superfund and that its section 107 claim must be dismissed.”
The case’s holding
Recovery under CERCLA section 107(a) is limited to monitoring and evaluation expenses rather than economic losses such as lost well capacity or alternative water supply costs.
Later courts cite it for
“the cases firmly establish that the incurrence of response costs is an essential element of a prima facie case under section 107(a).” · 3 citing courts
6
GREENMarek v. Chesny, 473 U.S. 1 (1985).
cites § 9612 2×cited by 914 cases
Where it cites § 9612
“2792 , 42 U. S. C. § 9612 (c)(3). 45. Outer Continental Shelf Lands Act Amendments of 1978, 92 Stat.”
The case’s holding
The term costs in Federal Rule of Civil Procedure 68 includes attorney fees when the relevant substantive statute defines such fees as costs.
Later courts cite it for
“the term 'costs' in rule 68 was intended to refer to all costs properly awardable under the relevant substantive statute or other authority.” · 59 citing courts
7
GREENUnited States v. Mottolo, 605 F. Supp. 898 (D.N.H. 1985).
cites § 9612 4×cited by 99 cases
Where it cites § 9612
“§ 9612 (d): No claim may be presented, nor may an action be commenced for damages under this title, unless that claim is presented or action commenced within three years from the date of discovery of the loss or the date of enactment of this Act [December 11, 1980], whichever is…”
Holding on this section
The three-year statute of limitations in CERCLA section 9612(d) does not apply to judicial actions for the reimbursement of removal, remedial, or response costs.
Later courts cite it for
“cercla has acquired a well-deserved notoriety for vaguely drafted provisions and an indefinite, if not contradictory, legislative history.” · 7 citing courts
8
GREENCity of Philadelphia v. Stepan Chem. Co., 544 F. Supp. 1135 (E.D. Pa. 1982).
cites § 9612 3×cited by 116 cases
Where it cites § 9612
“Because the government has subrogation rights for payments made from the fund, see 42 U.S.C. § 9612 (c)(1), the City’s interpretation would assertedly result in a merry go round of litigation with the government suing a responsible person which in turn could sue other…”
The case’s holding
A party incurs the right to recover response costs under CERCLA even if that party is itself potentially subject to liability under the statute.
Later courts cite it for
“facilitatfing the prompt cleanup of hazardous dumpsites by providing a means of financing both governmental and private responses, and by placing the ultimate financial burden upon those responsible for the danger.” · 3 citing courts
9
GREENKelley v. Thomas Solvent Co., 714 F. Supp. 1439 (W.D. Mich. 1989).
cites § 9612 4×cited by 45 cases
Where it cites § 9612
“42 U.S.C. § 9612 (a). 4 The Sixth Circuit viewed CERCLA’s statutory purpose and structure and held that section 112’s 60-day notice requirement does not apply to cost recovery actions under section 107(a).”
The case’s holding
CERCLA cost recovery actions are subject only to the specific defenses enumerated in Section 107(b) and involve no notice requirements.
Later courts cite it for
“because it can be read to allege divisibility.” · 1 citing court
10
GREENUnited States v. Shell Oil Co., 605 F. Supp. 1064 (D. Colo. 1985).
cites § 9612 3×cited by 84 cases
Where it cites § 9612
“§ 9611 , governs uses of the Fund and § 112, 42 U.S.C. § 9612 , sets forth the procedure for making claims against the Fund.”
The case’s holding
CERCLA authorizes the recovery of government response costs incurred prior to the statute's enactment because the statute is inherently retroactive.
Later courts cite it for
“merely a standard 'effective date' provision that indicates the date when an action can first be brought and when the time begins to run for issuing regulations and doing other future acts mandated by the statute.” · 3 citing courts
11
REDUnited States v. Conservation Chem. Co., 619 F. Supp. 162 (W.D. Mo. 1985).
cites § 9612 2×cited by 212 cases
Reversed in part by United States v. Northeastern Pharmaceutical & Chemical Co., Inc., a Dissolved Delaware Corporation, Edwin Michaels and John W. Lee, Ronald Mills and Syntex Agribusiness, Inc. United States of America v. North…
Where it cites § 9612
“The first sentence of section 112(a) expressly provides that “[a]ll claims which may be asserted against the Fund [the Superfund] pursuant to section 9611 of this title shall be presently in the first instance to the owner____” 42 U.S.C. § 9612 (a). It is clear, therefore, that…”
The case’s holding
Courts must resolve ambiguities in the endangerment standard in favor of protecting public health, welfare, and the environment.
Later courts cite it for
“simply put, the term 'facility' includes every place where hazardous substances come to be located.” · 4 citing courts
12
GREENBulk Distrib. Centers, Inc. v. Monsanto Co., 589 F. Supp. 1437 (S.D. Fla. 1984).
cites § 9612 3×subsections: (c)cited by 54 cases
Where it cites § 9612
“42 U.S.C.A. § 9612 (a) (1983). If reimbursement is not forthcoming, the claimant may then either obtain payment from the Fund or sue the responsible persons under section 9607(a)(4)(B).”
The case’s holding
A private party may not maintain a cost-recovery action under CERCLA until it obtains government approval of a remedial plan and incurs response costs consistent with the national contingency plan.
Later courts cite it for
“by establishing a means of controlling and financing both governmental and private responses to hazardous releases at abandoned and inactive waste disposal sites.” · 1 citing court
13
REDUnited States v. Reilly Tar & Chem. Corp., 546 F. Supp. 1100 (D. Minn. 1982).
cites § 9612 2×cited by 118 cases
Reversed in part by United States v. Northeastern Pharmaceutical & Chemical Co., Inc., a Dissolved Delaware Corporation, Edwin Michaels and John W. Lee, Ronald Mills and Syntex Agribusiness, Inc. United States of America v. North…
Where it cites § 9612
“42 U.S.C. § 9612 . Section 112(a) requires a party seeking recovery from either the Fund or a private party to first present the claim to the responsible party.”
The case’s holding
Prior owners of inactive sites are liable under CERCLA and RCRA if their past disposal practices create a present endangerment or imminent threat of harm.
Later courts cite it for
“that those responsible for problems caused by the disposal of chemical poisons bear the cost and responsibility for remedying the harmful conditions they created.” · 9 citing courts
14
GREENState of Colo. v. Asarco, Inc., 616 F. Supp. 822 (D. Colo. 1985).
cites § 9612 6×cited by 9 cases
Where it cites § 9612
“ASARCO first argues that the plaintiff’s claims are barred by its failure to present a claim letter to ASARCO sixty days before commencing this action as required by CERCLA § 112(a), 42 U.S.C. § 9612 (a). That section provides: “All claims which may be asserted against the Fund…”
cites § 9612 2×cited by 48 cases
Where it cites § 9612
“1986) reversed Dedham Water II and definitively held in this Circuit that pre-suit notice as provided in 42 U.S.C. § 9612 is not required in a CERCLA action of the sort before this Court since it does not involve a “claim which may be asserted against the Fund,” and that the…”
The case’s holding
A centralized cash management system where accounting records reflect inter-entity indebtedness does not constitute intermingling funds sufficient to pierce the corporate veil.
Later courts cite it for
“a centralized cash management system ... where the accounting records always reflect the indebtedness of one entity to another, is not the equivalent of intermingling funds” · 4 citing courts
cites § 9612 1×cited by 257 cases
Where it cites § 9612
“They rely on 42 U.S.C. § 9612 (a) as it existed at the time the complaint was filed, which states in relevant part that “[a]ll claims which may be asserted against the Fund pursuant to § 9611 of this Title shall be presented in the first instance to the owner, [or] operator .”
The case’s holding
Individuals are liable as operators under CERCLA if they possess authority to control a facility, and successor corporations are liable under the continuity of enterprise theory.
Later courts cite it for
“must draw all justifiable inferences in favor of the nonmoving party.” · 114 citing courts
17
GREENVersatile Metals, Inc. v. Union Corp., 693 F. Supp. 1563 (E.D. Pa. 1988).
cites § 9612 2×cited by 37 cases
Where it cites § 9612
“NOTICE Versatile Metals contends that Union failed to provide the requisite sixty-days notice pursuant to 42 U.S.C. § 9612 (a), which is “necessary to maintain a private cost recovery action”.”
The case’s holding
Subsequent regulations that clarify prior regulations regarding private party obligations govern the determination of consistency with the National Contingency Plan for CERCLA cost recovery.
Later courts cite it for
“t0 the extent that the subsequent regulations clarify the prior regulations as to private party obligations, such regulations will govern.” · 2 citing courts
18
GREENNCR Corp. v. George A. Whiting Paper Co., 768 F.3d 682 (7th Cir. 2014).
cites § 9612 1×cited by 62 cases
Where it cites § 9612
“Appvion was subrogated to NCR’s contribution claim through CERCLA § 112(c), 42 U.S.C. § 9612 (c)(2) (providing for. subrogation), and could recover its costs exclusively through NCR and this subrogation arrangement.”
The case’s holding
A district court must explain why it disregards apparently relevant information when allocating CERCLA contribution costs based on the record as a whole.
Later courts cite it for
“the district court must decide what is relevant based on the record as a whole; an allocation based on otherwise permissible factors will not be rescued if it does not explain why the court has chosen to disregard other apparently relevant information.” · 3 citing courts
19
GREENState of Idaho v. Howmet Turbine Component Corp., 627 F. Supp. 1274 (D. Idaho 1986).
cites § 9612 4×cited by 10 cases
Where it cites § 9612
“Does the three-year statute of limitations in § 112(d) of CERCLA, 42 U.S.C. § 9612 (d), bar this action? 2.”
cites § 9612 1×cited by 168 cases
Where it cites § 9612
“Prior to amending the CERCLA in 1986, the Congress had specified a date certain (December 1980) for the opening of the limitation period, 42 U.S.C. § 9612 (d) (1982), but because Interior took longer than anticipated to promulgate the regulations, in 1986 the Congress…”
The case’s holding
An agency does not violate the Administrative Procedure Act by withdrawing a draft regulation that has not yet been published as a binding rule.
Later courts cite it for
“the question of reviewability hinges upon whether the preamble has independent legal effect, which in turn is a function of the agency's intention to bind either itself or regulated parties.” · 7 citing courts

Show all 77 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
198220012021

One bar per year. Tallest: 9 cases in 1986. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
9th Cir.411th Cir.3D.C. Cir.3S.D. Fla.3N.D. Ill.3D. Mass.3E.D. Pa.31st Cir.2

The 8 courts with the most citing cases, of 49 courts in all.

By subsection
(c)1 case
Bulk Distrib. Centers, Inc. v. Monsanto Co., 589 F. Supp. 1437 (S.D. Fla. 1984).“42 U.S.C.A. § 9612 (a) (1983). If reimbursement is not forthcoming, the claimant may then either obtain payment from the Fund or sue the responsible persons under section 9607(a)(4)(B).”

Show all 77 citing cases (list view) →

Enactment and amendments
(Pub. L. 96–510, title I, § 112, Dec. 11, 1980, 94 Stat. 2792; Pub. L. 99–499, title I, §§ 109(a)(3), 112, Oct. 17, 1986, 100 Stat. 1633, 1646.)
Amendment years (notes): 1986