42 U.S.C. § 9620 (2026)
Federal facilities
Edition and currency
Other sources
Courts have cited this section in 121 opinions since 1987, 14 of them in the last five years.
Each department, agency, and instrumentality of the United States (including the executive, legislative, and judicial branches of government) shall be subject to, and comply with, this chapter in the same manner and to the same extent, both procedurally and substantively, as any nongovernmental entity, including liability under section 9607 of this title. Nothing in this section shall be construed to affect the liability of any person or entity under sections 9606 and 9607 of this title.
All guidelines, rules, regulations, and criteria which are applicable to preliminary assessments carried out under this chapter for facilities at which hazardous substances are located, applicable to evaluations of such facilities under the National Contingency Plan, applicable to inclusion on the National Priorities List, or applicable to remedial actions at such facilities shall also be applicable to facilities which are owned or operated by a department, agency, or instrumentality of the United States in the same manner and to the extent as such guidelines, rules, regulations, and criteria are applicable to other facilities. No department, agency, or instrumentality of the United States may adopt or utilize any such guidelines, rules, regulations, or criteria which are inconsistent with the guidelines, rules, regulations, and criteria established by the Administrator under this chapter.
This subsection shall not apply to the extent otherwise provided in this section with respect to applicable time periods. This subsection shall also not apply to any requirements relating to bonding, insurance, or financial responsibility. Nothing in this chapter shall be construed to require a State to comply with section 9604(c)(3) of this title in the case of a facility which is owned or operated by any department, agency, or instrumentality of the United States.
State laws concerning removal and remedial action, including State laws regarding enforcement, shall apply to removal and remedial action at facilities owned or operated by a department, agency, or instrumentality of the United States or facilities that are the subject of a deferral under subsection (h)(3)(C) when such facilities are not included on the National Priorities List. The preceding sentence shall not apply to the extent a State law would apply any standard or requirement to such facilities which is more stringent than the standards and requirements applicable to facilities which are not owned or operated by any such department, agency, or instrumentality.
Each department, agency, and instrumentality of the United States shall add to the inventory of Federal agency hazardous waste facilities required to be submitted under section 3016 of the Solid Waste Disposal Act [42 U.S.C. 6937] (in addition to the information required under section 3016(a)(3) of such Act [42 U.S.C. 6937(a)(3)]) information on contamination from each facility owned or operated by the department, agency, or instrumentality if such contamination affects contiguous or adjacent property owned by the department, agency, or instrumentality or by any other person, including a description of the monitoring data obtained.
Subject to subparagraph (B), the criteria referred to in paragraph (1) shall be applied in the same manner as the criteria are applied to facilities that are owned or operated by persons other than the United States.
It shall be an appropriate factor to be taken into consideration for the purposes of section 9605(a)(8)(A) of this title that the head of the department, agency, or instrumentality that owns or operates a facility has arranged with the Administrator or appropriate State authorities to respond appropriately, under authority of a law other than this chapter, to a release or threatened release of a hazardous substance.
Evaluation and listing under this subsection shall be completed in accordance with a reasonable schedule established by the Administrator.
Not later than 6 months after the inclusion of any facility on the National Priorities List, the department, agency, or instrumentality which owns or operates such facility shall, in consultation with the Administrator and appropriate State authorities, commence a remedial investigation and feasibility study for such facility. In the case of any facility which is listed on such list before
The Administrator shall review the results of each investigation and study conducted as provided in paragraph (1). Within 180 days thereafter, the head of the department, agency, or instrumentality concerned shall enter into an interagency agreement with the Administrator for the expeditious completion by such department, agency, or instrumentality of all necessary remedial action at such facility. Substantial continuous physical onsite remedial action shall be commenced at each facility not later than 15 months after completion of the investigation and study. All such interagency agreements, including review of alternative remedial action plans and selection of remedial action, shall comply with the public participation requirements of section 9617 of this title.
Remedial actions at facilities subject to interagency agreements under this section shall be completed as expeditiously as practicable. Each agency shall include in its annual budget submissions to the Congress a review of alternative agency funding which could be used to provide for the costs of remedial action. The budget submission shall also include a statement of the hazard posed by the facility to human health, welfare, and the environment and identify the specific consequences of failure to begin and complete remedial action.
If the Administrator, in consultation with the head of the relevant department, agency, or instrumentality of the United States, determines that remedial investigations and feasibility studies or remedial action will be done properly at the Federal facility by another potentially responsible party within the deadlines provided in paragraphs (1), (2), and (3) of this subsection, the Administrator may enter into an agreement with such party under section 9622 of this title (relating to settlements). Following approval by the Attorney General of any such agreement relating to a remedial action, the agreement shall be entered in the appropriate United States district court as a consent decree under section 9606 of this title.
The Administrator and each department, agency, or instrumentality responsible for compliance with this section shall afford to relevant State and local officials the opportunity to participate in the planning and selection of the remedial action, including but not limited to the review of all applicable data as it becomes available and the development of studies, reports, and action plans. In the case of State officials, the opportunity to participate shall be provided in accordance with section 9621 of this title.
Except for authorities which are delegated by the Administrator to an officer or employee of the Environmental Protection Agency, no authority vested in the Administrator under this section may be transferred, by executive order of the President or otherwise, to any other officer or employee of the United States or to any other person.
After the last day of the 6-month period beginning on the effective date of regulations under paragraph (2) of this subsection, whenever any department, agency, or instrumentality of the United States enters into any contract for the sale or other transfer of real property which is owned by the United States and on which any hazardous substance was stored for one year or more, known to have been released, or disposed of, the head of such department, agency, or instrumentality shall include in such contract notice of the type and quantity of such hazardous substance and notice of the time at which such storage, release, or disposal took place, to the extent such information is available on the basis of a complete search of agency files.
Notice under this subsection shall be provided in such form and manner as may be provided in regulations promulgated by the Administrator. As promptly as practicable after
For purposes of subparagraphs (A)(ii)(I) and (C)(iii), all remedial action described in such subparagraph has been taken if the construction and installation of an approved remedial design has been completed, and the remedy has been demonstrated to the Administrator to be operating properly and successfully. The carrying out of long-term pumping and treating, or operation and maintenance, after the remedy has been demonstrated to the Administrator to be operating properly and successfully does not preclude the transfer of the property. The requirements of subparagraph (A)(ii) shall not apply in any case in which the person or entity to whom the real property is transferred is a potentially responsible party with respect to such property. The requirements of subparagraph (A)(ii) shall not apply in any case in which the transfer of the property occurs or has occurred by means of a lease, without regard to whether the lessee has agreed to purchase the property or whether the duration of the lease is longer than 55 years. In the case of a lease entered into after
When all response action necessary to protect human health and the environment with respect to any substance remaining on the property on the date of transfer has been taken, the United States shall execute and deliver to the transferee an appropriate document containing a warranty that all such response action has been taken, and the making of the warranty shall be considered to satisfy the requirement of subparagraph (A)(ii)(I).
A deferral under this subparagraph shall not increase, diminish, or affect in any manner any rights or obligations of a Federal agency (including any rights or obligations under this section and sections 9606 and 9607 of this title existing prior to transfer) with respect to a property transferred under this subparagraph.
In the case of real property owned by the United States, on which any hazardous substance or any petroleum product or its derivatives (including aviation fuel and motor oil) was stored for one year or more, known to have been released, or disposed of, and on which the United States plans to terminate Federal Government operations, the head of the department, agency, or instrumentality of the United States with jurisdiction over the property shall notify the State in which the property is located of any lease entered into by the United States that will encumber the property beyond the date of termination of operations on the property. Such notification shall be made before entering into the lease and shall include the length of the lease, the name of person to whom the property is leased, and a description of the uses that will be allowed under the lease of the property and buildings and other structures on the property.
Nothing in this section shall affect or impair the obligation of any department, agency, or instrumentality of the United States to comply with any requirement of the Solid Waste Disposal Act [42 U.S.C. 6901 et seq.] (including corrective action requirements).
The President may issue such orders regarding response actions at any specified site or facility of the Department of Energy or the Department of Defense as may be necessary to protect the national security interests of the United States at that site or facility. Such orders may include, where necessary to protect such interests, an exemption from any requirement contained in this subchapter or under title III of the Superfund Amendments and Reauthorization Act of 1986 [42 U.S.C. 11001 et seq.] with respect to the site or facility concerned. The President shall notify the Congress within 30 days of the issuance of an order under this paragraph providing for any such exemption. Such notification shall include a statement of the reasons for the granting of the exemption. An exemption under this paragraph shall be for a specified period which may not exceed one year. Additional exemptions may be granted, each upon the President’s issuance of a new order under this paragraph for the site or facility concerned. Each such additional exemption shall be for a specified period which may not exceed one year. It is the intention of the Congress that whenever an exemption is issued under this paragraph the response action shall proceed as expeditiously as practicable. The Congress shall be notified periodically of the progress of any response action with respect to which an exemption has been issued under this paragraph. No exemption shall be granted under this paragraph due to lack of appropriation unless the President shall have specifically requested such appropriation as a part of the budgetary process and the Congress shall have failed to make available such requested appropriation.
Notwithstanding any other provision of law, all requirements of the Atomic Energy Act [42 U.S.C. 2011 et seq.] and all Executive orders concerning the handling of restricted data and national security information, including “need to know” requirements, shall be applicable to any grant of access to classified information under the provisions of this chapter or under title III of the Superfund Amendments and Reauthorization Act of 1986 [42 U.S.C. 11001 et seq.].
This chapter, referred to in subsecs. (a)(1) to (3), (c)(1), (d)(2)(B), and (j)(2), was in the original “this Act”, meaning Pub. L. 96–510,
Section 2904(b) of such base closure law, referred to in subsec. (h)(4)(C)(iii), means section 2904(b) of Pub. L. 101–510, which is set out as a note under section 2687 of Title 10, Armed Forces.
The Solid Waste Disposal Act, referred to in subsec. (i), is title II of Pub. L. 89–272,
Title III of the Superfund Amendments and Reauthorization Act of 1986, referred to in subsec. (j), is title III of Pub. L. 99–499,
The Atomic Energy Act, referred to in subsec. (j)(2), probably means the Atomic Energy Act of 1954, act Aug. 1, 1946, ch. 724, as added by act Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 919, which is classified principally to chapter 23 (§ 2011 et seq.) of this title. For complete classification of this Act to the Code, see Short Title note set out under section 2011 of this title and Tables.
1996—Subsec. (a)(4). Pub. L. 104–201, § 334(b), inserted “or facilities that are the subject of a deferral under subsection (h)(3)(C)” after “United States”.
Subsec. (d). Pub. L. 104–201, § 330(2)–(4), designated existing provisions as par. (1), inserted par. heading, substituted “The Administrator” for “Not later than 18 months after
Pub. L. 104–201, § 330(1), redesignated pars. (1) and (2) as subpars. (A) and (B), respectively.
Subsec. (h)(3). Pub. L. 104–201, § 334(a)(8), added subpar. (C).
Pub. L. 104–201, § 334(a)(6), (7), designated existing provisions as subpar. (B), inserted heading, substituted “For purposes of subparagraphs (A)(ii)(I) and (C)(iii)” for “For purposes of subparagraph (B)(i)”, and substituted “subparagraph (A)(ii)” for “subparagraph (B)” in three places.
Pub. L. 104–201, § 334(a)(1)–(5), designated first sentence as subpar. (A), inserted heading, redesignated former subpar. (A) and cls. (i) to (iii) of that subpar. as cl. (i) of subpar. (A) and subcls. (I) to (III) of that cl., respectively, redesignated former subpar. (B) and cls. (i) and (ii) of that subpar. as cl. (ii) of subpar. (A) and subcls. (I) and (II) of that cl., respectively, redesignated former subpar. (C) as cl. (iii) of subpar. (A), and realigned margins of such cls. and subcls.
Pub. L. 104–106, § 2834(2), which directed that par. (3) be amended in the matter following subpar. (C) by adding at the end, flush to the paragraph margin, the following, was executed by inserting the following provision at the end of the concluding provisions “The requirements of subparagraph (B) shall not apply in any case in which the person or entity to whom the real property is transferred is a potentially responsible party with respect to such property. The requirements of subparagraph (B) shall not apply in any case in which the transfer of the property occurs or has occurred by means of a lease, without regard to whether the lessee has agreed to purchase the property or whether the duration of the lease is longer than 55 years. In the case of a lease entered into after
Pub. L. 104–106, § 2834(1), struck out first sentence of concluding provisions which read as follows: “The requirements of subparagraph (B) shall not apply in any case in which the person or entity to whom the property is transferred is a potentially responsible party with respect to such real property.”
Subsec. (h)(4)(A). Pub. L. 104–201, § 331, substituted “known to have been released” for “stored for one year or more, known to have been released,”.
1992—Subsec. (h)(3). Pub. L. 102–426, § 4(a), inserted at end “For purposes of subparagraph (B)(i), all remedial action described in such subparagraph has been taken if the construction and installation of an approved remedial design has been completed, and the remedy has been demonstrated to the Administrator to be operating properly and successfully. The carrying out of long-term pumping and treating, or operation and maintenance, after the remedy has been demonstrated to the Administrator to be operating properly and successfully does not preclude the transfer of the property.”
Subsec. (h)(3)(C). Pub. L. 102–426, § 4(b), added subpar. (C).
Subsec. (h)(4). Pub. L. 102–426, § 3, added par. (4).
Subsec. (h)(5). Pub. L. 102–426, § 5, added par. (5).
For termination, effective
Pub. L. 114–120, title V, § 534(a),
Pub. L. 103–160, div. B, title XXIX, § 2910,
Pub. L. 102–426, § 2,
Pub. L. 99–499, title I, § 120(b),
- Where it cites § 9620
- “, 42 U.S.C. § 9620 (e)(6)', for the environmental contamination located on that land.”
- The case’s holding
- Under CERCLA, the canon against surplusage requires courts to give effect to every statutory phrase so that none is inoperative or superfluous; each phrase must have distinct meaning.
- Later courts cite it for
- “the canon against surplusage indicates that courts generally must give effect to all statutory provisions, so that no part will be inoperative or superfluous- each phrase must have distinct meaning.” · 4 citing courts
- Where it cites § 9620
- “Each complaint included a single state law claim under HSCA seeking, among other things, the costs of medical monitoring and an order compelling the Navy to conduct a health assessment or health effects study that would include blood testing for themselves, and "others exposed…”
- Later courts cite it for
- “the upshot is that the united states has surrendered its immunity with respect to the enforcement of federal, state, and local environmental laws due to contamination at the hands of the government, when such enforcement involves injunctive relief.” · 2 citing courts
- Where it cites § 9620
- “Plaintiff argues that the cleanup is being undertaken pursuant to the authority of § 120 of CERCLA, 42 U.S.C. § 9620 , and therefore is properly categorized as a § 120 clean up.”
- Later courts cite it for
- “its purpose is to minimize the present and future 26 threat to human health and the environment, not effectuate the clean-up of toxic waste sites or 27 allocate those costs.” · 2 citing courts
- The case’s holding
- The government is liable as an arranger and operator under CERCLA when it exercises substantial control over a facility's operations and production.
- Later courts cite it for
- “what product the facility would produce, the level of production, the price of the product, and to whom the product would be sold.” · 6 citing courts
- Where it cites § 9620
- “Moses Lake now seeks to amend its complaint to add a claim under CERCLA against the United States Army Corps of Engineers (USACE) and the United States Environmental Protection Agency (EPA) for violation of 42 U.S.C. § 9620 (§ 120). Moses Lake proposes to bring this claim…”
- Where it cites § 9620
- “"); 42 U.S.C. § 9620 (a)(1) ("Each department, agency, and instrumentality of the United States .”
- The case’s holding
- A waiver of sovereign immunity must be unambiguous and unequivocal and cannot exist if a plausible interpretation of a statute does not authorize money damages against the government.
- Later courts cite it for
- “can only be waived by statutory text that is unambiguous and unequivocal.” · 9 citing courts
- Where it cites § 9620
- “See 42 U.S.C. § 9620 (a)(1) (waiving sovereign immunity); see also FMC Corp.”
- The case’s holding
- A party immune from contribution claims due to a settlement cannot bring a cost-recovery claim, and the statute of limitations for contribution claims begins upon the settlement.
- Later courts cite it for
- “we review the grant or denial of summary judgment de novo.” · 4 citing courts
- Where it cites § 9620
- “42 U.S.C. § 9620 (c). The Administrator of the Environmental Protection Agency must collect in the docket substantial information on federal facility hazardous waste sites.”
- Later courts cite it for
- “the hanford ffa is an integrated cercla response plan and that the activities undertaken pursuant to the ffa are remedial actions selected under cercla section 104 and 120.” · 2 citing courts
- Where it cites § 9620
- “42 U.S.C. § 9620 (h)(1). While CERCLA imposes a duty of disclosure about environmental health hazards on federally owned property, neither the statutory text nor canons of statutory construction suggest that Congress intended CERCLA to override the FTCA’s misrepresentation…”
- Where it cites § 9620
- “CERCLA Covenants Finally, the Air Force was required to comply with Section 120(h) of the Comprehensive Environmental Response Compensation and Liability Act (CERCLA), 42 U.S.C. § 9620 (h), which governs property transferred by Federal agencies.”
- Later courts cite it for
- “the statutory language easily accommodates a claim by a state alleging an environmental hazard.” · 1 citing court
- Where it cites § 9620
- “See 42 U.S.C. § 9620 (h). The district court dismissed the suit and this appeal followed.”
- Later courts cite it for
- “challenges to removal or remedial action selected under section 104, or to review any order issued under 106(a).” · 1 citing court
- Where it cites § 9620
- “The Army indicated that it would, however, comply with RCRA and CHWMA in accordance with CERCLA’s provisions at 42 U.S.C. § 9620 (i) and § 9621(d)(2)(A)(i).”
- The case’s holding
- State enforcement of RCRA obligations does not constitute a challenge to a CERCLA response action and is not preempted by CERCLA.
- Later courts cite it for
- “when congress has enacted two statutes which appear to conflict, we must attempt to construe their provisions harmoniously.” · 4 citing courts
- Where it cites § 9620
- “The second and third counts of the complaint in this court rely on CERCLA § 120(h), 42 U.S.C. § 9620 (h), for the duties CERCLA imposes on the federal government as a transferor of real property.”
- Where it cites § 9620
- “See 42 U.S.C. § 9620 (i) (“Nothing in this section shall affect or impair the obligation of [the Government] to comply with any requirement of [RCRA].”
- The case’s holding
- The statutory bar under CERCLA section 113(h) applies to all challenges to removal or remedial actions regardless of when the claims were filed.
- Later courts cite it for
- “as subject matter jurisdiction presents a threshold question.” · 10 citing courts
- Where it cites § 9620
- “42 U. S. C. §9620 (a)(4). The waiver statute here, Washington points out, does not contain any similarly explicit antidiscrimination language.”
- The case’s holding
- The Supremacy Clause immunizes the federal government from state laws that directly regulate or discriminate against it or the contractors with whom it deals.
- Later courts cite it for
- “state laws that either regulate the united states directly or discriminate against the federal government or those with whom it deals (e.g., contractors).” · 9 citing courts
- Where it cites § 9620
- “Section 120(a)(1) of CERCLA, 42 U.S.C. § 9620 (a)(1), enacted as part of the 1986 SARA amendments, broadly waives the federal government’s sovereign immunity, providing that “[e]ach department, agency, and instrumentality of the United States” is subject to CERCLA’s provisions…”
- The case’s holding
- Government liability under CERCLA as an operator requires actual control over day-to-day facility management and waste disposal decisions rather than mere pervasive wartime regulation.
- Later courts cite it for
- “the government's pervasive wartime regulation of the petroleum industry.” · 2 citing courts
- Where it cites § 9620
- “42 U.S.C. § 9620 (h)(1). Section 120(h)(2) requires the EPA to issue regulations establishing the “form and manner” of the required notice.”
- Where it cites § 9620
- “This federal waiver, now codified at 42 U.S.C.A. § 9620 (a)(1) (West Supp.1987), has been amended, however, to provide that “[n]othing in this section shall be construed to affect the liability of any person or entity under sections 9606 [i.”
- Later courts cite it for
- “extending the eleventh amendment to prohibit congressional power to abrogate under article i would ignore the states' representation in congress and their consent to diminished power implicit in their acceptance of the constitution.” · 3 citing courts
- Where it cites § 9620
- “See 42 U.S.C. § 9620 (e)(1). The purpose of such study is to determine the nature and extent of contamination and identify the possible remedial measures necessary to protect human health and the environment.”
- The case’s holding
- The doctrine of parens patriae provides a state with standing to sue for damages to natural resources but does not grant substantive rights beyond the public trust doctrine.
- Later courts cite it for
- “we have found no judicial authority, however, which suggests the doctrine of parens patriae provides a state substantive rights beyond those provided by the public trust doctrine in a case involving the contamination of a publicly-held natural resource.” · 4 citing courts
- Where it cites § 9620
- “§ 7417 (b) (the President may exempt federal emission source for up to one year if in the "paramount interest of the United States”); Comprehensive Environmental Response, Compensation and Liability Act, 42 U.S.C. § 9620© (the President may issue orders to exempt facilities of…”
- The case’s holding
- Procedural requirements under NEPA mandate that an agency take a hard look at the environmental consequences of its actions.
- Later courts cite it for
- “nepa's procedural requirements mandate that an agency take a 'hard look' at the environmental consequences of its actions.” · 4 citing courts
Show all 121 citing cases (list view) →
The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.
One bar per year. Tallest: 11 cases in 1991. 2026 is a partial year. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.
The 8 courts with the most citing cases, of 49 courts in all.
Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.
Amendment years (notes): 1996, 1992
Edition shown: U.S. Code current through Pub. L. 119-102 (OLRC release point). Syfert holds no earlier or later version of this section.