10 C.F.R. § 60.7 (2026)
License not required for certain preliminary activities
Edition and currency
Other sources
The requirement for a license set forth in § 60.3(a) of this part is not applicable to the extent that DOE receives and possesses source, special nuclear, and byproduct material at a geologic repository:
(a) For purposes of site characterization; or
(b) For use, during site characterization or construction, as components of radiographic, radiation monitoring, or similar equipment or instrumentation.
Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.
Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.