C.F.R. homeSearch C.F.R.
C.F.R.Title 15Chapter VII—Bureau of Industry and Security, Department of CommerceSubchapter A—National Security Industrial Base RegulationsPart 700—Defense Priorities and Allocations SystemSubpart D—Industrial Priorities

15 C.F.R. § 700.12 (2026)

Elements of a rated order

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026 cited 2001–2010 3citing cases
At a glance

Courts have cited this section in 3 opinions since 2001.

(a) Elements required for all rated orders. (1) The appropriate priority rating and program identification symbol (e.g., DO-A1, DX-A2, DO-N1).

(2) A required delivery date or dates. The words “immediately” or “as soon as possible” do not constitute a delivery date. When a “requirements contract,” “basic ordering agreement,” “prime vendor contract,” or similar procurement document bearing a priority rating contains no specific delivery date or dates, but provides for the furnishing of items from time-to-time or within a stated period against specific purchase orders, such as “calls,” “requisitions,” and “delivery orders,” the purchase orders supporting such contracts or agreements must specify a required delivery date or dates and are to be considered as rated as of the date of their receipt by the supplier and not as of the date of the original procurement document.

(3) The written signature on a manually placed order, or the digital signature or name on an electronically placed order, of an individual authorized to sign rated orders for the person placing the order. The signature, manual or digital, certifies that the rated order is authorized under this part and that the requirements of this part are being followed.

(4) A statement that reads in substance: “This is a rated order certified for national defense use and you are required to follow all the provisions of the Defense Priorities and Allocations System regulation (15 CFR part 700).”

(b) Additional element required for certain emergency preparedness rated orders. If a rated order is placed for the purpose of emergency preparedness requirements and expedited action is necessary or appropriate to meet these requirements, the following statement must be included in the order: “This rated order is placed for the purpose of emergency preparedness. It must be accepted or rejected within [Insert a time limit no less than the minimum applicable time limit specified in § 700.13(d)(2)].”

[79 FR 47565, Aug. 14, 2014, as amended at 89 FR 58971, July 22, 2024]
The 3 cases that cite 15 C.F.R. § 700.12 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENArch Chemicals, Inc. v. United States, 64 Fed. Cl. 380 (Fed. Cl. 2005).
cites § 700.12 1×cited by 45 cases
Where it cites § 700.12
“” 15 C.F.R. § 700.12 (b). The contract that is awarded as a result of the Solicitation will be a requirements contract.”
The case’s holding
The administrative record in a bid protest is limited to materials existing at the time of the challenged decision to prevent the use of post hoc rationalizations.
Later courts cite it for
“those created after-the-fact are suspect, as courts . . . recognize that they must reject 'post hoc rationalizations' as a basis for the agency action.” · 2 citing courts
2
NO FLAGFisher v. Halliburton, 696 F. Supp. 2d 710 (S.D. Tex. 2010).
cites § 700.12 2×cited by 0 cases
Where it cites § 700.12
“” 15 C.F.R. § 700.12 (b). These orders must be filled “in a timely manner to satisfy the delivery requirements of each rated order.”
3
NO FLAGVirginia Panel Corp. v. MAC Panel Co., 139 F. Supp. 2d 753 (W.D. Va. 2001).
cites § 700.12 1×cited by 0 cases
Where it cites § 700.12
“The purchase order “certified” the products for use in the DPAS presumably pursuant to 15 C.F.R. § 700.12 (d) (2000), which requires “rated orders” to include such a certification statement.”

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
200120052010

One bar per year. Tallest: 1 case in 2001. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
S.D. Tex.1Fed. Cl.1W.D. Va.1
By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.

C.F.R. Home  |  Search C.F.R.  |  Search cases for this section  |  syfert.com