24 C.F.R. § 3282.601 (2026)

Purpose and applicability

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026

(a) Purpose of section. Under HUD oversight, this section establishes the procedure for limited on-site completion of some aspects of construction that cannot be completed at the factory.

(b) Applicability. This section may be applied when all requirements of this subpart are met. To be applicable a manufactured home must:

(1) Be substantially completed in the factory;

(2) Meet the requirements of the Construction and Safety Standards upon completion of the site work; and

(3) Be inspected by the manufacturer's IPIA as provided in this subpart, unless specifically exempted as installation under HUD's Model Installation Standards, 24 CFR part 3285. This subpart does not apply to Alternative Construction (see § 3282.14) that does not comply with the Manufactured Home Construction and Safety Standards.

(c) Exception. An add-on or attached accessory building or structure which does not affect the performance and ability of the manufactured home to comply with the standards in accordance with § 3282.8(j) is not governed by this section.

[80 FR 53727, Sept. 8, 2015, as amended at 86 FR 2526, Jan. 12, 2021]
Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.