Skip to main content
C.F.R.Title 24Chapter IX—Office of Assistant Secretary for Public and Indian Housing, Department of Housing and Urban DevelopmentPart 965—Pha-Owned or Leased Projects—General ProvisionsSubpart C—Energy Audits and Energy Conservation Measures

24 C.F.R. § 965.304 (2026)

Order of funding

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026

Within the funds available to a PHA, energy conservation measures should be accomplished with the shortest pay-back periods funded first. A PHA may make adjustments to this funding order because of insufficient funds to accomplish high-cost energy conservation measures (ECM) or where an ECM with a longer pay-back period can be more efficiently installed in conjunction with other planned modernization. A PHA may not install individual utility meters that measure the energy or fuel used for space heating in dwelling units that need substantial weatherization, when installation of meters would result in economic hardship for residents. In these cases, the ECMs related to weatherization shall be accomplished before the installation of individual utility meters.

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.