Skip to main content
C.F.R.Title 28Chapter I—Department of JusticePart 91—Grants for Correctional FacilitiesSubpart D—Environmental Impact Review Procedures for Voi/Tis Grant Program

28 C.F.R. § 91.56 (2026)

Actions that normally require the preparation of an environmental assessment

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026

(a) Renovation or expansion of existing correctional facility. Renovation or expansion activities not categorically excluded under § 91.55 require an environmental assessment (EA). An environmental assessment is generally prepared when a project is not expected to have a significant impact on the environment. Since projects for the renovation or expansion of an existing facility or the construction of a new facility within an existing correctional complex may have limited impact on the environment, preparing an EA may be sufficient.

(b) Proposed construction of a new correctional facility. The proposed construction of a new correctional facility will require the preparation of an environmental assessment unless the proposal will clearly have a significant environmental impact in which case an environmental impact statement can be initiated immediately without the preparation of an environmental assessment.

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.