30 C.F.R. § 75.215

Longwall mining systems

Read at: eCFRecfr.gov CornellLII GovInfogovinfo.gov CasesGoogle Scholar

For each longwall mining section, the roof control plan shall specify—

(a) The methods that will be used to maintain a safe travelway out of the section through the tailgate side of the longwall; and

(b) The procedures that will be followed if a ground failure prevents travel out of the section through the tailgate side of the longwall.