Already have an account? Sign in instead.
You stay signed in for 30 days on this browser.
Continue with Google Continue with MicrosoftNo account yet? Create a free one.
We sent a six-digit code.
It expires in ten minutes, works once, and only in this browser. Five wrong tries void it. Send another code.
Your account is live and the Cloudflare checks are off for this browser.
Operations Manual
Each Operations Manual must contain—
(a) A description of the transfer system including mooring areas, transfer connections, control rooms, and diagrams of the piping and electrical systems;
(b) The duties of each person assigned for transfer operations;
(c) The maximum relief valve setting or maximum allowable working pressure of the transfer system;
(d) The facility telephone numbers of facility supervisors, persons in charge of shoreside transfer operations, personnel on watch in the marine transfer area for LNG, and security personnel;
(e) A description of the security systems for the marine transfer area for LNG;
(f) The procedures for—
(1) Transfer operations including gauging, cool down, pumping, venting, and shutdown;
(2) Transfer operations start-up and shutdown;
(3) Security violations; and
(4) The communications systems; and
(g) A description of the training programs established under § 127.503.
Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.
Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.