General authorizations

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026 cited 2009–2010 4citing cases
At a glance

Courts have cited this section in 4 opinions since 2009.

Under the provisions of sections 404(e) of the CWA and 104(c) of the ODA certain categories of activities may be authorized on a regional, statewide, or nationwide basis. General authorizations can be a useful mechanism for implementation of the procedural provisions of the CWA, CZMA, and ODA while avoiding unnecessary duplication and paperwork. Through the general authorization process, compliance with all environmental laws and regulations including coastal zone consistency, if applicable, and water quality certification can be accomplished in a single process for a category of activities. Since the emphasis of particular environmental issues for most Corps projects is more regional than nationwide, district engineers are encouraged to develop general authorizations for routine Civil Works activities involving the discharge of dredged or fill material to address the specific requirements of a particular geographic region. When evaluating general categories of activities, the district engineer should follow the same procedure as outlined for individual Federal activities including the water quality certification and/or coastal zone consistency requirements of part 336 of this chapter. General authorizations should include related activities of local interests. Additionally, district engineers should use existing general permits authorized on a statewide or regional basis and the nationwide permits at 33 CFR part 330 for Federal projects involving the disposal of dredged material. The development of new statewide or regional general authorizations for Federal activities should be in accordance with the requirements of §§ 336.1 and 336.2 of this chapter. General permits for related activities of local interests should be developed using the procedures of 33 CFR parts 320 through 330.

The 4 cases that cite 33 C.F.R. § 337.5 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENAckerson v. Bean Dredging, LLC, 589 F.3d 196 (5th Cir. 2009).
cites § 337.5 1×cited by 185 cases
Where it cites § 337.5
“The Dredging Defendants deviated from and/or failed to execute their dredging activities in the manner required by the Army Corps of Engineers and by the Nationwide Permits, specific permits, or general authorizations for dredging issued by or obtained by the Army Corps of…”
The case’s holding
Public-works contractors are not entitled to derivative sovereign immunity if they commit a separate act of negligence outside the scope of their federal authorization.
2
GREENGreat Lakes Dredge & Dock Co. v. Louisiana State, 624 F.3d 201 (5th Cir. 2010).
cites § 337.5 1×cited by 60 cases
Where it cites § 337.5
“ioners and the Vessels deviated from and/or failed to execute their dredging activities in the manner required by the Corps of Engineers, or by reasonably precise specifications issued by the Corps of Engineers (if they were issued) and/or by Nationwide Permits, specific…”
The case’s holding
Under maritime law, a defendant owes a duty of care only to interests that are foreseeably jeopardized by the negligent conduct.
Later courts cite it for
“to be plausible, the complaint's 'factual allegations must be enough to raise a right to relief above the speculative level.” · 86 citing courts
3
GREENIn re Great Lakes Dredge & Dock Co. LLC, 624 F.3d 201 (5th Cir. 2010).
cites § 337.5 1×cited by 188 cases
Where it cites § 337.5
“ioners and the Vessels deviated from and/or failed to execute their dredging activities in the manner required by the Corps of Engineers, or by reasonably precise specifications issued by the Corps of Engineers (if they were issued) and/or by Nationwide Permits, specific…”
4
GREENAckerson v. Bean Dredging LlC, 589 F.3d 196 (5th Cir. 2009).
cites § 337.5 1×cited by 1 case
Where it cites § 337.5
“The Dredging Defendants deviated from and/or failed to execute their dredging activities in the manner required by the Army Corps of Engineers and by the Nationwide Permits, specific permits, or general authorizations for dredging issued by or obtained by the Army Corps of…”
The case’s holding
A contractor performing work under a federal contract authorized by Congress is immune from liability for damages unless the contractor commits a separate act of negligence.
Later courts cite it for
“focuses on the allegations in the pleadings and not on whether the plaintiff actually has sufficient evidence to succeed on the merits.” · 8 citing courts

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
200920092010

One bar per year. Tallest: 2 cases in 2009. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.

C.F.R. Home  |  Search C.F.R.  |  Search cases for this section  |  syfert.com