40 C.F.R. § 60.2716
By what date must I conduct the annual air pollution control device inspection?
✓ eCFR text as of Sept. 29, 2026
On an annual basis (no more than 12 months following the previous annual air pollution control device inspection), you must complete the air pollution control device inspection as described in § 60.2706.