Skip to main content
C.F.R.Title 41Chapter 101—Federal Property Management RegulationsSubchapter E—Supply and ProcurementPart 101-30—Federal Catalog SystemSubpart 101-30.7—Item Reduction Program

41 C.F.R. § 101-30.702 (2026)

Determining item reduction potential

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026

Item reduction studies are required where there are large numbers of generally similar items which are subject to grouping and examination by item name, item name modifiers, or other characteristics such as sizes, grades, lengths, and materials. Before conducting a full scale item reduction study, the assignee activity shall determine whether sufficient item reduction potential appears to exist. Item reduction studies shall be undertaken only when the expected benefits outweigh the costs of performing the study.

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.