46 C.F.R. § 153.983 (2026)
Termination procedures
Edition and currency
Other sources
Upon completion of the transfer operation, the person in charge of cargo transfer shall ensure that:
(a) The cargo transfer connections are closed off;
(b) The transfer lines and hoses are drained of cargo, either into the tank or back to the transfer terminal;
(c) Any electrical bonding between the vessel and the shore facility is broken only after the cargo hose is disconnected and all spills removed; and
(d) Each vent system is returned to its nonloading configuration.
Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.
Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.