Skip to main content
C.F.R.Title 46Chapter I—Coast Guard, Department of Homeland SecuritySubchapter O—Certain Bulk Dangerous CargoesPart 154—Safety Standards for Self-Propelled Vessels Carrying Bulk Liquefied GasesSubpart C—Design, Construction and Equipment

46 C.F.R. § 154.655 (2026)

Stress relief for independent tanks type C

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026

For a design temperature colder than −10 °C (14 °F), an independent tank type C of:

(a) Carbon and carbon-manganese steel must be stress relieved by post-weld heat treatment under § 54.25-7 of this chapter or by mechanical stress relief under subpart 54.30 of this chapter; or

(b) Materials other than carbon and carbon manganese steel must be stress relieved as required under part 54 of this chapter. The procedure for stress relieving must be specially approved by the Commandant (CG-OES).

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.