Skip to main content
C.F.R.Title 46Chapter I—Coast Guard, Department of Homeland SecuritySubchapter A—Procedures Applicable to the PublicPart 2—Vessel InspectionsSubpart 2.75—Approvals of Safety Equipment, Materials and Installations, and Qualifications for Construction Personnel

46 C.F.R. § 2.75-10 (2026)

Procedures for obtaining approvals

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026

(a) The requirements for obtaining approvals of items covered by specifications and bearing official Coast Guard approval numbers are set forth in parts 159 through 164 of this chapter. For other items, the requirements are described in the regulations governing such items.

(b) Unless otherwise specified, correspondence concerning approvals should be submitted electronically to [email protected]. When plans, drawings, test data, etc., are required to be submitted by the manufacturer, the material being transmitted with the application should be clearly identified.

(c) If the manufacturer requests that hard copy stamped plans be returned to them, or if product samples must be submitted, the plans or samples must be addressed to the Commandant (CG-ENG), Attn: Office of Design and Engineering Standards, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE, Washington, DC 20593-7509. When submitted, hard copy plans must be accompanied by electronic drawings or must be submitted in triplicate.

[CGD 76-048, 44 FR 73043, Dec. 17, 1979, as amended by CGD 82-063b, 48 FR 4781, Feb. 3, 1983; CGD 88-070, 53 FR 34533, Sept. 7, 1988; CGD 95-072, 60 FR 50459, Sept. 29, 1995; CGD 96-041, 61 FR 50725, Sept. 27, 1996; USCG-2020-0519, 89 FR 76695, Sept. 18, 2024]
Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.