Skip to main content
C.F.R.Title 46Chapter I—Coast Guard, Department of Homeland SecuritySubchapter E—Load LinesPart 45—Great Lakes Load LinesSubpart D—Conditions of Assignment

46 C.F.R. § 45.119 (2026)

Freeing port area: Changes from standard sheer

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026

The freeing port area required by § 45.117(b) must be multiplied by the factor in the following table 5 if the sheer differs from the standard sheer defined in § 45.63. table 4.

Table 5

Freeing port area: Sheer correction.

Ratio of sums of actual sheer ord./std. sheer ord. Greater than:Multiplier for area required by § 45.117(b)
1.01.0
1.01.00
0.91.05
0.81.10
0.71.15
0.61.20
0.51.25
0.41.30
0.31.35
0.21.40
0.11.45
No sheer1.50
Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.