46 C.F.R. § 45.119

Freeing port area: Changes from standard sheer

Read at: eCFRecfr.gov CornellLII GovInfogovinfo.gov CasesGoogle Scholar

The freeing port area required by § 45.117(b) must be multiplied by the factor in the following table 5 if the sheer differs from the standard sheer defined in § 45.63. table 4.

Table 5

Freeing port area: Sheer correction.

Ratio of sums of actual sheer ord./std. sheer ord. Greater than:Multiplier for area required by § 45.117(b)
1.01.0
1.01.00
0.91.05
0.81.10
0.71.15
0.61.20
0.51.25
0.41.30
0.31.35
0.21.40
0.11.45
No sheer1.50