Skip to main content
C.F.R.Title 46Chapter I—Coast Guard, Department of Homeland SecuritySubchapter G—Documentation and Measurement of VesselsPart 69—Measurement of VesselsSubpart D —Dual Regulatory Measurements System

46 C.F.R. § 69.183 (2026)

Figures

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026

(a) Tonnage mark with an equilateral triangle and a line for fresh and tropical waters.

W= 1/48 of the distance from the top of the flat keel to the tonnage mark. (See § 69.177(b)(2).)

(b) Tonnage mark location if the load line mark is not placed as though the second deck were the freeboard deck.

k = a distance between 21 inches and six feet six inches. a = distance derived from Table 69.177(a)(5).

(c)—Tonnage mark location if the load line mark is placed as though the second deck were the freeboard deck.

k = a distance between 21 inches and six feet six inches. a = the distance between the line of the second deck and the uppermost part of the load line grid.[CGD 87-015b, 54 FR 37657, Sept. 12, 1989, as amended by USCG-2011-0522, 81 FR 18732, Mar. 31, 2016]
Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.