C.F.R. homeSearch C.F.R.
C.F.R.Title 47Chapter I—Federal Communications CommissionSubchapter C—Broadcast Radio ServicesPart 73—Radio Broadcast ServicesSubpart F—International Broadcast Stations

47 C.F.R. § 73.761 (2026)

Modification of transmission systems

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026

Specific authority, upon electronic filing of a formal application (FCC Form 309) therefor in the International Communications Filing System (ICFS), is required for any of the following changes:

(a) Change involving an increase or decrease in the power rating of the transmitters.

(b) A replacement of the transmitters as a whole.

(c) Change in the location of the transmitting antenna.

(d) Change in the power delivered to the antenna.

(e) Change in frequency control and/or modulation system.

(f) Change in direction or gain of antenna system.

(g) Other changes, not specified above in this section, may be made at any time without the authority of the Commission: Provided, That the Commission shall be immediately notified electronically in ICFS thereof and such changes shall be shown in the next application for renewal of license.

[86 FR 54401, Oct. 1, 2021, as amended at 88 FR 21447, Apr. 10, 2023]
Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.

C.F.R. Home  |  Search C.F.R.  |  Search cases for this section  |  syfert.com