Already have an account? Sign in instead.
You stay signed in for 30 days on this browser.
Continue with Google Continue with MicrosoftNo account yet? Create a free one.
We sent a six-digit code.
It expires in ten minutes, works once, and only in this browser. Five wrong tries void it. Send another code.
Your account is live and the Cloudflare checks are off for this browser.
Acceptable results of tests and inspections
(a) Corroded or abraded areas. The minimum thickness may not be less than that prescribed in the applicable specification.
(b) Dents, cuts, digs and gouges. For evaluation procedures, see CGA C-6 (IBR, see § 171.7 of this subchapter).
(1) For dents at welds or that include a weld, the maximum allowable depth is
(2) The minimum thickness remaining beneath a cut, dig, or gouge may not be less than that prescribed in the applicable specification.
(c) Weld or structural defects. Any cargo tank with a weld defect such as a crack, pinhole, or incomplete fusion, or a structural defect must be taken out of hazardous materials service until repaired.
(d) Leakage. All sources of leakage must be properly repaired prior to returning a tank to hazardous materials service.
(e) Relief valves. Any pressure relief valve that fails to open and reclose at the prescribed pressure must be repaired or replaced.
(f) Liner integrity. Any defect shown by the test must be properly repaired.
(g) Pressure test. Any tank that fails to meet the acceptance criteria found in the individual specification that applies must be properly repaired.
Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.
Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.