Already have an account? Sign in instead.
You stay signed in for 30 days on this browser.
Continue with Google Continue with MicrosoftNo account yet? Create a free one.
We sent a six-digit code.
It expires in ten minutes, works once, and only in this browser. Five wrong tries void it. Send another code.
Your account is live and the Cloudflare checks are off for this browser.
Steel pipe
(a) New steel pipe is qualified for use under this part if:
(1) It was manufactured in accordance with a listed specification;
(2) It meets the requirements of—
(i) Section II of appendix B to this part; or
(ii) If it was manufactured before November 12, 1970, either section II or III of appendix B to this part; or
(3) It is used in accordance with paragraph (c) or (d) of this section.
(b) Used steel pipe is qualified for use under this part if:
(1) It was manufactured in accordance with a listed specification and it meets the requirements of paragraph II-C of appendix B to this part;
(2) It meets the requirements of:
(i) Section II of appendix B to this part; or
(ii) If it was manufactured before November 12, 1970, either section II or III of appendix B to this part;
(3) It has been used in an existing line of the same or higher pressure and meets the requirements of paragraph II-C of appendix B to this part; or
(4) It is used in accordance with paragraph (c) of this section.
(c) New or used steel pipe may be used at a pressure resulting in a hoop stress of less than 6,000 p.s.i. (41 MPa) where no close coiling or close bending is to be done, if visual examination indicates that the pipe is in good condition and that it is free of split seams and other defects that would cause leakage. If it is to be welded, steel pipe that has not been manufactured to a listed specification must also pass the weldability tests prescribed in paragraph II-B of appendix B to this part.
(d) Steel pipe that has not been previously used may be used as replacement pipe in a segment of pipeline if it has been manufactured prior to November 12, 1970, in accordance with the same specification as the pipe used in constructing that segment of pipeline.
(e) New steel pipe that has been cold expanded must comply with the mandatory provisions of API Spec 5L (incorporated by reference, see § 192.7).
Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.
Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.