C.F.R. homeSearch C.F.R.
C.F.R.Title 49Chapter I—Pipeline and Hazardous Materials Safety Administration, Department of TransportationSubchapter D—Pipeline SafetyPart 192—Transportation of Natural and Other Gas By Pipeline: Minimum Federal Safety StandardsSubpart O—Gas Transmission Pipeline Integrity Management

49 C.F.R. § 192.909 (2026)

How can an operator change its integrity management program?

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026

(a) General. An operator must document any change to its program and the reasons for the change before implementing the change.

(b) Notification. An operator must notify OPS, in accordance with § 192.18, of any change to the program that may substantially affect the program's implementation or may significantly modify the program or schedule for carrying out the program elements. An operator must provide notification within 30 days after adopting this type of change into its program.

[68 FR 69817, Dec. 15, 2003, as amended by Amdt. 192-95, 69 FR 18231, Apr. 6, 2004; Amdt. 192-125, 84 FR 52253, Oct. 1, 2019]
Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.

C.F.R. Home  |  Search C.F.R.  |  Search cases for this section  |  syfert.com