Already have an account? Sign in instead.
You stay signed in for 30 days on this browser.
Continue with Google Continue with MicrosoftNo account yet? Create a free one.
We sent a six-digit code.
It expires in ten minutes, works once, and only in this browser. Five wrong tries void it. Send another code.
Your account is live and the Cloudflare checks are off for this browser.
Hydrostatic testing of boilers
(a) Time of test. The locomotive owner and/or operator shall hydrostatically test every boiler at the following times:
(1) During the 1472 service day inspection, and at every annual inspection thereafter;
(2) After making any alteration to the boiler;
(3) After installing a flush patch on an unstayed portion of the boiler; and
(4) After any riveting on an unstayed portion of the boiler.
(b) Method of testing. The metal temperature of the boiler shall be between 70 degrees Fahrenheit and 120 degrees Fahrenheit each time it is subjected to any hydrostatic pressure. Hydrostatic testing required by these rules shall be conducted at 25 percent above the MAWP.
(c) Internal inspection. An internal inspection of the boiler shall be conducted following any hydrostatic test where the pressure exceeds MAWP.
Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.
Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.