C.F.R. homeSearch C.F.R.
C.F.R.Title 49Chapter II—Federal Railroad Administration, Department of TransportationPart 236—Rules, Standards, And Instructions Governing the Installation, Inspection, Maintenance, And Repair of Signal and Train Control Systems, Devices, And AppliancesSubpart C—Interlocking

49 C.F.R. § 236.303 (2026)

Control circuits for signals, selection through circuit controller operated by switch points or by switch locking mechanism

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026

The control circuit for each aspect with indication more favorable than “proceed at restricted speed” of power operated signal governing movements over switches, movable-point frogs and derails shall be selected through circuit controller operated directly by switch points or by switch locking mechanism, or through relay controlled by such circuit controller, for each switch, movable-point frog, and derail in the routes governed by such signal. Circuits shall be arranged so that such signal can display an aspect more favorable than “proceed at restricted speed,” only when each switch, movable-point frog, and derail in the route is in proper position.

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.

C.F.R. Home  |  Search C.F.R.  |  Search cases for this section  |  syfert.com