C.F.R. homeSearch C.F.R.
C.F.R.Title 49Chapter II—Federal Railroad Administration, Department of TransportationPart 236—Rules, Standards, And Instructions Governing the Installation, Inspection, Maintenance, And Repair of Signal and Train Control Systems, Devices, And AppliancesSubpart C—Interlocking

49 C.F.R. § 236.382 (2026)

Switch obstruction test

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026

Switch obstruction test of lock rod of each power-operated switch and lock rod of each hand-operated switch equipped with switch-and-lock-movement shall be made when lock rod is placed in service or changed out, but not less than once each month.

[49 FR 3385, Jan. 26, 1984]
Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.

C.F.R. Home  |  Search C.F.R.  |  Search cases for this section  |  syfert.com