Chapter 25-12 — Safety of Gas Transportation by Pipeline

60 rules · Departmental· official chapter page

25-12.001 Authorization
25-12.002 Application
25-12.003 Scope
25-12.004 Definitions 12/15/2009
25-12.005 Codes and Standards Adopted 5/12/2025
25-12.006 Commission Interpretation of Rules
25-12.007 Commission Compliance Evaluations 1/7/1992
25-12.008 New, Reconstructed or Converted Facilities 5/12/2025
25-12.009 Safety 10/2/1984
25-12.010 Employee Education
25-12.011 Customer Piping and Appliances
25-12.012 Disconnection of Services Due to Inactivity
25-12.013 Investigation of Gas Leak Complaints
25-12.014 Unauthorized Operation of Company Facilities
25-12.020 Construction Specifications and Inspections 1/7/1992
25-12.021 Use of Plastic Pipe 1/7/1992
25-12.022 Requirements for Distribution System Valves 3/2/2017
25-12.023 Limitations on Underground Threaded Joints
25-12.024 Prohibition of Pipelines Under Buildings 10/7/1975
25-12.025 Limitations on Materials Used
25-12.026 Service Regulator Requirements
25-12.027 Welder Qualification 5/12/2025
25-12.028 Marking of Materials 1/7/1992
25-12.029 Limiting Use of Pipeline Casings 1/7/1992
25-12.030 Construction Inspection 1/7/1992
25-12.039 Operating and Maintenance Plans
25-12.040 Leak Surveys, Procedures and Classification 3/2/2017
25-12.041 Receiving of Gas Leak and Emergency Reports 12/15/2009
25-12.042 Investigation of Gas Leak Reports 10/2/1984
25-12.043 Gas Service 8/8/1989
25-12.044 Interruption of Gas Service 8/8/1989
25-12.045 Inactive Gas Service Lines 5/12/2025
25-12.046 Unauthorized Utilization of Gas Facilities 8/8/1989
25-12.047 Maximum Allowable Operating Pressure
25-12.048 Inspection of Vaults
25-12.049 Establishment and Maintenance of Sectionalizing Values
25-12.050 Facility Identification 1/7/1992
25-12.051 Corrosion Requirements for Steel Tubing
25-12.052 Corrosion Control Criteria for Cathodic Protection of Buried or Submerged Metallic Pipeline 5/12/2025
25-12.053 Cathodic Protection - Electrical Survey 1/7/1992
25-12.054 Cathodic Protection - Location of Reference Half-Cell 10/7/1975
25-12.055 Odorization of Gas 1/7/1992
25-12.060 General Records 10/2/1984
25-12.061 System Maps 10/7/1975
25-12.062 Leak Reports 10/2/1984
25-12.063 Welding
25-12.064 Materials
25-12.065 Construction Records
25-12.066 Testing Records
25-12.067 Operation and Maintenance Records
25-12.080 General 12/15/2009
25-12.081 Inspection and Maintenance Procedures
25-12.082 Construction Notice 10/11/2012
25-12.083 Requalifying Maximum Allowable Operating Pressure 10/2/1984
25-12.084 Notice of Accidents and Outages 12/15/2009
25-12.085 Written Annual Reports Required 3/2/2017
25-12.086 Written Reports Required – Transmission Systems
25-12.0861 Response to Commission Staff Inquiries 10/2/1984
25-12.087 Compliance With Federal Reporting Requirements
25-12.100 Penalties 7/1/2025