Chapter 25-6 — Electric Service by Electric Public Utilities
98 rules · Departmental· official chapter page
| 25-6.001 | Authorization of Rules | |
| 25-6.002 | Application and Scope | 1/31/2000 |
| 25-6.003 | Definitions | 9/1/2026 |
| 25-6.004 | Reference to Commission (Repealed) | 11/28/2012 |
| 25-6.0131 | Regulatory Assessment Fees; Investor-owned Electric Companies, Municipal Electric Utilities, Rural Electric Cooperatives | 4/1/2024 |
| 25-6.014 | Records and Reports in General | 2/2/2015 |
| 25-6.0141 | Allowance for Funds Used During Construction | 1/26/2021 |
| 25-6.0142 | Uniform Retirement Units for Electric Utilities | 11/8/1999 |
| 25-6.0143 | Use of Accumulated Provision Accounts 228.1, 228.2, and 228.4 | 6/28/2021 |
| 25-6.0144 | Fair Value of Energy Produced While Testing Electric Generating Units | 10/6/1994 |
| 25-6.015 | Location and Preservation of Records | 2/2/2015 |
| 25-6.0151 | Audit Access to Records | 2/28/1995 |
| 25-6.016 | Maps and Records | 7/29/1969 |
| 25-6.018 | Records of Interruptions and Commission Notification of Threats to Bulk Power Supply Integrity or Major Interruptions of Service | 4/27/2004 |
| 25-6.0183 | Electric Utility Procedures for Generating Capacity Shortage Emergencies | 8/26/2024 |
| 25-6.0185 | Electric Utility Procedures for Long-Term Energy Emergencies | 3/24/1999 |
| 25-6.019 | Notification of Events | 12/16/2012 |
| 25-6.020 | Record of Applications for Service | 7/29/1969 |
| 25-6.021 | Records of Complaints | 7/29/1969 |
| 25-6.022 | Record of Metering Devices and Metering Device Tests | 7/3/2006 |
| 25-6.030 | Storm Protection Plan | 2/18/2020 |
| 25-6.031 | Storm Protection Plan Cost Recovery Clause | 2/18/2020 |
| 25-6.033 | Tariffs | 12/30/2019 |
| 25-6.034 | Standard of Construction | 5/12/2025 |
| 25-6.0341 | Location of the Utilityâs Electric Distribution Facilities | 2/1/2007 |
| 25-6.0342 | Electric Infrastructure Storm Hardening (Repealed) | 6/2/2020 |
| 25-6.0343 | Municipal Electric Utility and Rural Electric Cooperative Reporting Requirements | 12/10/2020 |
| 25-6.0345 | Safety Standards for Construction of New Transmission and Distribution Facilities | 5/12/2025 |
| 25-6.0346 | Quarterly Reports of Work Orders and Safety Compliance | 3/2/2017 |
| 25-6.035 | Adequacy of Resources | 5/29/2001 |
| 25-6.036 | Inspection of Plant (Repealed) | 12/30/2019 |
| 25-6.037 | Extent of Facilities and Equipment That a Utility Must Inspect, Operate, and Maintain | 12/30/2019 |
| 25-6.038 | Change in Character of Service | 7/29/1969 |
| 25-6.039 | Safety | 7/29/1969 |
| 25-6.040 | Grounding of Primary and Secondary Distribution System Circuits | 4/13/1980 |
| 25-6.042 | Response to Commission Staff Inquiries (Repealed) | 11/28/2012 |
| 25-6.0423 | Nuclear or Integrated Gasification Combined Cycle Power Plant Cost Recovery | 1/29/2014 |
| 25-6.0424 | Petition for Mid-Course Correction | 7/19/2010 |
| 25-6.0425 | Rate Adjustment Applications and Procedures | 1/8/1987 |
| 25-6.0426 | Recovery of Economic Development Expenses | 8/19/2019 |
| 25-6.043 | Investor-Owned Electric Utility Petition for Rate Increase; Commission Designee | 1/27/2021 |
| 25-6.0431 | Petition for a Limited Proceeding | 10/8/2013 |
| 25-6.0435 | Interim Rate Relief | 2/12/2004 |
| 25-6.0436 | Depreciation | 4/28/2016 |
| 25-6.04361 | Subcategorization of Electric Plant for Depreciation Studies and Rate Design | 12/12/1991 |
| 25-6.04364 | Electric Utilities Dismantlement Studies | 4/28/2016 |
| 25-6.04365 | Nuclear Decommissioning | 1/30/2001 |
| 25-6.0437 | Cost of Service Load Research | 1/6/2004 |
| 25-6.0438 | Non-Firm Electric Service - Terms and Conditions | 1/31/2000 |
| 25-6.0439 | Territorial Agreements and Disputes for Electric Utilities - Definitions | 3/4/1990 |
| 25-6.044 | Continuity of Service | 8/17/2006 |
| 25-6.0440 | Territorial Agreements for Electric Utilities | 8/5/2020 |
| 25-6.0441 | Territorial Disputes for Electric Utilities | 8/5/2020 |
| 25-6.0442 | Customer Participation | 3/4/1990 |
| 25-6.0455 | Annual Distribution Service Reliability Report | 8/17/2006 |
| 25-6.046 | Voltage Standards | 2/25/1993 |
| 25-6.047 | Constant Current Standards (Repealed) | 10/26/2020 |
| 25-6.048 | Limiting Connected Load | 7/29/1969 |
| 25-6.049 | Measuring Customer Service | 10/10/2006 |
| 25-6.050 | Location of Meters | 2/4/2013 |
| 25-6.052 | Test Procedures and Accuracies of Consumption Metering Devices | 7/3/2006 |
| 25-6.054 | Laboratory Standards | 10/26/2020 |
| 25-6.055 | Portable Standards | 5/19/1997 |
| 25-6.056 | Metering Device Test Plans | 7/3/2006 |
| 25-6.058 | Determination of Average Meter Error | 10/27/2014 |
| 25-6.059 | Meter Test by Request | 7/3/2006 |
| 25-6.060 | Meter Test - Refereed Dispute | 12/16/2012 |
| 25-6.061 | Relocation of Poles | 7/29/1969 |
| 25-6.062 | Inspection of Wires and Equipment | 7/29/1969 |
| 25-6.064 | Extension of Facilities; Contribution in Aid of Construction | 12/10/2020 |
| 25-6.065 | Interconnection and Metering of Customer-Owned Renewable Generation | 4/7/2008 |
| 25-6.074 | Applicability | 10/26/2020 |
| 25-6.075 | Definitions | 4/13/1980 |
| 25-6.076 | Rights of Way and Easements | 4/10/1971 |
| 25-6.077 | Installation of Underground Distribution Systems Within New Subdivisions | 10/29/1997 |
| 25-6.078 | Schedule of Charges | 12/10/2020 |
| 25-6.080 | Advances by Applicant | 4/10/1971 |
| 25-6.081 | Construction Practices (Repealed) | 10/26/2020 |
| 25-6.082 | Records and Reports (Repealed) | 10/26/2020 |
| 25-6.093 | Information to Customers | 2/1/2016 |
| 25-6.094 | Complaints and Service Requests | 12/15/1985 |
| 25-6.095 | Initiation of Service | 7/29/1969 |
| 25-6.097 | Customer Deposits | 2/1/2016 |
| 25-6.099 | Meter Readings | 4/13/1980 |
| 25-6.100 | Customer Billings | 2/1/2016 |
| 25-6.101 | Delinquent Bills | 2/25/1976 |
| 25-6.102 | Conjunctive Billing | 7/29/1969 |
| 25-6.103 | Adjustment of Bills for Meter Error | 7/3/2006 |
| 25-6.104 | Unauthorized Use of Energy | 10/26/2020 |
| 25-6.105 | Refusal or Discontinuance of Service by Utility | 1/7/1993 |
| 25-6.106 | Underbillings and Overbillings of Energy | 11/21/1982 |
| 25-6.109 | Refunds | 8/18/1983 |
| 25-6.115 | Facility Charges for Conversion of Existing Overhead Investor-owned Distribution Facilities | 12/10/2020 |
| 25-6.135 | Annual Reports | 3/30/2004 |
| 25-6.140 | Test Year Notification; Proposed Agency Action Notification | 10/6/1994 |
| 25-6.1351 | Cost Allocation and Affiliate Transactions | 3/30/2004 |
| 25-6.1352 | Earnings Surveillance Report | 3/14/1996 |
| 25-6.1353 | Forecasted Earnings Surveillance Report | 1/11/1995 |