Chapter 40E-3 — Water Wells
31 rules · South Florida Water Management District· official chapter page
| 40E-3.010 | Review of Water Well Permit Applications (Repealed) | 5/27/2012 |
| 40E-3.011 | Policy and Purpose | 6/8/2015 |
| 40E-3.021 | Definitions | 6/8/2015 |
| 40E-3.032 | Delegation | 3/16/2005 |
| 40E-3.035 | Agreements | 6/8/2015 |
| 40E-3.036 | Rules and Publications Incorporated by Reference | 6/8/2015 |
| 40E-3.038 | Contractor Licensing and Well Construction Requirements | 6/8/2015 |
| 40E-3.040 | Scope of Part I | 6/8/2015 |
| 40E-3.041 | Permits Required | 6/8/2015 |
| 40E-3.042 | Multiple Wells Under a Single Permit | 6/8/2015 |
| 40E-3.051 | Exemptions | 6/8/2015 |
| 40E-3.0511 | Exceptions and Variances for Well Construction Permits (Repealed) | 5/27/2012 |
| 40E-3.101 | Content of Application | 6/8/2015 |
| 40E-3.301 | Conditions for Issuance of Permits | 7/14/2014 |
| 40E-3.321 | Duration of Permits | 6/8/2015 |
| 40E-3.341 | Suspension and Revocation | 3/16/2005 |
| 40E-3.411 | Well Completion Reports | 6/8/2015 |
| 40E-3.451 | Emergency Authorization | 6/8/2015 |
| 40E-3.461 | Inspection | 6/8/2015 |
| 40E-3.500 | Scope of Part II | 6/8/2015 |
| 40E-3.502 | Construction Methods | 6/8/2015 |
| 40E-3.504 | Location | 3/16/2005 |
| 40E-3.507 | Casing and Liner Pipe Standards | 6/8/2015 |
| 40E-3.512 | Well Construction Requirements | 9/26/2012 |
| 40E-3.517 | Grouting and Sealing | 6/8/2015 |
| 40E-3.521 | Well Seals | 9/26/2012 |
| 40E-3.525 | Explosives | 3/16/2005 |
| 40E-3.529 | Flowing Wells | 3/16/2005 |
| 40E-3.531 | Abandoned Well Plugging | 3/16/2005 |
| 40E-3.600 | Scope of Part III | 6/8/2015 |
| 40E-3.601 | General Permit for Water Wells within a Portion of Southern Miami-Dade County | 9/26/2012 |