Chapter 62-565 — Potable Reuse

28 rules · Departmental· official chapter page

62-565.100 General 2/26/2025
62-565.200 Definitions 2/26/2025
62-565.300 Forms and References 2/26/2025
62-565.400 Signatories to Permit Applications and Reports 2/26/2025
62-565.500 Requirements for Potable Reuse Systems 2/26/2025
62-565.505 Industrial Pretreatment Requirements for Potable Reuse Systems 2/26/2025
62-565.510 Aquifer Storage and Recovery (ASR) Systems Associated with Potable Reuse Systems 2/26/2025
62-565.520 Off-spec Storage Requirements for Advanced Treatment Water Facilities 2/26/2025
62-565.530 Pathogen Requirements for Potable Reuse Systems 2/26/2025
62-565.540 Monitoring Requirements for Advanced Treatment Water Facilities and Potable Reuse Systems 2/26/2025
62-565.550 Reporting Requirements for Advanced Treatment Water Facilities 2/26/2025
62-565.560 Pilot Testing Program 2/26/2025
62-565.570 Engineering Report 2/26/2025
62-565.580 Design and Construction 2/26/2025
62-565.590 Operation and Maintenance 2/26/2025
62-565.600 Procedure to Obtain Permits 2/26/2025
62-565.605 Standards for Issuing or Denying Permits 2/26/2025
62-565.610 Revisions to Permit Conditions 2/26/2025
62-565.615 Renewals 2/26/2025
62-565.620 Transfer of Permit 2/26/2025
62-565.625 Suspension and Revocation 2/26/2025
62-565.630 Recordkeeping 2/26/2025
62-565.635 Application Processing 2/26/2025
62-565.640 Public Notice 2/26/2025
62-565.645 Public Comments and Requests for Public Meetings 2/26/2025
62-565.650 General Conditions for All Permits 2/26/2025
62-565.655 Guidelines for Establishing Specific Permit Conditions 2/26/2025
62-565.700 Compliance for Advanced Treatment Water Facilities and Potable Reuse Systems 2/26/2025