§ 126. The decision. 1. The commission shall render a decision upon
the record either granting or denying the application as filed or
granting it upon such terms, conditions, limitations or modifications of
the construction or operation of the facility as the commission may deem
appropriate. If the commission denies the application, it shall file,
with its order, an opinion stating in full its reasons for the denial.
Except as provided in subdivision two of this section, the commission
may not grant a certificate for the construction or operation of a major
utility transmission facility, either as proposed or as modified by the
commission, unless it shall find and determine:
  (a) the basis of the need for the facility;
  (b) the nature of the probable environmental impact;
  * (c) that the facility avoids or minimizes to the extent practicable
any significant adverse environmental impact, considering the state of
available technology and the nature and economics of the various
alternatives, and other pertinent considerations including but not
limited to, the effect on agricultural lands, wetlands, parklands and
river corridors traversed;
  * NB Effective until December 31, 2030
  * (c) that the facility represents the minimum adverse environmental
impact, considering the state of available technology and the nature and
economics of the various alternatives, and other pertinent
considerations including but not limited to, the effect on agricultural
lands, wetlands, parklands and river corridors traversed;
  * NB Effective December 31, 2030
  * (d) that the facility avoids or minimizes to the extent practicable
any significant adverse impact on active farming operations that produce
crops, livestock and livestock products, as defined in section three
hundred one of the agriculture and markets law, considering the state of
available technology and the nature and economics of various
alternatives, and the ownership and easement rights of the impacted
property;
  * NB Effective until December 31, 2030
  * (d) that the facility represents a minimum adverse impact on active
farming operations that produce crops, livestock and livestock products,
as defined in section three hundred one of the agriculture and markets
law, considering the state of available technology and the nature and
economics of various alternatives, and the ownership and easement rights
of the impacted property;
  * NB Effective December 31, 2030
  (e) in the case of an electric transmission line, (1) what part, if
any, of the line shall be located underground; (2) that such facility
conforms to a long-range plan for expansion of the electric power grid
of the electric systems serving this state and interconnected utility
systems, which will serve the interests of electric system economy and
reliability;
  (f) in the case of a gas transmission line, that the location of the
line will not pose an undue hazard to persons or property along the area
traversed by the line;
  (g) that the location of the facility as proposed conforms to
applicable state and local laws and regulations issued thereunder, all
of which shall be binding upon the commission, except that the
commission may refuse to apply any local ordinance, law, resolution or
other action or any regulation issued thereunder or any local standard
or requirement which would be otherwise applicable if it finds that as
applied to the proposed facility such is unreasonably restrictive in
view of the existing technology, or of factors of cost or economics, or
of the needs of consumers whether located inside or outside of such
municipality;
  (h) that the facility will serve the public interest, convenience, and
necessity, provided, however, that a determination of necessity made by
the power authority of the state of New York pursuant to section ten
hundred five of the public authorities law for a major utility
transmission facility for which an application has been filed prior to
July first, nineteen hundred seventy-eight pursuant to section one
hundred twenty-two of this chapter, shall be conclusive on the
commission.
  2. In the case of an electric transmission line to be constructed by
the power authority of the state of New York and located in part under
the waters of Long Island Sound and for the remaining part underground,
the commission shall make only the findings and determinations required
by paragraphs (b), (c) and (f) of subdivision one of this section and,
on the basis of such findings and determinations, shall grant, grant in
part, or deny the certificate.
  3. If the commission determines that the location of all or a part of
the proposed facility should be modified, it may condition its
certificate upon such modification, provided that the municipalities and
persons residing in such municipalities affected by the modification
shall have had notice of the application as provided in subdivision two
of section one hundred twenty-two.
  4. A copy of the order and any opinion issued therewith pursuant to
section one hundred twenty-seven shall be served upon each party.
Notes of Decisions
Cited in 10 cases (1 in the last 5 years), 1986–2023 · leading case: Niagara Mohawk Power Corp. v. Pub. Serv. Comm'n, 164 A.D.2d 502 (N.Y. App. Div. 3d Dep't 1990).
Niagara Mohawk Power Corp. v. Pub. Serv. Comm'n, 164 A.D.2d 502 (N.Y. App. Div. 3d Dep't 1990). · cites it 6× “Petitioner first contends that the PSC misapplied the "public interest” requirement of Public Service Law § 126 (1) (g) by failing to make a comparative evaluation of the competing proposals and determining only that Selkirk’s proposal is in the public interest.”
Matter of Citizens for the Preserv. of Wainscott, Inc. v. New York State Pub. Serv. Commn., 216 A.D.3d 769 (N.Y. App. Div. 2d Dep't 2023). “ropriate mitigation, considered and thoroughly mitigated the SFEC project's construction impacts, carefully considered all proposed routes and rationally concluded that the Beach Lane route minimized adverse impacts to the greatest practicable extent, and rationally determined…”
CNG Transmission Corp. v. New York State Pub. Serv. Comm'n, 185 A.D.2d 671 (N.Y. App. Div. 4th Dep't 1992). · cites it 3× “the future; that the pipeline would introduce competition into a monopolistic marketplace and thus lower prices to consumers; that Empire’s pipeline would enhance access to diverse markets of natural gas and would improve the availability and reliability of services; that…”
Skyview Acres Coop., Inc. v. Pub. Serv. Comm'n, 163 A.D.2d 600 (N.Y. App. Div. 2d Dep't 1990). “Additionally, pursuant to Public Service Law § 126 (1) (i), the PSC waived compliance with applicable provisions of the zoning ordinance of the Town of Clarkstown, which would not have permitted construction of the M&R facility at the Buena Vista Road site.”
Vill. of Tuckahoe v. Pub. Serv. Comm'n, 150 A.D.2d 466 (N.Y. App. Div. 2d Dep't 1989). · cites it 2× “e Legislature determined that a new underground electric transmission line was necessary to supply Long Island with electricity from upstate sources, and it amended Public Service Law article VII to foreclose, as unnecessary, consideration by the Public Service Commission of the…”
MatterofEntergyNuclearPowerMarketing,LLCvNewYorkStatePublicServiceCommission, No. 517776 (N.Y. App. Div. 3d Dep't Nov. 13, 2014). · cites it 3× “Ultimately, the Commission concluded that the applicants' proposal met the required statutory findings of Public Service Law § 126 and granted the EC&PN on April 18, 2013.”
Entergy Nuclear Power Mktg., LLC v. New York State Pub. Serv. Comm'n, 122 A.D.3d 1024 (N.Y. App. Div. 3d Dep't 2014). · cites it 3× “Ultimately, the Commission concluded that the applicants’ proposal met the required statutory findings of Public Service Law § 126 and granted the EC&PN on April 18, 2013.”
Entergy Nuclear Power Mktg., LLC v. New York State Pub. Serv. Comm'n, 122 A.D.3d 1024 (N.Y. App. Div. 3d Dep't 2014). · cites it 3× “Ultimately, the Commission concluded that the applicants’ proposal met the required statutory findings of Public Service Law § 126 and granted the EC&PN on April 18, 2013.”
City of New Rochelle v. Pub. Serv. Comm'n, 150 A.D.2d 441 (N.Y. App. Div. 2d Dep't 1989). “Furthermore, we note the absence of long-term noise or visual impact, heightened engineering feasibility, and decreased costs and delays.”
Delaney v. Pub. Serv. Comm'n, 123 A.D.2d 861 (N.Y. App. Div. 2d Dep't 1986). · cites it 2× “Based on the record, we conclude that the commission fully complied with the requirements of Public Service Law § 126 (1) in analyzing the need for the project, its probable environmental impacts, and the manner in which those impacts could be reduced.”