Skip to main content
U.S. CodeTitle 30Chapter 25— Surface Mining Control and ReclamationSubchapter V— Control of the Environmental Impacts of Surface Coal Mining

30 U.S.C. § 1252 (2026)

Initial regulatory procedures

Edition and currency
U.S. Code current through Pub. L. 119-102 (OLRC release point). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTU.S. Code current through Pub. L. 119-102 (OLRC release point) cited 1978–2009 30citing cases
(a) State regulation

No person shall open or develop any new or previously mined or abandoned site for surface coal mining operations on lands on which such operations are regulated by a State unless such person has obtained a permit from the State’s regulatory authority.

(b) Interim standards

All surface coal mining operations on lands on which such operations are regulated by a State which commence operations pursuant to a permit issued on or after six months from August 3, 1977, shall comply, and such permits shall contain terms requiring compliance with, the provisions set out in subsection (c) of this section. Prior to final disapproval of a State program or prior to promulgation of a Federal program or a Federal lands program pursuant to this chapter, a State may issue such permits.

(c) Full compliance with environmental protection performance standards

On and after nine months from August 3, 1977, all surface coal mining operations on lands on which such operations are regulated by a State shall comply with the provisions of subsections (b)(2), (b)(3), (b)(5), (b)(10), (b)(13), (b)(15), (b)(19), and (d) of section 1265 of this title or, where a surface coal mining operation will remove an entire coal seam or seams running through the upper fraction of a mountain, ridge, or hill by removing all of the overburden and creating a level plateau or a gently rolling contour with no highwalls remaining, such operation shall comply with the requirements of section 1265(c)(4) and (5) of this title without regard to the requirements of section 1265(b)(3) or (d)(2) and (3) of this title, with respect to lands from which overburden and the coal seam being mined have not been removed: Provided, however, That surface coal mining operations in operation pursuant to a permit issued by a State before August 3, 1977, issued to a person as defined in section 1291(19) of this title in existence prior to May 2, 1977 and operated by a person whose total annual production of coal from surface and underground coal mining operations does not exceed one hundred thousand tons shall not be subject to the provisions of this subsection except with reference to the provision of section 1265(d)(1) of this title until January 1, 1979.

(d) Permit application

Not later than two months following the approval of a State program pursuant to section 1253 of this title or the implementation of a Federal program pursuant to section 1254 of this title, regardless of litigation contesting that approval or implementation, all operators of surface coal mines in expectation of operating such mines after the expiration of eight months from the approval of a State program or the implementation of a Federal program, shall file an application for a permit with the regulatory authority. Such application shall cover those lands to be mined after the expiration of eight months from the approval of a State program or the implementation of a Federal program. The regulatory authority shall process such applications and grant or deny a permit within eight months after the date of approval of the State program or the implementation of the Federal program, unless specially enjoined by a court of competent jurisdiction, but in no case later than forty-two months from August 3, 1977.

(e) Federal enforcement programWithin six months after August 3, 1977, the Secretary shall implement a Federal enforcement program which shall remain in effect in each State as surface coal mining operations are required to comply with the provisions of this chapter, until the State program has been approved pursuant to this chapter or until a Federal program has been implemented pursuant to this chapter. The enforcement program shall—(1) include inspections of surface coal mine sites which may be made (but at least one inspection for every site every six months), without advance notice to the mine operator and for the purpose of ascertaining compliance with the standards of subsections (b) and (c) above. The Secretary shall order any necessary enforcement action to be implemented pursuant to the Federal enforcement provision of this subchapter to correct violations identified at the inspections;(2) provide that upon receipt of inspection reports indicating that any surface coal mining operation has been found in violation of subsections (b) and (c) above, during not less than two consecutive State inspections or upon receipt by the Secretary of information which would give rise to reasonable belief that such standards are being violated by any surface coal mining operation, the Secretary shall order the immediate inspection of such operation by Federal inspectors and the necessary enforcement actions, if any, to be implemented pursuant to the Federal enforcement provisions of this subchapter. When the Federal inspection results from information provided to the Secretary by any person, the Secretary shall notify such person when the Federal inspection is proposed to be carried out and such person shall be allowed to accompany the inspector during the inspection;(3) provide that the State regulatory agency file with the Secretary and with a designated Federal office centrally located in the county or area in which the inspected surface coal mine is located copies of inspection reports made;(4) provide that moneys authorized by section 1302 of this title shall be available to the Secretary prior to the approval of a State program pursuant to this chapter to reimburse the State for conducting those inspections in which the standards of this chapter are enforced and for the administration of this section.11 So in original. The period probably should be a semicolon.(5) for purposes of this section, the term “Federal inspector” means personnel of the Office of Surface Mining Reclamation and Enforcement and such additional personnel of the United States Geological Survey, Bureau of Land Management, or of the Mining Enforcement and Safety Administration so designated by the Secretary, or such other personnel of the Forest Service, Soil Conservation Service, or the Agricultural Stabilization and Conservation Service as arranged by appropriate agreement with the Secretary on a reimbursable or other basis; 22 So in original. The semicolon probably should be a period.(f) Interim period

Following the final disapproval of a State program, and prior to promulgation of a Federal program or a Federal lands program pursuant to this chapter, including judicial review of such a program, existing surface coal mining operations may continue surface mining operations pursuant to the provisions of this section. During such period no new permits shall be issued by the State whose program has been disapproved. Permits which lapse during such period may continue in full force and effect until promulgation of a Federal program or a Federal lands program.

(Pub. L. 95–87, title V, § 502, Aug. 3, 1977, 91 Stat. 468.)
The 20 cases that cite 30 U.S.C. § 1252 most heavily, weighted by court and treatment. RelevanceNewestTreatment
cites § 1252 12×cited by 1,391 cases
Where it cites § 1252
“Section 501 (a) directs the Secretary to promulgate regulations establishing an interim regulatory program during which mine operators will be required to comply with some of the Act's performance standards, as specified by § 502 (c), 30 U. S. C. § 1252 (c) (1976 ed., Supp. III).”
The case’s holding
Congress may regulate intrastate activities under the Commerce Clause if there is a rational basis for finding that the activity substantially affects interstate commerce.
Later courts cite it for
“summary administrative action may be justified in emergency situations.” · 18 citing courts
2
GREENShawnee Coal Co. v. Cecil D. Andrus, 661 F.2d 1083 (6th Cir. 1981).
cites § 1252 6×cited by 120 cases
Where it cites § 1252
“§ 502(c) of the Act, 30 U.S.C. § 1252 (c), delineates the performance standards that the interim regulatory program must contain.”
The case’s holding
Administrative exhaustion requirements may be excused when pursuing such remedies would be futile (basis: administrative exhaustion may be excused if it would be futile).
Later courts cite it for
“narrow anomaly reserved for extreme situations.” · 5 citing courts
3
GREENIn re Surface Mining Reg. Litig., 456 F. Supp. 1301 (D.D.C. 1978).
cites § 1252 3×cited by 29 cases
Where it cites § 1252
“As was noted above, no building will be entered without a search warrant, therefore, warrantless inspections of the permit area will only be conducted.”
The case’s holding
An agency's interpretation and implementation of a statute is not arbitrary or capricious if the agency makes reasonable policy judgments in uncertain environmental areas.
Later courts cite it for
“(a)lthough a more lenient standard also might be reasonable, the court cannot conclude that the secretary's action in promulgating the regulation was arbitrary, capricious, or inconsistent with law.” · 2 citing courts
4
REDIn re Surface Mining Reg. Litig., 627 F.2d 1346 (D.C. Cir. 1980).
cites § 1252 8×cited by 47 cases
Reversed in part by Hodel v. Virginia Surface Mining & Reclamation Assn., Inc. (1981): the U.S. Supreme Court's own opinion in this case ("79-1596), and we reverse the judgment below insofar as it held various provisions of the A…
Where it cites § 1252
“Section 502(c) of the Act, 30 U.S.C. § 1252 (c), delineates the performance standards that the interim regulatory program must contain.”
The case’s holding
Executive orders lacking a specific foundation in congressional action are not judicially enforceable in private civil suits.
Later courts cite it for
“effect must be given, if possible, to every word, clause and sentence of a statute' ... so that no part will be inoperative or superfluous, void or insignificant.” · 4 citing courts
5
GREENWiggins v. Brazil Coal & Clay Corp., 452 N.E.2d 958 (Ind. 1983).
cites § 1252 4×cited by 12 cases
Where it cites § 1252
“In reaching its decision, the court overlooked the fact that the federal law was not in effect at the time the plaintiffs' cause of action arose.”
The case’s holding
An owner may fully use percolating ground water found beneath its land, but that right does not extend to gratuitously or maliciously injuring neighboring lands and their owners.
Later courts cite it for
“may be put to use to the fullest extent to further enjoyment of the land, however this right does not extend to causing injury gratuitously or maliciously to nearby lands and their owners.” · 2 citing courts
6
GREENWebb v. Fury, 282 S.E.2d 28 (W. Va. 1981).
cites § 1252 2×cited by 33 cases
Where it cites § 1252
“30 U.S.C.A. § 1252 (e)(2). On September 24,1979, Webb and two OSM inspectors met with DLM employees to test several seeps in the vicinity of DLM operations.”
The case’s holding
The constitutional right to petition the government for redress of grievances immunizes such activities from legal action regardless of the underlying cause of action asserted.
Later courts cite it for
“the noerr-pennington doctrine and its application to the facts of this case leads us to conclude that the petitioners' activities involve the exercise of the right to petition” · 2 citing courts
7
GREENUnited States v. River Coal Co., 748 F.2d 1103 (6th Cir. 1984).
cites § 1252 1×cited by 81 cases
Where it cites § 1252
“” On appeal the defendants argue that the “fees” are just that, not “taxes,” and therefore are not nondischargeable debts within § 17.”
The case’s holding
Reclamation fees are taxes because they are involuntary exactions for public purposes rather than benefits for individual payers.
Later courts cite it for
“the chief distinction is that a tax is an exaction for public purposes while a fee relates to an individual privilege or benefit to the payer.” · 7 citing courts
8
GREENHolmes Limestone Co. v. Cecil B. Andrus, 655 F.2d 732 (6th Cir. 1981).
cites § 1252 2×cited by 17 cases
Where it cites § 1252
“§ 1265 , within the authority granted to the Secretary under 30 U.S.C. § 1252 (c). As stated above, interim enforcement of these standards is jointly handled by the OSM and the respective states.”
Later courts cite it for
“serious questions about the propriety” · 1 citing court
9
REDVirginia Surface Mining & Reclamation Ass'n v. Andrus, 483 F. Supp. 425 (W.D. Va. 1980).
cites § 1252 2×cited by 15 cases
Reversed in part by the U.S. Supreme Court in this case: Hodel v. Virginia Surface Mining & Reclamation Assn., Inc. (1981).
Where it cites § 1252
“§ 1251(a), required the Secretary to promulgate regulations establishing an interim regulatory program for surface coal mining and reclamation performance standards based on and incorporating the provisions set out in § 502(c) of the act, 30 U.S.C. § 1252 (c), and any other…”
Later courts cite it for
“ultimately affects the coal mine operator.” · 1 citing court
10
NO FLAGWyatt v. United States, 271 F.3d 1090 (Fed. Cir. 2001).
cites § 1252 1×cited by 215 cases
Where it cites § 1252
“States can issue permits for surface mining, but only if the applicant complied with federal interim standards concerning the environmental impact of the proposed mine.”
11
GREENBelville Mining Co. v. United States, 999 F.2d 989 (6th Cir. 1993).
cites § 1252 1×cited by 43 cases
Where it cites § 1252
“30 U.S.C. §§ 1252 , 1256. As the majority notes, SMCRA banned surface mining in the National Forests outright, 30 U.”
The case’s holding
An agency possesses inherent authority to reconsider and reverse its own erroneous decisions within a reasonable time even in the absence of express statutory authorization.
Later courts cite it for
“even where there is no express reconsideration authority for an agency, however, the general rule is that an agency has inherent authority to reconsider its decision, provided that reconsideration occurs within a reasonable time after the first decision.” · 4 citing courts
12
GREENWest Virginia Highlands Conservancy, Inc. v. Huffman, 651 F. Supp. 2d 512 (S.D. W. Va. 2009).
cites § 1252 2×cited by 5 cases
Where it cites § 1252
“See 30 U.S.C. § 1252 , et seq. SMCRA mandates that the OSM have exclusive regulatory authority over the surface mining reclamation programs of states that have not passed adequate laws governing surface coal mining reclamation.”
Later courts cite it for
“can be met because of a defendant's control over discharges,” · 2 citing courts
cites § 1252 1×cited by 16 cases
Where it cites § 1252
“30 U.S.C. § 1252 (a) (Supp. II 1978) provides: No person shall open or develop any new or previously mined or abandoned site for *1109 surface coal mining operations on lands which such operations are regulated by a State unless such person has obtained a permit from the State’s…”
14
GREENIn re Surface Mining Reg. Litig., 452 F. Supp. 327 (D.D.C. 1978).
cites § 1252 1×cited by 15 cases
Where it cites § 1252
“” 30 U.S.C. § 1252 (c). Section 710.12 of the regulations implements the statutory provision.”
The case’s holding
Interim surface mining regulations may not supersede, amend, repeal, or modify the provisions of the Federal Water Pollution Control Act and its regulations.
Later courts cite it for
“to the extent that they supersede, amend, repeal or modify the provisions of the (federal water pollution control act) and its regulations.” · 2 citing courts
15
GREENHarris v. Adkins, 432 S.E.2d 549 (W. Va. 1993).
cites § 1252 1×cited by 11 cases
Where it cites § 1252
“Webb involved an environmental group and one of its members, Rick Webb, who had written a complaint under the Federal Surface Mining Control and Reclamation Act, 30 U.S.C.A. § 1252 (e)(2), regarding certain violations by a coal company.”
16
REDNat'l Wildlife Fed'n v. Lujan, 733 F. Supp. 419 (D.D.C. 1990).
cites § 1252 1×cited by 8 cases
Reversed by National Wildlife Federation v. Manuel Lujan, Jr., National Coal Association and American Mining Congress, (Two Cases) (1991): the Court of Appeals for the D.C. Circuit's own opinion in this case.
Where it cites § 1252
“SMCRA § 502(a), 30 U.S.C.A. § 1252 (a) (“No person shall open or develop any new or previously mined or abandoned site for surface coal mining operations .”
Later courts cite it for
“maintain the value and reasonably foreseeable use of surface lands.” · 1 citing court
17
REDState of Ind. v. Andrus, 501 F. Supp. 452 (S.D. Ind. 1980).
cites § 1252 2×cited by 3 cases
Reversed by the U.S. Supreme Court in this case: Hodel v. Indiana (1981).
Where it cites § 1252
“] This is commonly denoted as the interim phase, during which period the states must issue permits requiring compliance with the interim aspects of the federal Act [§ 502(a) and (b), 30 U.S.C. § 1252 (a) and (b)]. Most of Title V become effective when either a state program is…”
18
GREENJohn Walters Coal Co. v. Watt, 553 F. Supp. 838 (E.D. Ky. 1982).
cites § 1252 1×cited by 7 cases
Where it cites § 1252
“On May 27, May 30, and September 2, 1980, authorized representatives of the Secretary of the Interior conducted inspections of the plaintiff’s surface mining operations in Knott and Perry Counties, Kentucky, pursuant to 30 U.S.C. § 1252 (e). As a result, the plaintiff was issued…”
cites § 1252 1×cited by 16 cases
Where it cites § 1252
“30 U.S.C. § 1252 (a). To receive a mining permit, operators are required to submit a detailed reclamation plan for the site in question.”
Later courts cite it for
“the basic tenets of statutory construction apply to construction of regulations.” · 4 citing courts
20
GREENUnited States v. Hubler, 117 B.R. 160 (W.D. Pa. 1990).
cites § 1252 1×cited by 5 cases
Where it cites § 1252
“Therefore, forfeiture of the bonds cannot serve to fulfill the defendants’ responsibility for reclamation of the unpermitted area.”

Show all 30 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
197819932009

One bar per year. Tallest: 7 cases in 1981. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
3rd Cir.56th Cir.4D.D.C.4W. Va.3W.D. Va.2N.D. Ala.17th Cir.19th Cir.1

The 8 courts with the most citing cases, of 17 courts in all.

By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Show all 30 citing cases (list view) →

Enactment and amendments
(Pub. L. 95–87, title V, § 502, Aug. 3, 1977, 91 Stat. 468.)
Versions

Edition shown: U.S. Code current through Pub. L. 119-102 (OLRC release point). Syfert holds no earlier or later version of this section.