30 U.S.C. § 185 (2026)
Rights-of-way for pipelines through Federal lands
Edition and currency
Other sources
Courts have cited this section in 73 opinions since 1938, 8 of them in the last five years. The most litigated part is subsection (u) (1 case).
Rights-of-way through any Federal lands may be granted by the Secretary of the Interior or appropriate agency head for pipeline purposes for the transportation of oil, natural gas, synthetic liquid or gaseous fuels, or any refined product produced therefrom to any applicant possessing the qualifications provided in section 181 of this title in accordance with the provisions of this section.
The width of a right-of-way shall not exceed fifty feet plus the ground occupied by the pipeline (that is, the pipe and its related facilities) unless the Secretary or agency head finds, and records the reasons for his finding, that in his judgment a wider right-of-way is necessary for operation and maintenance after construction, or to protect the environment or public safety. Related facilities include but are not limited to valves, pump stations, supporting structures, bridges, monitoring and communication devices, surge and storage tanks, terminals, roads, airstrips and campsites and they need not necessarily be connected or contiguous to the pipe and may be the subjects of separate rights-of-way.
A right-of-way may be supplemented by such temporary permits for the use of Federal lands in the vicinity of the pipeline as the Secretary or agency head finds are necessary in connection with construction, operation, maintenance, or termination of the pipeline, or to protect the natural environment or public safety.
Rights-of-way or permits granted or renewed pursuant to this section shall be subject to regulations promulgated in accord with the provisions of this section and shall be subject to such terms and conditions as the Secretary or agency head may prescribe regarding extent, duration, survey, location, construction, operation, maintenance, use, and termination.
The Secretary or agency head shall impose requirements for the operation of the pipeline and related facilities in a manner that will protect the safety of workers and protect the public from sudden ruptures and slow degradation of the pipeline.
If the applicant is a partnership, corporation, association, or other business entity, the Secretary or agency head shall require the applicant to disclose the identity of the participants in the entity. Such disclosure shall include where applicable (1) the name and address of each partner, (2) the name and address of each shareholder owning 3 per centum or more of the shares, together with the number and percentage of any class of voting shares of the entity which such shareholder is authorized to vote, and (3) the name and address of each affiliate of the entity together with, in the case of an affiliate controlled by the entity, the number of shares and the percentage of any class of voting stock of that affiliate owned, directly or indirectly, by that entity, and, in the case of an affiliate which controls that entity, the number of shares and the percentage of any class of voting stock of that entity owned, directly or indirectly, by the affiliate.
The Secretary or agency head shall grant or renew a right-of-way or permit under this section only when he is satisfied that the applicant has the technical and financial capability to construct, operate, maintain, and terminate the project for which the right-of-way or permit is requested in accordance with the requirements of this section.
The Secretary or agency head by regulation shall establish procedures, including public hearings where appropriate, to give Federal, State, and local government agencies and the public adequate notice and an opportunity to comment upon right-of-way applications filed after the date of enactment of this subsection.
The applicant for a right-of-way or permit shall reimburse the United States for administrative and other costs incurred in processing the application, and the holder of a right-of-way or permit shall reimburse the United States for the costs incurred in monitoring the construction, operation, maintenance, and termination of any pipeline and related facilities on such right-of-way or permit area and shall pay annually in advance the fair market rental value of the right-of-way or permit, as determined by the Secretary or agency head.
Where he deems it appropriate the Secretary or agency head may require a holder of a right-of-way or permit to furnish a bond, or other security, satisfactory to the Secretary or agency head to secure all or any of the obligations imposed by the terms and conditions of the right-of-way or permit or by any rule or regulation of the Secretary or agency head.
Each right-of-way or permit granted or renewed pursuant to this section shall be limited to a reasonable term in light of all circumstances concerning the project, but in no event more than thirty years. In determining the duration of a right-of-way the Secretary or agency head shall, among other things, take into consideration the cost of the facility, its useful life, and any public purpose it serves. The Secretary or agency head shall renew any right-of-way, in accordance with the provisions of this section, so long as the project is in commercial operation and is operated and maintained in accordance with all of the provisions of this section.
In order to minimize adverse environmental impacts and the proliferation of separate rights-of-way across Federal lands, the utilization of rights-of-way in common shall be required to the extent practical, and each right-of-way or permit shall reserve to the Secretary or agency head the right to grant additional rights-of-way or permits for compatible uses on or adjacent to rights-of-way or permit area granted pursuant to this section.
No rights-of-way for the purposes provided for in this section shall be granted or renewed across Federal lands except under and subject to the provisions, limitations, and conditions of this section. Any application for a right-of-way filed under any other law prior to the effective date of this provision may, at the applicant’s option, be considered as an application under this section. The Secretary or agency head may require the applicant to submit any additional information he deems necessary to comply with the requirements of this section.
The Secretary or agency head may ratify and confirm any right-of-way or permit for an oil or gas pipeline or related facility that was granted under any provision of law before the effective date of this subsection, if it is modified by mutual agreement to comply to the extent practical with the provisions of this section. Any action taken by the Secretary or agency head pursuant to this subsection shall not be considered a major Federal action requiring a detailed statement pursuant to section 102(2)(C) of the National Environmental Policy Act of 1970 (Public Law 90–190; 42 U.S.C. 4321).1
Any domestically produced crude oil transported by pipeline over rights-of-way granted pursuant to this section, except such crude oil which is either exchanged in similar quantity for convenience or increased efficiency of transportation with persons or the government of an adjacent foreign state, or which is temporarily exported for convenience or increased efficiency of transportation across parts of an adjacent foreign state and reenters the United States, shall be subject to all of the limitations and licensing requirements of the Export Administration Act of 1979 (50 U.S.C. App. 2401 and following) 2
The Secretary or agency head shall take into consideration and to the extent practical comply with State standards for right-of-way construction, operation, and maintenance.
The grant of a right-of-way or permit pursuant to this section shall grant no immunity from the operation of the Federal antitrust laws.
The National Environmental Policy Act of 1969, referred to in subsec. (h)(1), is Pub. L. 91–190, Jan 1, 1970, 83 Stat. 852, which is classified generally to chapter 55 (§ 4321 et seq.) of Title 42, The Public Health and Welfare. For complete classification of this Act to the Code, see Short Title note set out under section 4321 of Title 42 and Tables.
The date of enactment of this subsection, referred to in subsec. (k), the effective date of this provision, referred to in subsec. (q), and the effective date of this subsection, referred to in subsec. (t), probably mean the date of approval of Pub. L. 93–153, which was
The Natural Gas Act, referred to in subsec. (r)(3)(A), is act June 21, 1938, ch. 556, 52 Stat. 821, which is classified generally to chapter 15B (§ 717 et seq.) of Title 15, Commerce and Trade. For complete classification of this Act to the Code, see section 717w of Title 15 and Tables.
The International Emergency Economic Powers Act, referred to in subsec. (s)(3), is title II of Pub. L. 95–223,
The National Emergencies Act, referred to in subsec. (s)(3), is Pub. L. 94–412,
The Energy Policy and Conservation Act, referred to in subsec. (s)(3), is Pub. L. 94–163,
The Export Administration Act of 1979, referred to in subsec. (u), is Pub. L. 96–72,
In subsec. (s)(2), “section 50501 of title 46” substituted for “section 2 of the Shipping Act, 1916 (46 U.S.C. App. 802)” on authority of Pub. L. 109–304, § 18(c),
1995—Subsec. (s). Pub. L. 104–58 amended heading and text of subsec. (s) generally. Prior to amendment, subsec. (s) provided that the Secretary of Interior, in consultation with Federal and State agencies, review need for national system of transportation and utility corridors across Federal lands and report to Congress and the President by
Subsec. (w)(4). Pub. L. 104–66 struck out par. (4) which read as follows: “The Secretary of the Department of Transportation shall report annually to the President, the Congress, the Secretary of the Interior, and the Secretary of Energy any potential dangers of or actual explosions, or potential or actual spillage on Federal lands and shall include in such report a statement of corrective action taken to prevent such explosion or spillage.”
1994—Subsec. (w)(1), (2). Pub. L. 103–437 substituted “Natural Resources” for “Interior and Insular Affairs” before “of the United States House”.
1990—Subsec. (w)(1). Pub. L. 101–475, § 1(a), substituted “Committee on Interior and Insular Affairs of the United States House of Representatives and the Committee on Energy and Natural Resources of the United States Senate” for “House and Senate Committees on Interior and Insular Affairs”.
Subsec. (w)(2). Pub. L. 101–475, § 1(b), amended par. (2) generally. Prior to amendment, par. (2) read as follows: “The Secretary or agency head shall notify the House and Senate Committees on Interior and Insular Affairs promptly upon receipt of an application for a right-of-way for a pipeline twenty-four inches or more in diameter, and no right-of-way for such a pipeline shall be granted until sixty days (not counting days on which the House of Representatives or the Senate has adjourned for more than three days) after a notice of intention to grant the right-of-way, together with the Secretary’s or agency head’s detailed findings as to terms and conditions he proposes to impose, has been submitted to such committees, unless each committee by resolution waives the waiting period.”
1985—Subsec. (u). Pub. L. 99–64 substituted “Export Administration Act of 1979 (50 U.S.C. App. 2401 and following)” for “Export Administration Act of 1969 (Act of
1973—Pub. L. 93–153 completely rewrote the section substituting 25 subsecs. lettered (a) through (y) covering all aspects of the granting of rights-of-way for pipelines through Federal lands for the former single unlettered paragraph under which rights-of-way of 25 feet on each side of the pipeline could be granted and under which the pipeline was to be operated as a common carrier.
1953—Act
1935—Act
“Secretary of Energy or Federal Energy Regulatory Commission” substituted for “Interstate Commerce Commission or Federal Power Commission” in subsec. (r)(5) pursuant to sections 301(b), 306, 402(a), (b), 703, and 707 of Pub. L. 95–91, which are classified to sections 7151(b), 7155, 7172(a), (b), 7293, and 7297 of Title 42, The Public Health and Welfare, and which transferred functions vested in the Interstate Commerce Commission, and Chairman and members thereof, relating to transportation of oil by pipeline to the Secretary of Energy (except for certain functions which were transferred to the Federal Energy Regulatory Commission within the Department of Energy), and terminated the Federal Power Commission and transferred its functions to the Secretary of Energy (except for certain functions which were transferred to the Federal Energy Regulatory Commission).
Pub. L. 105–277, div. A, § 101(e) [title II],
Similar provisions were contained in the following prior appropriation acts:
Pub. L. 105–83, title II,
Pub. L. 104–208, div. A, title I, § 101(d) [title II],
Pub. L. 104–134, title I, § 101(c) [title II],
Pub. L. 103–332, title II,
Pub. L. 103–138, title II,
Pub. L. 102–381, title II,
Pub. L. 102–154, title II,
Pub. L. 104–58, title II, § 202,
Pipeline rights-of-way in connection with oil, gas, and other leases on submerged lands of outer Continental Shelf, see section 1334 of Title 43, Public Lands.
Enforcement functions of Secretary or other official in Department of the Interior related to compliance with grants of rights-of-way and temporary use permits for Federal land and such functions of Secretary or other official in Department of Agriculture, insofar as they involve lands and programs under jurisdiction of Department of Agriculture, related to compliance with associated land use permits authorized for and in conjunction with grants of rights-of-way across Federal lands issued under this section with respect to pre-construction, construction, and initial operation of transportation system for Canadian and Alaskan natural gas were transferred to the Federal Inspector, Office of Federal Inspector for the Alaska Natural Gas Transportation System, until the first anniversary of date of initial operation of the Alaska Natural Gas Transportation System, see Reorg. Plan No. 1 of 1979, §§ 102(e), (f), 203(a), 44 F.R. 33663, 33666, 93 Stat. 1373, 1376, effective
Memorandum of President of the United States,
Memorandum for the Secretary of Commerce [and] the Secretary of Energy
Pursuant to section 28(s) of the Mineral Leasing Act, as amended, 30 U.S.C. 185, I hereby determine that exports of crude oil transported over right-of-way granted pursuant to section 203 of the Trans-Alaska Pipeline Authorization Act [43 U.S.C. 1652] are in the national interest. In making this determination, I have taken into account the conclusions of an interagency working group, which found that such oil exports:
—will not diminish the total quantity or quality of petroleum available to the United States; and
—are not likely to cause sustained material oil supply shortages or sustained oil price increases significantly above world market levels that would cause sustained material adverse employment effects in the United States or that would cause substantial harm to consumers, including those located in noncontiguous States and Pacific Territories.
I have also considered the interagency group’s conclusions regarding potential environmental impacts of lifting the ban. Based on their findings and recommendations, I have concluded that exports of such crude oil will not pose significant risks to the environment if certain terms and conditions are met.
Therefore, pursuant to section 28(s) of the Mineral Leasing Act I direct the Secretary of Commerce to promulgate immediately a general license, or a license exception, authorizing exports of such crude oil, subject to appropriate documentation requirements, and consistent with the following conditions:
—tankers exporting ANS exports must use the same route that they do for shipments to Hawaii until they reach a point 300 miles due south of Cape Hinchinbrook Light and then turn toward Asian destinations. After reaching that point, tankers in the ANS oil trade must remain outside of the 200 nautical-miles Exclusive Economic Zone of the United States as defined in the Fisheries Conservation and Management Act (16 U.S.C. 1811) [probably means the Magnuson-Stevens Fishery Conservation and Management Act]. This condition also applies to tankers returning from foreign ports to Valdez, Alaska. Exceptions can be made at the discretion of the vessel master only to ensure the safety of the vessel;
—that export tankers be equipped with satellite-based communications systems that will enable the Coast Guard independently to determine their location. The Coast Guard will conduct appropriate monitoring of the tankers, a measure that will ensure compliance with the 200-mile condition, and help the Coast Guard respond quickly to any emergencies;
—the owner or operator of an Alaskan North Slope crude oil export tankship shall maintain a Critical Area Inspection Plan for each tankship in the trade in accordance with the U.S. Coast Guard’s Navigation and Inspection Circular No. 15–91 as amended, which shall include an annual internal survey of the vessel’s cargo block tanks; and
—the owner or operator of an Alaskan North Slope crude oil export tankship shall adopt a mandatory program of deep water ballast exchange (i.e., in 2,000 meters water depth). Exceptions can be made at the discretion of the captain only in order to ensure the safety of the vessel. Recordkeeping subject to Coast Guard audit will be required as part of this regime.
The Secretary of Commerce is authorized and directed to inform the appropriate committees of the Congress of this determination and to publish it in the Federal Register.
- Where it cites § 185
- “- § 408; and (3) a real-estate, easement under the Mineral Leasing Act, 30 U.S.C. § 185 . See ECF No. 172-6 (Memorandum from John Henderson, Omaha District Commander & Engineer, Corps, Dec, 3, 2016), ¶ 4.”
- The case’s holding
- An agency violates NEPA if it fails to adequately consider the impacts of a proposed action on treaty rights, environmental justice, or the degree of controversy.
- Later courts cite it for
- “disagreement with an agency's analysis is not enough to warrant the consideration of extra-record evidence.” · 5 citing courts
- Where it cites § 185
- “The permit decision does not reference any harm to the Parkway's scenic or conservation value or the effectiveness of any mitigation strategies.”
- The case’s holding
- An agency decision is arbitrary and capricious if the agency fails to consider an important aspect of the problem or offers an explanation that runs counter to the evidence.
- Later courts cite it for
- “the causation element of standing does not require the challenged action to be the sole or even immediate cause of the injury.” · 14 citing courts
- Later courts cite it for
- “enact exceedingly clear language if it wishes to significantly alter the balance between federal and state power and the power of the government over private property.” · 6 citing courts
- Where it cites § 185
- “See 30 U.S.C. § 185 (c)(2) ("Where the surface of the Federal lands involved is administered by .”
- The case’s holding
- An agency action is arbitrary and capricious if the agency fails to articulate a rational connection between the facts found and the choice made.
- Later courts cite it for
- “we may hold unlawful and set aside a federal agency action for certain specified reasons, including whenever the challenged act is arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with the law.” · 5 citing courts
- Where it cites § 185
- “Related Mineral Leasing Act Claim (Count IS) In a related argument, plaintiffs also assert that the Mineral Leasing Act (“MLA”), 30 U.S.C. § 185 , requires DOI and BLM, as a condition of granting the right-of-way, to “evaluate whether Williams currently has the financial…”
- The case’s holding
- NEPA is essentially procedural; an agency need only take a hard look at environmental consequences, and socioeconomic effects must be considered only when they result from a project's environmental impact.
- Later courts cite it for
- “only when socioeconomic effects somehow result from a project's environmental impact must they be considered.” · 2 citing courts
- Where it cites § 185
- “582 , 30 U. S. C. § 185 (u) (oil exports). [9] Congress found that under the agency's "very broad authority to prohibit conduct which is `unfair or deceptive'.”
- The case’s holding
- Legislative actions require both Houses of Congress to pass the measure and the President to sign it to satisfy the constitutional requirements of bicameralism and presentment.
- Later courts cite it for
- “all matters on which the validity of the final order is contingent.” · 43 citing courts
- Where it cites § 185
- “Appellants contend that issuance of certain rights-of-way and special land use permits by the Secretary of the Interior to Alyeska and to the State of Alaska would violate Section 28 of the Mineral Leasing Act of 1920, 30 U.S.C. § 185 (1970), by exceeding the width limitation of…”
- The case’s holding
- Courts must attempt to reconcile conflicting statutes to give effect to the language and intent of both without depriving either of its essential meaning.
- Later courts cite it for
- “courts should make every effort to reconcile allegedly conflicting statutes and to give effect to the language and intent of both, so long as doing so does not deprive one or the other of its essential meaning.” · 3 citing courts
- Where it cites § 185
- “Under the Mineral Leasing Act, 30 U.S.C. § 185 , the pipeline could not traverse the federally owned land at the Oahe crossing site without an easement from the Corps.”
- The case’s holding
- When an agency bypasses a fundamental procedural step, the vacatur inquiry asks whether the agency could justify skipping that step rather than whether the ultimate action is justified.
- Later courts cite it for
- “when an agency bypasses a fundamental procedural step, the vacatur inquiry asks not whether the ultimate action could be justified, but whether the agency could, with further explanation, justify its decision to skip that procedural step.” · 10 citing courts
- Where it cites § 185
- “Alyeska itself, which barred an attorney's fees award against an intervenor in an action brought pursuant to the Mineral Lands Leasing Act of 1920, 30 U. S. C. § 185 , did not reverse the fee award because the losing party was an intervenor, but only because there was no…”
- The case’s holding
- Similar language in fee-shifting statutes provides a strong indication that they should be interpreted alike.
- Later courts cite it for
- “fee-shifting statutes' similar language is 'a strong indication' that they are to be interpreted alike.” · 35 citing courts
- Where it cites § 185
- “17 (a), (b); see also 30 U.S.C. § 185 (o). If the BLM terminates a project’s grant or Temporary Use Permit, the applicant must “remove any facilities within the right-of-way or TUP area within a reasonable time, as determined by BLM, unless BLM instructs .”
- The case’s holding
- A conservation agreement intended to mitigate project impacts must be enforceable under the Endangered Species Act to be considered part of the proposed action or an interrelated action.
- Later courts cite it for
- “is a comprehensive scheme with the broad purpose of protecting endangered and threatened species.” · 6 citing courts
- Where it cites § 185
- “" 30 U.S.C. § 185 (a). As relevant here, "Federal lands" means "all lands owned by the United States except lands in the National Park System .”
- Later courts cite it for
- “if the forest service could circumvent the requirements of the 2012 planning rule simply by passing project-specific amendments on an ad hoc basis . . . the substantive requirements in the 2012 planning rule . . . would be meaningless.” · 3 citing courts
- Where it cites § 185
- “See 30 U.S.C. § 185 (a) (authorizing agencies to issue rights of way for transportation of oil and gas across federal lands); 25 U.”
- The case’s holding
- Federal agencies are not required to conduct a NEPA analysis of an entire project when their regulatory actions only authorize discrete segments of that project.
- Later courts cite it for
- “requires federal agencies to take a 'hard look' at their proposed actions' environmental consequences in advance of deciding whether and how to proceed.” · 6 citing courts
- Where it cites § 185
- “, 30 U.S.C. § 185 et seq.) Consistent with its practice of retaining the value of the subsurface to the United States, Congress passed a law providing that the government could grant leases for oil and gas deposits “in or under lands embraced in railroad or other rights of way…”
- The case’s holding
- A railroad's right to use the subsurface beneath its rights-of-way is limited to purposes supporting the construction or operation of the railroad.
- Later courts cite it for
- “to support the construction or operation of the railroad (i.e., for railroad purposes).” · 2 citing courts
- Where it cites § 185
- “84, 87 (2006); see 30 U.S.C. § 185 (a). “The MLA regulates the location of interstate pipelines across most federal lands,” which “includes approving rights of way and easements for the siting of those pipelines.”
- Where it cites § 185
- “30 U.S.C. § 185 (1988 & Supp. V 1993). The MLA provided that such oil was subject to all of the limitations and licensing requirements of the 1969 EAA 30 U.”
- The case’s holding
- The statute of limitations begins to run when a claimant suffers a compensable injury rather than when the precise amount of damages can be calculated.
- Later courts cite it for
- “the statutory period begins to run when a claimant has suffered a compensable injury, not when he is finally able to calculate the precise quantum of his damages.” · 2 citing courts
- Where it cites § 185
- “Alyeska can be read to stand for the proposition that courts should not award attorney's fees under 30 U.S.C. § 185 , or 42 U.S.C. §§ 4321 et seq.”
- The case’s holding
- An equity court may award attorney fees against a losing party if that party practiced fraud, willful negligence, or malice.
- Later courts cite it for
- “fraud, willful negligence or malice has been practiced.” · 6 citing courts
- Where it cites § 185
- “See 30 U.S.C. § 185 (1988). It is by no means clear that this definition excludes carbon dioxide gas.”
- The case’s holding
- A reservation for gas includes carbon dioxide when the statutory intent supports such inclusion regardless of the perceived value of the substance at the time of the reservation.
- Later courts cite it for
- “in interpreting statutes, we begin with the relevant language.” · 4 citing courts
- Where it cites § 185
- “In 1969, the plaintiffs applied to the Secretary of the Interior, pursuant to section 28 of the Mineral Leasing Act of 1920, 30 U.S.C. § 185 (1970) (amended 1973), for a right of way for a pipeline to transport crude oil across Alaska from recently discovered oil fields on the…”
- The case’s holding
- Payments exacted in violation of a statute intended to benefit the payor are recoverable even if the payor failed to protest at the time of payment.
- Later courts cite it for
- “where the payments were exacted in violation of a statute intended to benefit the person seeking recovery, it is immaterial that the person failed to protest when making the payment” · 2 citing courts
- Where it cites § 185
- “, and 30 U.S.C. § 185 (as amended 1973). These arguments fail for two reasons.”
- Where it cites § 185
- “" 30 U.S.C. § 185 (w)(3) (emphasis added). Congress later enacted the Pipeline Safety Act of 1979 ("PSA").”
Show all 73 citing cases (list view) →
The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.
One bar per 2 years. Tallest: 5 cases in 1952–1953. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.
The 8 courts with the most citing cases, of 30 courts in all.
Amendment years (notes): 1995, 1994, 1990, 1985, 1973, 1953, 1935
Edition shown: U.S. Code current through Pub. L. 119-102 (OLRC release point). Syfert holds no earlier or later version of this section.