Already have an account? Sign in instead.
You stay signed in for 30 days on this browser.
Continue with Google Continue with MicrosoftNo account yet? Create a free one.
We sent a six-digit code.
It expires in ten minutes, works once, and only in this browser. Five wrong tries void it. Send another code.
Your account is live and the Cloudflare checks are off for this browser.
General credit for flood control
Within one year after
The guidelines established under subsection (a) shall provide for the Secretary to consider, in analyzing the costs and benefits of a proposed project for flood control, the costs and benefits produced by any flood control work carried out by non-Federal interests that the Secretary determines to be compatible with the project. For purposes of the preceding sentence the Secretary may consider only work carried out after the date which is 5 years before the first obligation of funds for the reconnaissance study for such project. In no case may work which was carried out more than 5 years before
The Secretary shall consider, under subsections (b) and (c), work carried out before
The Secretary shall consider work carried out after
Any flood control work included as part of the non-Federal share of the cost of a project under this section shall not be subject to the limitation contained in the last sentence of section 1962d–5a(a) of title 42.
Nothing in this section affects the requirement of section 2213(a)(1)(A) of this title.
This Act, referred to in subsecs. (b) and (c), is Pub. L. 99–662,
Edition shown: U.S. Code current through Pub. L. 119-102 (OLRC release point). Syfert holds no earlier or later version of this section.