33 U.S.C. § 2282f (2026)
Review of resiliency assessments
Edition and currency
Other sources
Not later than 180 days after
Upon the request of a non-Federal interest, in carrying out a feasibility study for a project for flood risk mitigation, hurricane and storm damage risk reduction, or ecosystem restoration under section 2282 of this title, the Secretary shall consider whether the need for the project is predicated upon or exacerbated by conditions related to sea level rise or inland flooding.
To the maximum extent practicable, in carrying out a study pursuant to paragraph (1), the Secretary shall document the potential effects of sea level rise or inland flooding on the project, and the expected benefits of the project relating to sea level rise or inland flooding, during the 50-year period after the date of completion of the project.
Section was enacted as part of the Water Resources Development Act of 2020, and not as part of the Water Resources Development Act of 1986 which comprises this chapter.
Secretary means the Secretary of the Army, see section 2 of div. AA of Pub. L. 116–260, set out as a note under section 2201 of this title.
Edition shown: U.S. Code current through Pub. L. 119-102 (OLRC release point). Syfert holds no earlier or later version of this section.