Default in contract; disposition of amounts collected

Edition and currency
U.S. Code current through Pub. L. 119-102 (OLRC release point). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTU.S. Code current through Pub. L. 119-102 (OLRC release point)

Any amounts collected from defaulting contractors or their sureties under contracts entered into in connection with river and harbor or flood-control work prosecuted by the Engineer Department, whether collected in cash or by deduction from amounts otherwise due such contractors, hereafter shall be credited in each case to the appropriation under which the contract was made.

(Aug. 30, 1935, ch. 831, § 8, 49 Stat. 1048.)