42 U.S.C. § 8352
Permanent exemptions
After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a powerplant, the Secretary shall, by order, grant a permanent exemption under this subsection, if he finds that the petitioner has demonstrated that such powerplant will be maintained and operated only for emergency purposes (as defined by rule by the Secretary).
After consideration of a petition (and comments thereon) for an exemption from one or more of the prohibitions of part A for a powerplant, the Secretary shall, by order, grant a permanent exemption under this subsection for the use of liquefied natural gas if the Administrator of the Environmental Protection Agency (or the appropriate State air pollution control agency) has certified to the Secretary that the use of coal by such powerplant as a primary energy source will cause or contribute to a concentration, in an air quality control region or any area within such region, of a pollutant for which any national ambient air quality standard is or would be exceeded for such region or area and the use of coal would not comply with applicable environmental requirements.
This chapter, referred to in subsec. (b)(3), was in the original “this Act”, meaning Pub. L. 95–620,
1987—Subsecs. (a)(1), (b), (d)(1). Pub. L. 100–42, § 1(c)(10), struck out “or installation” after “powerplant” wherever appearing.
Subsec. (d)(2). Pub. L. 100–42, § 1(c)(12)(A), struck out par. (2) which read as follows: “In the case of an existing major fuel-burning installation, the percentage determined by the Secretary under subparagraph (B) of paragraph (1) shall not be less than 25 percent.”
Subsec. (d)(3). Pub. L. 100–42, § 1(c)(12)(B), substituted “The” for “In the case of an existing electric powerplant, the”.
Subsec. (e). Pub. L. 100–42, § 1(c)(10), struck out “or installation” after “powerplant” wherever appearing.
Subsec. (j). Pub. L. 100–42, § 1(c)(12)(C), struck out subsec. (j) which related to granting, by Secretary of Energy, of permanent exemptions for use of natural gas for installations served by international pipelines.
Subsec. (k). Pub. L. 100–42, § 1(c)(12)(C), struck out subsec. (k) which related to granting, by Secretary of Energy, of permanent exemptions for use of natural gas or petroleum for installations based upon product or process requirements.
Subsec. (l). Pub. L. 100–42, § 1(c)(12)(C), struck out subsec. (l) which related to granting, by Secretary of Energy, of permanent exemptions for use of natural gas or petroleum for installations necessary to meet scheduled equipment outages.
For effectiveness of exemption for certain electric powerplants as prior to 180 days after