Utah Code § 54-8c-2 (2026)

Notification to public utility -- Protective measures -- Procedures -- Payment

✓ laws through the 2026 General Session (checked Sept. 2026)
Find cases: SyfertCases citing this section UT-LEGle.utah.gov JustiaTitle on Justia CornellLII Search CasesGoogle Scholar
No person or thing may be brought within 10 feet of any high voltage overhead line unless:
a responsible party has notified the public utility operating the high voltage overhead line of the intended activity; and
a responsible party and the public utility have completed mutually satisfactory precautions for the activity.
If the identity of the public utility owning or operating the high voltage overhead line is unknown, the county clerk in the county where the line is located shall provide the name, address, and telephone number of the utility's designated representative. If there is an association as provided in Section 54-8c-6 in the county, the association shall provide this information. The notification required in Subsection (1)(a) shall be given by telephone or in person and shall include the location and duration of the proposed activity.
Mutually satisfactory precautions required in Subsection (1)(b) may include:
coordination of work, construction, and activity schedules;
placement of temporary mechanical barriers to separate and prevent contact between persons or things and the high voltage overhead line;
temporary deenergization and grounding or temporary relocation or raising of the high voltage overhead line.
If a responsible party is under contract or agreement with a governmental entity, and the governmental entity and the public utility operating the high voltage overhead line have already reached agreement concerning precautions, further agreements for the activity are not required.
All responsible parties are obligated to pay to the public utility operating the high voltage overhead line the cost of mutually satisfactory precautions, except if:
prior arrangements for payment have been made between a governmental entity for whom the work is to be done and the public utility operating the line; or
the public utility operating the line has not installed the line in conformance with the National Electrical Safety Code or its preceding code in effect at the time the line was constructed.
Unless other arrangements are necessary, the public utility operating the high voltage overhead line shall commence the precautionary measures:
within three business days after the date an agreement for payment, if required, has been reached; or
if no payment is required, within five business days after the date of the request of a responsible party.
The public utility shall not be required to provide the precautionary measures until an agreement for payment, if required, has been reached. Once started, the precautionary measures shall continue without unreasonable interruption until completed.

Enacted by Chapter 250, 1988 General Session

Notes of Decisions
Cited in 3 cases, 2004–2015 · leading case: Flowell Elec. Ass'n v. Rhodes Pump, LLC, 2015 UT 87, 361 P.3d 91.
Flowell Elec. Ass'n v. Rhodes Pump, LLC, 2015 UT 87, 361 P.3d 91. · cites it 17× “§ 54-8c-2. 12 If a responsible party has notified the public utility of certain intended activity within ten feet of a power line and then wants to take actions outside of the scope of that intended activity, then that party would be required to renotify the utility.”
Snyder v. PacifiCorp, 316 F. Supp. 2d 1247 (D. Utah 2004). · cites it 3× “PacifiCorp, in turn, filed a Third-Party Complaint against SLVS & G for indemnification, alleging that SLVS & G failed to notify it that Snyder would be performing work near overhead power lines as required by the High Voltage Overhead Lines Act (“HVOLA”), Utah Code Annotated…”
Flowell v. Rhodes, 2015 UT 87. · cites it 19× “§ 54-8c-2. 12 If a responsible party has notified the public utility of 11 By requiring “communication” of the intended activity, we do not mean to foreclose the possibility that accepted trade language or knowledge may come into play.”
Utah Code § 54-8c-2(1): 2 cases
Flowell Elec. Ass'n v. Rhodes Pump, LLC, 2015 UT 87, 361 P.3d 91. “§ 54-8c-2. 12 If a responsible party has notified the public utility of certain intended activity within ten feet of a power line and then wants to take actions outside of the scope of that intended activity, then that party would be required to renotify the utility.”
Flowell v. Rhodes, 2015 UT 87. “§ 54-8c-2. 12 If a responsible party has notified the public utility of 11 By requiring “communication” of the intended activity, we do not mean to foreclose the possibility that accepted trade language or knowledge may come into play.”
Utah Code § 54-8c-2(1)(a): 2 cases
Flowell Elec. Ass'n v. Rhodes Pump, LLC, 2015 UT 87, 361 P.3d 91. “§ 54-8c-2. 12 If a responsible party has notified the public utility of certain intended activity within ten feet of a power line and then wants to take actions outside of the scope of that intended activity, then that party would be required to renotify the utility.”
Flowell v. Rhodes, 2015 UT 87. “§ 54-8c-2. 12 If a responsible party has notified the public utility of 11 By requiring “communication” of the intended activity, we do not mean to foreclose the possibility that accepted trade language or knowledge may come into play.”
Utah Code § 54-8c-2(1)(b): 2 cases
Flowell Elec. Ass'n v. Rhodes Pump, LLC, 2015 UT 87, 361 P.3d 91. “§ 54-8c-2. 12 If a responsible party has notified the public utility of certain intended activity within ten feet of a power line and then wants to take actions outside of the scope of that intended activity, then that party would be required to renotify the utility.”
Flowell v. Rhodes, 2015 UT 87. “§ 54-8c-2. 12 If a responsible party has notified the public utility of 11 By requiring “communication” of the intended activity, we do not mean to foreclose the possibility that accepted trade language or knowledge may come into play.”
Utah Code § 54-8c-2(2): 2 cases
Flowell Elec. Ass'n v. Rhodes Pump, LLC, 2015 UT 87, 361 P.3d 91. “§ 54-8c-2. 12 If a responsible party has notified the public utility of certain intended activity within ten feet of a power line and then wants to take actions outside of the scope of that intended activity, then that party would be required to renotify the utility.”
Flowell v. Rhodes, 2015 UT 87. “§ 54-8c-2. 12 If a responsible party has notified the public utility of 11 By requiring “communication” of the intended activity, we do not mean to foreclose the possibility that accepted trade language or knowledge may come into play.”
Utah Code § 54-8c-2(6)(b): 2 cases
Flowell Elec. Ass'n v. Rhodes Pump, LLC, 2015 UT 87, 361 P.3d 91. “§ 54-8c-2. 12 If a responsible party has notified the public utility of certain intended activity within ten feet of a power line and then wants to take actions outside of the scope of that intended activity, then that party would be required to renotify the utility.”
Flowell v. Rhodes, 2015 UT 87. “§ 54-8c-2. 12 If a responsible party has notified the public utility of 11 By requiring “communication” of the intended activity, we do not mean to foreclose the possibility that accepted trade language or knowledge may come into play.”
Utah Code § 54-8c-2(l): 1 case
Snyder v. PacifiCorp, 316 F. Supp. 2d 1247 (D. Utah 2004). “PacifiCorp, in turn, filed a Third-Party Complaint against SLVS & G for indemnification, alleging that SLVS & G failed to notify it that Snyder would be performing work near overhead power lines as required by the High Voltage Overhead Lines Act (“HVOLA”), Utah Code Annotated…”
Annotations are extracted automatically from the opinions in the Syfert caselaw corpus and ranked by authority, recency, and treatment. Dots show Syfertize treatment of the citing case itself.