Wyoming Statutes
Wyo. Stat. § 16-6-707 (2026)
Construction management alternate delivery
✓ current as of May 2026
Find cases:
SyfertCases citing this section
WY-LEGwyoleg.gov
JustiaTitle on Justia
CornellLII Search
CasesGoogle Scholar
method.
(a) Excluding contracts for professional services,
construction management and design-build delivery negotiations
by public entities and construction managers shall be in
accordance with residency and preference requirements imposed
under W.S. 16-6-101 through 16-6-107.
(b) Formal requests for proposal for preconstruction or
construction services by a construction manager or a design-
builder submitted by a public entity shall require at least the
following information:
(i) The location of the primary place of business;
(ii) The name and identification of individuals to be
assigned to the project;
(iii) Experience with similar projects;
(iv) Qualifications;
(v) Ability to protect the interests of the public
entity during the project;
(vi) Ability to meet project budget and time schedule
requirements;
(vii) Excluding contracts for professional services,
compliance with W.S. 16-6-101 through 16-6-107; and
(viii) For design-build alternative construction
delivery methods, the names of the prime consultants used for
architectural and engineering design services.
(c) Negotiations between a public entity and a
construction manager at-risk shall require that the construction
manager at-risk comply with the residency and preference
requirements imposed under W.S. 16-6-101 through 16-6-107 in the
procurement of subcontractors and materials.